Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 13 of 24  Not logged in ELOG logo
Entry   Morning shift summary, posted by Giuseppe Mercurio, Teguh Asmara on 07 Jun 2023, 15:04 
achievements:


FEL beam realignment because pointing was off since we had 0 pulses during the night
coarse timing was found
knife
edge scans of FEL to achieve twice the PPL beam size


problems:
Entry   late shift summary, posted by Loic Le Guyader on 06 Jun 2023, 23:11 
achievements


aligned the beam through up to the XOX imager
prepared FFT for reflectivity measurement
tested new DSSC gain files
for Tb M5 edge


problems
Entry   Status, posted by Naresh Kujala on 06 Jun 2023, 08:28 SRA-Before_changing_1.PNGSRA-after_changing.PNG
SA2 photon beamline

- SRA position were 7 mm x 7 mm, MID reported they see the hallow of beam shadow at MID Popin

- I have closed the SRA to 3.5 mm x 3.5 mm
Entry   Status, posted by Naresh Kujala on 05 Jun 2023, 08:28 SA2_Main-Status_05-06-23.PNG
- SA2 photon beamline

Today morning found the CRL1: 5 and 6 arm and Pop-in 45-I are still IN. I have retracted them.
Entry   Issue, posted by Tommaso Mazza on 05 Jun 2023, 06:45 1685940280680.jpg
around 6:15, the lights as the one shown in the attachment turned on by themselves in the control hutch. after some minutes, they switched off.

from the exp hutch camera, we realized that this happened in there as well, which impacted negatively on the running measurement. The pnCCD is
sensitive to ambient light and we have to keep the hutch dark while measuring.
Entry   Shift summary, posted by Romain Letrun on 04 Jun 2023, 21:17 
X-ray delivery


12.2-12.45 keV, up to 339 pulses at 1.13 MHz, 0.8-1.2 mJ.
Couple of minutes beam interruption.


Optical
laser delivery
Entry   Shift summary, posted by Konopkova Zuzana on 04 Jun 2023, 14:53 
beam parameters: 20 keV, 300 uJ, 352 pulses


continuation of user programe.
Machine performance very good for trying the 20 keV the first time. Experiment also going well.
Entry   Shift summary, posted by Romain Letrun on 03 Jun 2023, 23:40 
X-ray delivery


10.65 keV, up to 339 pulses at 1.13 MHz, 1.6-1.8 mJ.
12.4 keV, up to 30 pulses at 1.13 MHz, 1.0-1.2 mJ.
Beam not
aligned to the crosshair at 12.4 keV, but we could work with it as it is to avoid further tuning.
Overall stable delivery.


Optical
Entry   Pulse energy has dropped to ~50% from this morning, posted by Thomas Preston on 03 Jun 2023, 13:42 
03 Jun 2023, 13:46

We called the BKR to ask what they can do about our pulse energy being 50% (~160uJ and slowly dropping) of what it was since we made our hutch
intervention (with 0 bunches). BKR were asked to organise a time slot with PRC and the other instruments to make an intervention to try to increase our
Entry   Shift summary, posted by Thomas Preston on 03 Jun 2023, 09:42 
X-ray parameters: 20 keV,  352 pulses, ca 300 uJ


running user samples.


experiment going overall well.

X-ray performance:
Entry   Shift summary, posted by Romain Letrun on 02 Jun 2023, 23:34 
X-ray delivery


10.65 keV, 128 pulses at 1.13 MHz, 1.6-1.7 mJ.
Overall stable delivery.


Optical laser delivery


800 nm, 50 fs, 226 pulses at 1.13 MHz.


Achievements/Observations
Entry   pointing stability, posted by Tommaso Mazza on 02 Jun 2023, 06:17 Screenshot_from_2023-06-02_03-14-16.png
we lost spatial overlap on several instances.

It seems that this happens when SASE2 changes number of pulses.

when we have SASE2 changing number of pulses, spatial overlap is lost and this goes with a change in the position read by the xgm in the order
Entry   Shift summary, posted by Romain Letrun on 01 Jun 2023, 23:27 
X-ray delivery


10.65 keV, 128 pulses at 1.13 MHz and 16 pusles at 141 kHz.
Overall stable delivery.


Optical laser
delivery
Entry   Shift summary, posted by Konopkova Zuzana on 01 Jun 2023, 12:10 
X-ray parameters: 20 keV (20080 eV from HIREX), 352 pulses, cca 250 uJ


changed setup to diamond anvil cell experiments with laser heating
installation of AGIPD detector
running user
samples, mostly carbon materials to constrain the phase diagram of carbon at high pressures and temperatures.


experiment going overall
Entry   Shift summary, posted by Romain Letrun on 31 May 2023, 23:15 
X-ray delivery


10.65 keV, 128 pulses at 1.13 MHz and 16 pusles at 141 kHz.
Slope reduced at the start of the shift. Approximately 20% slope
after that with the patterns used for data collection today.


Optical laser delivery
Entry   Issue, posted by Naresh Kujala on 31 May 2023, 17:35 bunchpatternServer-scene_MDL-macros.PNG
 

HED reported that they are unable to go 352 pulses and while changing/dailing the no. of pulses in the bunch Pattern it is showing the EPS is
limited to 300 pulses. It seems on the SA2_MAIN scene the link for bunch Pattern apparently using the macros scene, which is preventing it from going
Entry   Shift summary, posted by Romain Letrun on 30 May 2023, 23:02 
X-ray delivery


10.7 keV, up to 339 pulses at 1.1 MHz.
Large slope through the train, up to 70% with 339 bunches. BKR was not able to find
the cause so far, we agreed to pursue this further tomorrow.


Achievements/Observations
Entry   Shift summary, posted by Fernando Ardana on 28 May 2023, 23:15 
User proposal 3273:


X-ray delivary

We use several deliveraly modes:

Continous single pulse
Continous 30 pulses
POD:
1 pulses / 30 pulses


All works fine, FXE is sastificed with X-ray delivery


DA:

Few
Entry   Shift summary all week, posted by Martin Teichmann on 28 May 2023, 22:57 
we were trying to make THz and cross correlate this to the pump laser.

We managed to see THz and an auto-correlation with the pump laser therein. Unfortunately we did not see any THz generation using the FEL.

Problems:
Entry   Shift summary, posted by Tokushi Sato on 25 May 2023, 06:35 
X-ray delivery


10.7 keV, 1.2 mJ, 1-200 pulses, stable delivery


Optical laser delivery


None


Achievements/Observations
ELOG V3.1.4-7c3fd00