Entry   400 Eintrag: Pfand und Kuchen, posted by Orkidia Bilani on 19 Sep 2023, 13:00 
 
Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 21 Sep 2023, 08:40 QR51494_51495.jpg
Transport of two granite blocks (QR 51494 and QR 514945) of SQS from XHEXP1 to XHE1.

 

Coworkers: S. Menzel, M. Peter, O. Bilani
Entry   SQS: Transport to XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:45 
Brought back from XHE1 to the experiment hall following parts for SQS:

QR48494 Rack

QR48493 Rack

QR47932 Kabel

QR47938 Kabel



Coworkers: S. Menzel, O. Bilani
Entry   SQS Support in XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:47 
SQS doesn't have many space left in their assembly area. Talked/dealed with the SQS colleagues, and managed to free spaces :-).

The parts/components will be transported to XHE1 and to Ütersen.

Sascha will do the transport to XHE1 on his shift over the weekend. The transport to Ütersen will be done next week.
Entry   Cabinets, posted by Orkidia Bilani on 27 Sep 2023, 13:36 
Kai-Erik Ballak gave for XHCrew consumables storage 5 blue cabinets :-).

 
Entry   SQS: Transport, posted by Orkidia Bilani on 29 Sep 2023, 12:34 
Transport of SQS components:

QR 44455, QR 44458 and QR 49874 from XHEXP1 to XHE1.

QR 45466 from XHE1 back to XHEXP1.
Entry   MID: LN2 Dewars, posted by Orkidia Bilani on 30 Sep 2023, 11:56 
M. Petrich called in the morning saying that MID needed two more dewars than originally planned.

A. Zouzoulya did write and called that he didn't have access to the LKW Schleuse. So I came as well to support on that and to show him the
dewars in the cage, since there were other filled (ohne Schlauch).
Entry   Si Oil leakage, posted by Orkidia Bilani on 10 Oct 2023, 18:21 
D. Lomidze and M. Turcato informed that they found the position/place where the silicon oil leakage was coming from. They are on he way to fix the problem.
Entry   SPB/SFX , posted by Orkidia Bilani on 10 Oct 2023, 18:25 
Talked with P. Vagovic to remove from the experiment hall his setup and a table.

He will write a ticket this week, so that we can tranport it to XHE1 or in Ütersen.

 
Entry   SPB/SFX Support: Craning, posted by Orkidia Bilani on 11 Oct 2023, 20:51 
SPB/SFX got a new chiller, which was then craned into the rack room. 

The borrowed chiller (the one they borrowed from SCS) was craned out of the rack room.

Coworkers: O.Bilani, S.Menzel, M. Peter, M. Sikorski, T. Dietze
Entry   LKW Schleuse , posted by Orkidia Bilani on 13 Oct 2023, 19:26 IMG_20231013_191509_MP.jpgIMG_20231013_192007_MP.jpg
In the truck bay, the rain water flows underneath  the Rolltor, and it goes directly under the Elektroschrank, where there are cables going
down in the Kabelkanal. Put a tissue and a sponge als Dämmung.

On Monday Süleyman will be contacted. 
Entry   SASE3, posted by Orkidia Bilani on 13 Oct 2023, 21:04 IMG_20231013_205839_MP.jpgIMG_20231013_205912_MP.jpg
In SASE3 one of pipelines of the WeissKlima Technik, are very hot in certain positions. Checked the other pipes of different WeissKlimaTechnik,
they do not show any temperature increase (would say similar to the hall temperature).

TS will be informed!
Entry   Info, posted by Orkidia Bilani on 14 Oct 2023, 18:01 IMG_20231014_143737_MP.jpg
-> Dicsarded empty boxes from the hall.

-> Sorted out a box with screws and washers which was given from instruments to the HallCrew.
Entry   SCS Support: Craning, posted by Orkidia Bilani on 16 Oct 2023, 16:50 IMG_20231016_141659_MP.jpg
Craned for SCS a component which belonged to Desy users/colleagues.

This will then be transported from SCS back to Desy.

Coworkers: O.Bilani, M.Peter, J.Shima
Entry   SCS Support , posted by Orkidia Bilani on 01 Nov 2023, 09:58 IMG_20231101_084556_MP.jpg
Supported SCS with craning of a shikane.

Co-workers: O.Bilani, JT.Delitz

 
Entry   SQS Support , posted by Orkidia Bilani on 01 Nov 2023, 11:07 IMG_20231030_131455_MP.jpgIMG_20231030_131503_MP.jpg
Discussed with T.Mazza on Monday, 30.10.2023, about storing temporarily in XHE1 the wooden boxes of an equipment they recevied recently. 

They should be stored until the equipment is tested and working, so that if something goes wrong, it can be shipped to the manufacturer with
the original Verpackung 
Entry   SPB/SFX Support, posted by Orkidia Bilani on 10 Nov 2023, 11:34 IMG_20231110_104226_MP.jpgIMG_20231110_110437_MP.jpg
With P. Vagovic, SPB/SFX, sorted out components and trash from the hall.

Brought the table and the small box (Pic.1) to their Lab 303.

Discarded the things on the trolley and the black transport box was placed near SEC lab, 400 area (Pic.2).
Entry   SPB/SFX Support , posted by Orkidia Bilani on 10 Nov 2023, 14:38 IMG_20231110_143034_MP.jpgIMG_20231110_143058_MP.jpg
Together with P. Vagovic, made ready to transport to XHE1 an optical table (QR 49889)  and a detector assembly (QR 49890), and  supported on
their XIM entries.

The transport will take place on Monday, 13.11.2023.
Entry   Transport: Vakuum, posted by Orkidia Bilani on 14 Nov 2023, 17:51 IMG_20231114_174837_MP.jpg
Two pipe transport trolleys  (QR 44462) were transported from external storage Ütersen to LKW Schleuse from TS colleagues. The third one
will be transported tomorrow.

Trolleys brought to the experiment hall and placed in the Vacuum assembly area. 
Entry   SXP Support, posted by Orkidia Bilani on 17 Nov 2023, 20:48 
SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-)