Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 9 of 30  Not logged in ELOG logo
ID Date Authordown Location Severity Subject
  179   26 Apr 2017, 19:21 Raśl Villanueva-GuerreroXTD9FeedbackXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESFUL

 Dear all,

Finally the tests were run with the expected results: Pressure thresholds for the 3 involved gauges were forced on the system and the interlock on the two gate valves that limit the whole gas section were automatically closed in every case. Also the release switch was tested and the valves were able to be normally operated again.

However the interlock definition also involves the closing of the so-called "shut-off" valve in the gas injection line at the XGM. Unfortunately its behaviour couldn´t be completely observed since the Karabo device is not fully implemented. On the other hand, J. Grünert reported that after the interlock was triggered the valve was shown as also "interlocked" (despite the actual status, open or closed was not clear). This situation may require a second test, combined for instance with the gas injection test to be run by WP74 in the upcoming date). 

In any case the final results were rather positive. (despite there still some permanent uncertainty about devices being reachable or not through Karabo, as it has been previously reported).

 

Thanks to everyone involved.

 

Raúl Villanueva on behalf of B. Rio, N. Jardon and V. Bondar.

 

 

  180   27 Apr 2017, 07:04 Raśl Villanueva-GuerreroXTD2ProblemXTD2 Differential Pumping completely OUT OF OPERATION!

 Dear all,

 

I just checked the Karabo Scene for both XTD9 and XTD9, finding out the not-so-nice situation where all the valves and pumps were respectively closed and stopped. What really worries me is again the fact that these situations are happening without aparent reason. I´m right now trying to start the system remotely but obviously one needs again to access the tunnel for that is the only reason to actually be sure that everything is up an running normally again.

 

 

  181   27 Apr 2017, 07:11 Raśl Villanueva-GuerreroXTD2ProblemXTD2 Differential Pumping completely OUT OF OPERATION!

Raúl Villanueva-Guerrero wrote:

 Dear all,

 

I just checked the Karabo Scene for both XTD9 and XTD9, finding out the not-so-nice situation where all the valves and pumps were respectively closed and stopped. What really worries me is again the fact that these situations are happening without aparent reason. I´m right now trying to start the system remotely but obviously one needs again to access the tunnel for that is the only reason to actually be sure that everything is up an running normally again.

 

 

 UPDATE:

XTD2

The Upstream sector is back into operation.

The Downstream one is still out of order since the turbopumps are whether in error or in an unknown/un-instantiated status.

 

 

XTD9

Upstream sector is back to full operation

Downstream sector: only one of the turbos is running. The other one P11280T cannot be reset

 

Right now that is the only thing I can do.

 

  200   03 May 2017, 11:15 Raśl Villanueva-GuerreroXTD9InformationCorrection to plans for Vacuum (e-log message n3. 199) in XTD9

 Dear all,

it seems that this morning was somehow a misunderstanding. The XTD9 Gas Section Interlock test was succesfully finished the last 26th of April (see e-log message nr. 179).

There´s no further activity planned for this system.

 

Regards.

 

r.

  204   03 May 2017, 14:38 Raśl Villanueva-GuerreroXTD9FeedbackGas Section Interlock on XTD9 - Shut off valve also operative

 Dear all,

during the test run today by our colleagues of WP74, the interlock condition inside the XGM module was met (small volume pressure burst up to 10-2 mbar range). Now we can see also the expected cut-off event of the gas injection (see attached pictured). It seems that the reason why there was any feedback from the respective shut-off valve was the solenoid actuator on the respective shut-off valve was set in manual mode.

This means that XTD9 Interlock for the whole gas section has been up and running as expected the whole time.

Best Regards.

Attachment 1: 45.png
45.png
  106   05 Apr 2017, 16:24 Nicola CoppolaXTD9Informationalio monocromator tests

test finshed.

both stages were moved.

voltage value and position read out from encoder opposite in directionality

some strange limitation on the postiion range seen.

both stages are now at around the 0 position with few mm error.

XD to ask alio/nanoomotion on the matter

XD will provide few lines of comment

  209   05 May 2017, 14:35 Nicola CoppolaGeneralInformationAE OCD Mai 5 -- Mai 8

AE on call service:

    Contact person:

        Nicola Coppola

    Phone:

        9 - 5627

 

  253   19 May 2017, 15:42 Nicola CoppolaGeneralInformationAE OCD Mai 19 -- Mai 22

AE on call service:

    Contact person:

        Nicola Coppola

    Phone:

        9 - 5627

  285   09 Jun 2017, 19:09 Nicola CoppolaGeneralInformationInformation AE OCD June 9 -- 12

 AE/PLC on call service:

     Contact Person:

              Nicola Coppolla

    Phone:

   9 - 8040

  331   13 Jul 2017, 18:15 Nicola CoppolaGeneralInformationInformation AE OCD July 13

AE on call service:

    Contact person:

        Nicola Coppola

    Phone

        9 - 8040

  336   14 Jul 2017, 18:46 Nicola CoppolaGeneralInformationInformation AE OCD July 14--17 (till Monday 8:00)

AE on call service:

    Contact person:

        Nicola Coppola

    Phone

        9 - 8040

  56   02 Mar 2017, 09:52 NEREA JARDONGeneralInformationPLC work

Dear all,

Right now the Motion PLC is up and running. We are still working in the Vacuum one, today by midday should be also working.

  57   02 Mar 2017, 11:55 NEREA JARDONGeneralInformationVacuum PLC

Dear all,

The Vacuum PLC is up and running and Karaboo guys have already started to work with it.

Thank you and regards

  61   07 Mar 2017, 10:21 NEREA JARDONXTD9InformationXTD9-DPS

Dear all,

Tomorrow morning, 08th of March at 09.30h. I will be in the tunnel doing interlock tests in the DPS-XTD9 with Raúl.

Therefore I will need the connection of the TCP_Client in the Vacuum loop (just to let know Karaboo people).

I will post again when the PLC is available for Karaboo.

Thank you!

  63   08 Mar 2017, 13:11 NEREA JARDONXTD9InformationInterlock tests DPS

The interlock test in XTD9-DPS has been done. The Vacuum PLC is again available for Karaboo.

  73   13 Mar 2017, 15:47 NEREA JARDONGeneralInformationVacuum and Motion down

Tomorrow, 14th of March, Vacuum and Motion loop will be down at least during morning due to technical reasons .

I will notify you when the works are finished.

  74   14 Mar 2017, 13:55 NEREA JARDONGeneralInformationVacuum and Motion down

Dear all,

Finally today the Vacuum and Motion will still running the hole day and I would have to stop them tomorrow morning. Before doing this operation, I will post an entry in the ELOG.

  76   15 Mar 2017, 11:31 NEREA JARDONGeneralInformationVacuum and Motion

Today Denis has to make some changes in the Vacuum and Motion hardware loop, therefore they would be down some time.

At least, we would try to keep the Vacuum loop up again for 3pm, therefore Valerii and Raul could use it with Karaboo.

  77   15 Mar 2017, 17:00 NEREA JARDONGeneralInformationVacuum and Motion

Vacumm and Motion are running again after the hardware changes.

  79   16 Mar 2017, 16:54 NEREA JARDONGeneralInformationFuses replacement

Dear all,

Tomorrow in the morning is needed to add some fuses in the PLCs crate, therefore Vacuum and Motion would be down for more or less one hour from 9am. I will notify you when the PLCs are available to work again.

Thank you,