Entry   Shift summary, posted by Romain Letrun on 27 Sep 2023, 07:24 
Shift summary for 26.9.2023

X-ray delivery


6.3 keV, ~4 mJ, 1-352 pulses at 1.13 MHz
Great performance and stable delivery with few minor interruptions


Optical
Entry   Shift summary, posted by Peter Zalden on 24 Sep 2023, 09:24 
7:00 Power glitch during SPB operation - they were supposed to hand the beam back at 7:30h


Power glitch brought down FXE interlock system with beam stop monitor alarm that could not be reset
SA1 PPL running fine,
seems unaffected


9:10 Beam back in SA1, but still at 7 keV and cannot be changed by BKR to the req'd 5.8 keV, 94 kHz.
Entry   Shift summary, posted by Peter Zalden on 24 Sep 2023, 09:16 
Summary for sept., 23rd

6:55 SPB just handed the beam over to FXE when the power glitch killed the interlocks and brought down ACC

11:30 After a lot of communication with PRC, Wolfgang Clement and DOC, the beam is back in SA1. We request change to 5.5 keV
Entry   Status, posted by Jan Gruenert on 24 Sep 2023, 08:05 
8h05 Beam is switched back on in SASE2. HED ready for taking beam.

8h45 BKR is having problems to turn on SA2 beam. Not due to any 

Beam actually went down in all beamlines today at 7:02 (for the records).
Entry   summary of 23.09, posted by Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, Teguh on 24 Sep 2023, 07:49 
Around 6:55 there was a power glitch. Power in the experimental hutch and rack room went down in SASE3, error message in Xray interlock system and no
power for PP laser.

During morning TS turned the power on and interlock issues were solved by DESY. SCS could restart large part of SCS systems, however got help
Entry   Shift summary, posted by Raphael de Wijn on 24 Sep 2023, 07:28 
X-ray delivery


7 keV 202 pulses 1.6mJ stabel across train and throughout the shift
Beam down at 7am again, power glitch same as yesterday


Achievements/Observations


faster changover and alignment
YAG on nozzle worked
collected data the droplets in oil sample delivery method -
Entry   Attention, posted by Jan Gruenert on 24 Sep 2023, 07:19 
Again: power outage !

As yesterday, at around 7am, power was lost in Schendfeld at SASE3. No beam permission, accelerator in TLD mode.
SASE3 has no power, TS-OCD informed and on the way. BKR informs MKK to check cooling water pumps.
Entry   Shift summary, posted by Motoaki Nakatsutsumi on 23 Sep 2023, 23:31 
During the morning shift (7am - 3pm), we couldn't take any meaningful data due to the issue of power glitch which caused the beam permission error
(AIBS) and down of SASE2 Karabo / Online-GPFS due to the lack of cooling in the rack room.

During the late shift (3 pm - 11 pm), after these issues were solved thanks to PRC/DOC/ITDM/EEE at 5 pm..., we could get back in operation relatively
Entry   Issue, posted by Jan Gruenert on 23 Sep 2023, 15:35 
SASE2 :
The unavailability of karabo and possibly missing cooling water is a problem for the tunnel components as well.
XGM in XTD6 : server error since about 11am. We don't know about the status of this device anymore, neither from DOOCS or karabo.
Entry   Status, posted by Jan Gruenert on 23 Sep 2023, 14:49 
Update of power outage aftermath

Achieved by now / status


SASE1

​beam delivery and FXE operating fine (beam back since about 11h30)


SASE3

SA3
getting beam since about 11h30, again difficulties / no beam between 12h30 - 13h34, currently ok.
SASE3 Optical PP laser issues since the morning.
Entry   Issue, posted by Jan Gruenert on 23 Sep 2023, 08:50 JG_2023-09-23_um_10.28.37.pngJG_2023-09-23_um_10.43.59.pngJG_2023-09-23_um_12.46.35.png
Updates on power glitch

8h50 No feedback from TS-OCD (still not arrived at SASE3 / SCS ?). Phone is busy. Apparently they are busy working on it in the hall (confirmed
at 9h00).
Entry   Issue, posted by Peter Zalden on 23 Sep 2023, 08:14 20230923_074956.jpg
FXE interlock in fault state. See photo attached with original error message from 6:53h. It cannot be reset by acknowledging. BKR is informed and they
are contacting MPS OCD.
Entry   Shift summary, posted by Oliver Humphries on 23 Sep 2023, 07:59 
Shift summary from Monday 18th 7am until Saturday 7am

MONDAY


Aligned beamline until the beamstop. Macro for recovering mirror positions worked well. Minimal fine
tuning required.
Changed energy to 8.4 keV to align spectrometes on Ni kalpha emission.
Characterized focal spot of the x-rays at
Entry   Issue, posted by Jan Gruenert on 23 Sep 2023, 07:31 
7:23: RC info:
an electrical power glitch interrupted beam operation, machine down. DESY has power back
and accelerator is recovering beam towards TLD, but no beam possible into TLDs, apparently power issues in Schenefeld.
Entry   Shift end, posted by Adam Round on 23 Sep 2023, 07:04 
Staff:JK, RDW, AR

X-ray delivery


7 keV 202 pulses 1.7mJ stabel across train and throughout the shift


Optical laser delivery
Entry   Status, posted by Jan Gruenert on 22 Sep 2023, 17:46 
SASE3 gas supply alarm

SCS called the PRC at 17h04 due to a loud audible alarm in XHEXP1 and contacted also TS-OCD.
It turned out to be the gas supply system for SASE3, an electrical cabinet on the balcony level in the SE-corner of XHEXP1.

Actions taken by PRC:
Entry   Shift summary, posted by Raphael de Wijn on 22 Sep 2023, 07:27 
X-ray delivery


7 keV, 202 pulses, 564 kHz, ~1.3 mJ, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Benjamin van Kuiken on 22 Sep 2023, 06:51 
Achievemnets


Characterized the X-ray and laser danage on the STO2LNO2


Problems


Cound not find fine timeing from XAS measurements performed on the sample

MCP sees 266 nm PP laser
SiN mesaurement
Entry   SA1 status, posted by Jan Gruenert on 22 Sep 2023, 00:56 
As agreed beforehand, PRC and SPB/SFX re-assessed the SA1 EPS power limit based on actual performance, required number of pulses and rep rate, at the
agreed SPB photon energy of 7 keV.
The actual lasing performance is on average 1.3 mJ / pulse at the current 7 keV.
Entry   SA1 status, posted by Jan Gruenert on 21 Sep 2023, 09:24 
Info by R.Kammering (mail 20.9.23 18h25), related to the SA1 intensity drops during large wavelength scans:

"We found some problematic part in the code of our wavelength control server.
After lengthy debugging session we (Lars F, Olaf H. and me) did find a workaround which seems to have fixed the problem.
ELOG V3.1.4-7c3fd00