Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 2 of 24  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Groupdown Subject Text Attachments
  466   25 Jan 2024, 14:57 Antje TrappXROend of shift summaryIt was possible to align to HED in parasitic
mode to seeding tests

mirror horizontal position (coating
  
  467   26 Jan 2024, 15:24 Antje TrappXROend of shift summaryVertical motors of M3 now calibrated in
first iteration and gemetrical neutral calibrated
to 0 in motor settings!!!
  
  468   26 Nov 2022, 10:40 Wolfgang FreundXPDDiamond detector / DDM commissioningbeam: 30 keV / 30 uJ
reduce to single bunch for insertion
put FEL imager in
 DDM_inserted_Screenshot_from_2022-11-26_13-10-03.pngDD_2_pulses_IMGFEL_Screenshot_from_2022-11-26_13-32-47.png2022-11-26T17_20_00-01.pngDD_27keV_Screenshot_from_2022-11-26_18-12-30.png2022-11-26T17_11_18-00_orbit_kick_for_run_40.png 
  1   16 Jan 2023, 11:33 Theophilos MaltezopoulosXPDStatusI started the upstream XGMs in XTD2, XTD1,
and XTD10.
  
  5   21 Jan 2023, 16:38 Jan GruenertXPDAnalyze and quantify the mispositioning of the new 4mm-aperture behind the undulatorGoal: Analyze and quantify the
mispositioning of the new 4mm-aperture behind
the undulator
 JG_2023-01-21_16-06-48.pngJG_IMGFEL_2023-01-21_16-21-01.pngIMGFEL_no_cross_2023-01-21_16-27-22.pngIMGFEL_with_cross_2023-01-21_16-30-16.png 
  20   08 Feb 2023, 11:14 Andreas KochXPDSA3 statusBunch number control - SA3 FEL
imager

As announced today in the XO meeting
 Bunch_number_control_SA3_FEL_imager.PNG 
  100   23 Mar 2023, 13:07 Naresh KujalaXPDStatusUpdate for elog 99:

Now Gotthard timing is changed
to new setting for 0.5 MHz.
 Screenshot_from_2023-03-23_13-04-58.pngScreenshot_from_2023-03-23_13-17-05.png 
  133   10 Apr 2023, 02:16 Jan GruenertXPDSPB_XTD9_IMGPII45 lost steps - REPAIREDREPAIRED / FIXED

Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost
  
  132   10 Apr 2023, 02:25 Jan GruenertXPDIssueREPAIRED / FIXED

Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost
  
  135   13 Apr 2023, 15:29 Andreas KochXPDIssueTrigger issue
with SXP_XTD10_IMGES - Exit Slit imager

The external trigger of the Navitar
  
  136   13 Apr 2023, 15:57 Jan GruenertXPDShift endEnd of Diamond Sensor Study

We leave the SASE2 beamline in
the following safe state:
  
  227   06 Jun 2023, 08:28 Naresh KujalaXPDStatusSA2 photon beamline

- SRA position were 7 mm x
7 mm, MID reported they see the hallow of
 SRA-Before_changing_1.PNGSRA-after_changing.PNG 
  262   19 Jun 2023, 09:37 Jan GruenertXPDShift startRampdown day activities

The main focus is as usual on checking
all tunnel components and to identify any
  
  263   21 Jun 2023, 15:12 Andreas KochXPDNew screens installed in FEL imager SA3YAG screen
The damaged screen "YAG2"
with Al coating had marks and had been exchanged.
  
  387   13 Oct 2023, 10:19 Theophilos MaltezopoulosXPDIssueAn XGM has two single-shot detectors, XGMD
and HAMP.

The XTD2 XGMD amplifiers are damaged,
  
  443   10 Nov 2023, 17:39 Jan GruenertXPDSA2 statusEnd of 30 keV study

The machine finished their attemps
for 30 keV tuning while using NEPAL injector
 JG_2023-11-10_um_17.55.00.png 
  464   28 Nov 2023, 19:36 Jan GruenertXPDStatusRamp down activities completed
by XPD. References:


SASE1

https://in.xfel.eu/elog/SASE1+technical+commissioning/2204
https://in.xfel.eu/elog/SASE1+technical+commissioning/2205
https://in.xfel.eu/elog/SASE1+technical+commissioning/2206


SASE2

https://in.xfel.eu/elog/SASE2+technical+commissioning/1206
...until...
https://in.xfel.eu/elog/SASE2+technical+commissioning/1209


SASE3

https://in.xfel.eu/elog/SASE3+technical+commissioning/2220
https://in.xfel.eu/elog/SASE3+technical+commissioning/2221




The
  
  35   16 Feb 2023, 14:04 Frederik Wolff-FabrisXOSA2 statusData for the Horizontal jitter at the HED
Pop-In was observed during beam delivery
on cw05 (03-05.Feb) and cw07 (14-16.Feb)
 HED_PopinX_cw05_23.pngHED_PopinX_cw07_23.png 
  202   12 May 2023, 16:12 Frederik Wolff-FabrisXOSA3 statusThe SA3 EPS power limit at the Big brother
was disabled to allow photon energy scans
in SQS (due to Kr resonance at XGM, invalid
  
  237   09 Jun 2023, 15:41 Raśl Villanueva-GuerreroVACVacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Preliminary reportDear all,

After the incidences reported yesterday
and the diagnostic remotely done (where we
  
ELOG V3.1.4-7c3fd00