Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 1 of 24  Not logged in ELOG logo
Entry   summary of 23.09, posted by Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, Teguh on 24 Sep 2023, 07:49 
Around 6:55 there was a power glitch. Power in the experimental hutch and rack room went down in SASE3, error message in Xray interlock system and no
power for PP laser.

During morning TS turned the power on and interlock issues were solved by DESY. SCS could restart large part of SCS systems, however got help
Entry   summary late shift day 1, posted by Laurent Mercadier, Martin Teichmann on 18 Apr 2023, 23:01 
Achievements


knife edge scans of FEL beam, 30 um x 30 um beam size
aligned beam stop in front of camera
triggering pattern tested
and works, still need to test with laser and XGM


Problems
Entry   shift summary day 2 UP3463, posted by Laurent Mercadier, Martin Teichmann on 19 Apr 2023, 23:20 
Achievements


found larger beamstop
found center of pinhole and bender settings for beam size
checked jitter of beam on grating,
looks like jittering is large, to be further investigated offline
checked that patterns are working for the night, to be continued by night
Entry   shift summary March 30th, posted by Jörg Hallmann on 31 Mar 2023, 01:51 
- seeding at ~800 uJ

- repaired the laser interlock of A.08

- EPIX back in operation
Entry   shift summary March 29th, posted by Jörg Hallmann on 30 Mar 2023, 02:37 
achievments: alignment of the SDL (both branches)

measuring of samples & calibrants

 
Entry   shift summary EulerMDL calibration, posted by Antje Trapp on 16 Apr 2023, 23:06 11x
First four pictures: beam line status at beginning of shift - Beam aligned to MID

Idea is to check M2 parasitic motions again on M3 popin. therefore bringing M2 close to 0 with all vertical motors and Tx as much as possible
without using beam on the popin.
Entry   shift summary, posted by Jan-Etienne Pudell on 21 Feb 2023, 23:07 
- Tunnel + experimental hutch alignment (Mirrors, CRL1 and CRL2)

- Aligned main devices: Optics Peter, x-ray eye, EPIX and Zyla and pin holes.

- Tried some alignment of the NFL (1D) lenses with pin hole and not pre focussed beam. We found a lot of scattering from pinholes which dominates
Entry   shift summary, posted by Jan-Etienne Pudell on 23 Feb 2023, 01:51 
After realignement of M1 and M2 we could solve the problem of the elogated beamprofile. Different lens setting were prealignd for the use in combination
with the NFL.

We took data for several 1D diamond lenses together with a Vycor sample to extract the beamsize from the specles.
Entry   shift summary, posted by Jan-Etienne Pudell on 24 Feb 2023, 00:55 
We tested pulse on demand scans with scantool and confirmed that there is only one shot per scan point. This was used to print the footprint in
a LIf crystal.

We took caustic scans for 1D diamond lenses using a wire and using specles to extract the beamsize.
Entry   shift summary, posted by Johannes Moeller on 15 Mar 2023, 01:50 

HXRSS delivery, 600 - 700 uJ, 1 bunch, 8.991 keV. Pedestal visibly in HIREX, not checked with MID spectrometer yet.
beamline aligned
and beam brought to popin imager
struggle with jet pumping, to be continued
beam brought into experimental hutch, first rough alignment
of reference samples and cameras
Epix flight path leaked and window re-glued
Entry   shift summary, posted by Johannes Moeller on 18 Mar 2023, 01:45 

stable HXRSS delivery at 8.99 keV, 1 bunch. XGM intensity during the day decreased from 750 uJ to 600 uJ.
Vacuum in sample chamber
stabilized with cold trap and full beam path opened to AGIPD and endstation
Again problems with smaract stages in DES, but imager in a good
position to continue.
First scattering data recored from water jet. Unknown, bimodal intensity distribution
Focus characterization
Entry   shift summary, posted by Johannes Moeller on 19 Mar 2023, 02:01 Screenshot_from_2023-03-19_02-11-16.png

upper and lower branch of SDL aligned

beamsizes and angular mismatch characterized


vacuum leak of flight
path fixed
side view microscope re-aligned
problems with replaced MPC diamond detector. issue with in-vacuum cabeling suspected
misconfigured
timing of AGIPD fixed
splitting ratio of SDL detuned while HXRSS intensity decreased significantly. Possibly correlated.


With
Entry   shift summary, posted by Ulrike Boesenberg on 24 Apr 2023, 02:45 



Beam came back quickly after cryo-incident with ok seeding performance (not very stable).
Finish 3381-Pudell beamtime with
SRO/STO samples at time delays and laser fluences.
Decided not to scan the HXRSS energy but stay at current position
Mount samples
Entry   shift summary, posted by Giuseppe Mercurio on 07 May 2023, 06:52 
achievements:


measured delay scans on 16 nm samples at different magnetic fields (4 runs) before the problem below appeared


problems:


scroll pump of the FFT degraded, rough vacuum got worse, this led to pump in error state and interlock valves. The scroll pump was replaced,
Entry   shift summary, posted by Giuseppe Mercurio, Teguh Asmara on 02 Aug 2023, 06:44 
achievements:


beam transport with the second half of undulators closed
measured pulse energy in SCS hutch and verified that the transmission
of the beamline with hr grating is as previously reported
knife edge scans along vertical direction to find focus (<=11 um) and horizontal
Entry   shift summary, posted by Loic Le Guyader on 13 Nov 2023, 07:16 
# Shift Summary

Achievements
 - Measured elastic line with 3000 l/mm and 1000 l/mm grating on NiO sample
Entry   scanning for HED beam, posted by Antje Trapp on 24 Jan 2024, 14:00 scanning-vertical-horizontal_2024-01-24_13-59-55.pngsdlbm_2024-01-24_14-12-12.pngScreenshot_from_2024-01-24_15-28-26.pngmirror-motors__2024-01-24_15-32-14.png
We found reflection of M3 on M2 popin, but could not locate the beam on HED PBLM nor HED_XTD6_SDLBM-1

scanning both horizontally and vertically around previously saved positions on M3 popin.

managed to get beam through to sdlbm-1. No beam found downstream of that.
Entry   pointing stability, posted by Tommaso Mazza on 02 Jun 2023, 06:17 Screenshot_from_2023-06-02_03-14-16.png
we lost spatial overlap on several instances.

It seems that this happens when SASE2 changes number of pulses.

when we have SASE2 changing number of pulses, spatial overlap is lost and this goes with a change in the position read by the xgm in the order
Entry   other, posted by Chan Kim on 25 Oct 2023, 06:02 Screenshot_from_2023-10-25_05-27-43.pngScreenshot_from_2023-10-25_05-27-13.png
Issue solved (elog:410) after changing NKB mirror coating to B4C.

 
Entry   other, posted by Chan Kim on 24 Nov 2023, 20:48 Screenshot_from_2023-11-24_20-42-17.pngScreenshot_from_2023-11-24_20-42-08.png
Beam drift in the horizontal direction (XTD9_XGM x position) started at around 10am and continuously drifted until 16:00.

After then, beam has been drifted back to original position within 4 hours.
ELOG V3.1.4-7c3fd00