  369  
 | 
27 Sep 2023, 07:24 | 
Romain Letrun | SPB | Shift summary | Shift summary for 26.9.2023
 
 
X-ray delivery
 
 
 
	6.3 keV, ~4 mJ, 1-352 pulses | 
   |  | 
  368  
 | 
24 Sep 2023, 09:24 | 
Peter Zalden | FXE | Shift summary | 7:00 Power glitch during SPB operation 
- they were supposed to hand the beam back 
at 7:30h | 
   |  | 
  367  
 | 
24 Sep 2023, 09:16 | 
Peter Zalden | FXE | Shift summary | Summary for sept., 23rd
 
 
6:55 SPB just handed the beam over 
to FXE when the power glitch killed the interlocks | 
   |  | 
  365  
 | 
24 Sep 2023, 08:05 | 
Jan Gruenert | PRC | Status | 8h05 Beam is switched back on in SASE2. 
HED ready for taking beam.
 
 
8h45 BKR is having problems to | 
   |  | 
  366  
 | 
24 Sep 2023, 07:49 | 
Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, Teguh | SCS | summary of 23.09 | Around 6:55 there was a power glitch. Power 
in the experimental hutch and rack room went 
down in SASE3, error message in Xray interlock | 
   |  | 
  364  
 | 
24 Sep 2023, 07:28 | 
Raphael de Wijn | SPB | Shift summary | X-ray delivery
 
 
 
	7 keV 202 pulses 1.6mJ 
stabel across train and throughout the shift
 
	Beam | 
   |  | 
  363  
 | 
24 Sep 2023, 07:19 | 
Jan Gruenert | PRC | Attention | Again: power outage !
 
 
As yesterday, at around 7am, power 
was lost in Schendfeld at SASE3. No beam | 
   |  | 
  362  
 | 
23 Sep 2023, 23:31 | 
Motoaki Nakatsutsumi | HED | Shift summary | During the morning shift (7am - 3pm), we 
couldn't take any meaningful data due 
to the issue of power glitch which caused | 
   |  | 
  361  
 | 
23 Sep 2023, 15:35 | 
Jan Gruenert | PRC | Issue | SASE2 :
 
The unavailability of karabo and possibly 
missing cooling water is a problem for | 
   |  | 
  360  
 | 
23 Sep 2023, 14:49 | 
Jan Gruenert | PRC | Status | Update of power outage aftermath
 
 
Achieved 
by now / status
 
 
 
	SASE1
 
	
 
		beam | 
   |  | 
  359  
 | 
23 Sep 2023, 08:50 | 
Jan Gruenert | PRC | Issue | Updates on power glitch
 
 
8h50 No feedback from TS-OCD (still 
not arrived at SASE3 / SCS ?). Phone is busy. | 
      |  | 
  358  
 | 
23 Sep 2023, 08:14 | 
Peter Zalden | FXE | Issue | FXE interlock in fault state. See photo 
attached with original error message from 
6:53h. It cannot be reset by acknowledging. | 
    |  | 
  357  
 | 
23 Sep 2023, 07:59 | 
Oliver Humphries | HED | Shift summary | Shift summary from Monday 18th 7am until 
Saturday 7am
 
 
MONDAY
 
 
 
	Aligned | 
   |  | 
  356  
 | 
23 Sep 2023, 07:31 | 
Jan Gruenert | PRC | Issue | 7:23: RC info:
 
an electrical power glitch interrupted 
beam operation, machine down. DESY has power | 
   |  | 
  355  
 | 
23 Sep 2023, 07:04 | 
Adam Round | SPB | Shift end | Staff:JK, RDW, AR
 
 
X-ray delivery
 
 
 
	7 keV 202 pulses 1.7mJ | 
   |  | 
  354  
 | 
22 Sep 2023, 17:46 | 
Jan Gruenert | PRC | Status | SASE3 gas supply alarm
 
 
SCS 
called the PRC at 17h04 due to a loud audible 
alarm in XHEXP1 and contacted also TS-OCD. | 
   |  | 
  353  
 | 
22 Sep 2023, 07:27 | 
Raphael de Wijn | SPB | Shift summary | X-ray delivery
 
 
 
	7 keV, 202 pulses, 564 
kHz, ~1.3 mJ, stable delivery
 
 
 
Optical | 
   |  | 
  352  
 | 
22 Sep 2023, 06:51 | 
Benjamin van Kuiken | SCS | Shift summary | Achievemnets
 
 
 
	Characterized the X-ray 
and laser danage on the STO2LNO2
 
 
 
Problems | 
   |  | 
  351  
 | 
22 Sep 2023, 00:56 | 
Jan Gruenert | PRC | SA1 status | As agreed beforehand, PRC and SPB/SFX re-assessed 
the SA1 EPS power limit based on actual performance, 
required number of pulses and rep rate, at | 
   |  | 
  350  
 | 
21 Sep 2023, 09:24 | 
Jan Gruenert | PRC | SA1 status | Info by R.Kammering (mail 20.9.23 18h25), 
related to the SA1 intensity drops 
during large wavelength scans: | 
   |   
 |