Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 12 of 24  Not logged in ELOG logo
Entry   Shift summary, posted by Andreas Scherz on 07 Sep 2023, 23:46 
Shift summary 07.09.2023

Achievements:
1. found t0   on LSCO x=0.15 at pre-peak O K edge
Entry   Shift summary, posted by Erik Brambrink on 08 Sep 2023, 06:22 

Improved the alignment procedure:

Using the pin to make sure of the spatial overlap
SAXS signal is used to make sure
the pin is well centered on the X-ray beam path
YAG is only used in combination with ILM to fix with ~5 um precision the height of the beam
(moving CRLs on laser focus) and the temporal overlap.


Entry   Shift summary, posted by Erik Brambrink on 09 Sep 2023, 07:00 

Data taken from 11 to cryo failure
Beam conditions stable
Timing scan for different energy
Operation stopped
after cryo failure
Cryo jet was heated up then
Improvements of optical diagnostics (far field monitor)
Entry   Shift summary, posted by Tokushi Sato on 13 Sep 2023, 02:18 
X-ray delivery


0.5 mj, improved to 1.1 mj xray energy in the evening


Optical laser delivery


50 fs, 860 nm as fundamental wavelength, 188 kHz
ns for illumination,


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 14 Sep 2023, 00:05 
X-ray delivery


1.1 mj, 564 kHz, 93 pulses, stable delivery


Optical laser delivery


50 fs, 860 nm as fundamental wavelength, 188 kHz
ns for illumination,


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 14 Sep 2023, 23:03 
X-ray delivery


1.1 mj, 564 kHz, 93 pulses, stable delivery


Optical laser delivery


50 fs, 860 nm as fundamental wavelength, 188 kHz
ns for illumination,


Achievements/Observations
Entry   Shift summary, posted by Benjamin van Kuiken on 22 Sep 2023, 06:51 
Achievemnets


Characterized the X-ray and laser danage on the STO2LNO2


Problems


Cound not find fine timeing from XAS measurements performed on the sample

MCP sees 266 nm PP laser
SiN mesaurement
Entry   Shift summary, posted by Raphael de Wijn on 22 Sep 2023, 07:27 
X-ray delivery


7 keV, 202 pulses, 564 kHz, ~1.3 mJ, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Oliver Humphries on 23 Sep 2023, 07:59 
Shift summary from Monday 18th 7am until Saturday 7am

MONDAY


Aligned beamline until the beamstop. Macro for recovering mirror positions worked well. Minimal fine
tuning required.
Changed energy to 8.4 keV to align spectrometes on Ni kalpha emission.
Characterized focal spot of the x-rays at
Entry   Shift summary, posted by Motoaki Nakatsutsumi on 23 Sep 2023, 23:31 
During the morning shift (7am - 3pm), we couldn't take any meaningful data due to the issue of power glitch which caused the beam permission error
(AIBS) and down of SASE2 Karabo / Online-GPFS due to the lack of cooling in the rack room.

During the late shift (3 pm - 11 pm), after these issues were solved thanks to PRC/DOC/ITDM/EEE at 5 pm..., we could get back in operation relatively
Entry   Shift summary, posted by Raphael de Wijn on 24 Sep 2023, 07:28 
X-ray delivery


7 keV 202 pulses 1.6mJ stabel across train and throughout the shift
Beam down at 7am again, power glitch same as yesterday


Achievements/Observations


faster changover and alignment
YAG on nozzle worked
collected data the droplets in oil sample delivery method -
Entry   Shift summary, posted by Peter Zalden on 24 Sep 2023, 09:16 
Summary for sept., 23rd

6:55 SPB just handed the beam over to FXE when the power glitch killed the interlocks and brought down ACC

11:30 After a lot of communication with PRC, Wolfgang Clement and DOC, the beam is back in SA1. We request change to 5.5 keV
Entry   Shift summary, posted by Peter Zalden on 24 Sep 2023, 09:24 
7:00 Power glitch during SPB operation - they were supposed to hand the beam back at 7:30h


Power glitch brought down FXE interlock system with beam stop monitor alarm that could not be reset
SA1 PPL running fine,
seems unaffected


9:10 Beam back in SA1, but still at 7 keV and cannot be changed by BKR to the req'd 5.8 keV, 94 kHz.
Entry   Shift summary, posted by Romain Letrun on 27 Sep 2023, 07:24 
Shift summary for 26.9.2023

X-ray delivery


6.3 keV, ~4 mJ, 1-352 pulses at 1.13 MHz
Great performance and stable delivery with few minor interruptions


Optical
Entry   Shift summary, posted by Romain Letrun on 28 Sep 2023, 07:20 
Shift summary for 27.9.2023

X-ray delivery


6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz


Optical laser delivery
Entry   Shift summary, posted by Johannes Moeller on 29 Sep 2023, 00:35 

1, 60 and 350 pulses at 8.7keV, HXRSS

*focus characterization CRL2 lens 3,5,6
*Si 20nm XPCS with 20 and 50 pulses to evaluate the contrast
Entry   Shift summary, posted by Romain Letrun on 29 Sep 2023, 08:30 
Shift sumary for 29.9.2023

 

X-ray delivery
Entry   Shift summary, posted by Laurent Mercadier on 29 Sep 2023, 22:59 
# Late shift summary 29.09.2023

Laurent, Phuong
## Achievements
Entry   Shift summary, posted by Tokushi Sato on 29 Sep 2023, 23:13 
X-ray delivery


6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz


Optical laser delivery


PP laser, 1030 nm, 226 pulses at 1.1 MHz, stable delivery
ns laser for rayleigh scattering, stabe delivery


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 30 Sep 2023, 23:08 
X-ray delivery


6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz


Optical laser delivery


PP laser, 1030 nm, 352 pulses at 1.1 MHz, stable delivery
ns laser for rayleigh scattering, stabe delivery


Achievements/Observations
ELOG V3.1.4-7c3fd00