349
|
20 Sep 2023, 19:42 |
Peter Zalden | FXE | Issue | Connerning the phase shifter adjustment
after undulator gap scan via karabo:
At 19:30 FXE tested the scan change |
|
356
|
23 Sep 2023, 07:31 |
Jan Gruenert | PRC | Issue | 7:23: RC info:
an electrical power glitch interrupted
beam operation, machine down. DESY has power |
|
358
|
23 Sep 2023, 08:14 |
Peter Zalden | FXE | Issue | FXE interlock in fault state. See photo
attached with original error message from
6:53h. It cannot be reset by acknowledging. |
|
359
|
23 Sep 2023, 08:50 |
Jan Gruenert | PRC | Issue | Updates on power glitch
8h50 No feedback from TS-OCD (still
not arrived at SASE3 / SCS ?). Phone is busy. |
|
361
|
23 Sep 2023, 15:35 |
Jan Gruenert | PRC | Issue | SASE2 :
The unavailability of karabo and possibly
missing cooling water is a problem for |
|
376
|
30 Sep 2023, 10:11 |
Romain Letrun | SPB | Issue | On multiple occasions this morning, the
number of bunches was reduced to 1 without
actions from our side. |
|
387
|
13 Oct 2023, 10:19 |
Theophilos Maltezopoulos | XPD | Issue | An XGM has two single-shot detectors, XGMD
and HAMP.
The XTD2 XGMD amplifiers are damaged, |
|
409
|
24 Oct 2023, 19:26 |
Thomas Preston | HED | Issue | Vacuum issue at HED
At 18:26 the vacuum failed in the
HED CRL3 chamber in the OPTs hutch. The vacuum |
|
410
|
25 Oct 2023, 04:48 |
Chan Kim | SPB | Issue | SA3 background is very strong and it affects
our NKB (nano KB, Ru coating) focus.
|
|
421
|
27 Oct 2023, 03:19 |
Chan Kim | SPB | Issue | We observed auto changes of the number
of X-ray pulses last night and tonight.
It is related to 500 um thick Si |
|
425
|
30 Oct 2023, 14:36 |
Jan Gruenert | PRC | Issue | The EPD reading system at the turnstiles
of XTD10 entrance were not working this morning.
A necessary ZZ access to XTD10 |
|
435
|
04 Nov 2023, 08:15 |
Jan Gruenert | PRC | Issue | Beam down for SASE1/3: SASE1 XTD2
vacuum issue
Vacuum interlock of the SA1 / XTD2 |
|
436
|
04 Nov 2023, 13:49 |
Jan Gruenert | PRC | Issue | (Temporary) solution for the vacuum
incident in SA1
This morning at 7h18 the vacuum |
|
438
|
05 Nov 2023, 12:18 |
Jan Gruenert | PRC | Issue | Accelerator down 9h23 - 12h
RC / BKR informs (10am), that due
to a quadrupole power supply failure in A21 |
|
439
|
05 Nov 2023, 12:47 |
Jan Gruenert | PRC | Issue | North branch down : another e-beam
magnets problem
RC informs 12h45 that the linac |
|
453
|
22 Nov 2023, 10:19 |
Johannes Moeller | MID | Issue | The Si 0.5mm absorber of XTD1 attenuator
seems to be damaged. First screenshot is
with that one inserted. In the second screenshot, |
|
469
|
18 Apr 2024, 23:19 |
Jan Gruenert | PRC | Issue | 22h55:
HED informs that they have issues
with the HED pulse picker in XTD6. It affects |
|
108
|
25 Mar 2023, 21:01 |
Lisa Randolph | HED | HED summary 25.3. | This day we had lots of issues.
Nightshift noticed that
the mirror 2 feedback was not running anymore |
|
106
|
24 Mar 2023, 21:46 |
Lisa Randolph | HED | HED shift summary 23.-24.3. | 8.2 keV, 1-2 bunches, 600uJ
23.3.
did timing runs and optimized |
|
98
|
22 Mar 2023, 23:57 |
Lisa Randolph | HED | HED shift summary 22.03. | During the night we worked on the temporal
overlap between Relax laser and XFEL.
In the morning we noticed that |
|