37
|
03 Feb 2017, 08:48 |
Jan Grünert | XTD2 | Information | Update WP74 cabling status (w5) | Information posted on behalf of Torben
Falk (WP74 cabling)
W |
|
60
|
06 Mar 2017, 18:14 |
Andreas Koch | XTD2 | Information | Pop-In II-45 Karabo test |
Normal
0
|
|
62
|
07 Mar 2017, 11:09 |
Andreas Koch | XTD2 | Information | Karabo testing on Wednesday | As discussed with Wajid, I am availalbe
tomorrow Wednesday the whole day to continue
testing Karabo, motion loop. Wajid checked |
|
64
|
08 Mar 2017, 16:08 |
Andreas Koch | XTD2 | Problem | Karabo testing | End switch testing: the in-position end
switch stopped devices working, also stopped
gateway connection. Stroke of motor is not |
|
65
|
08 Mar 2017, 16:18 |
Andreas Koch | XTD2 | Information | Karabo testing | Here the link to the detailed list of issues:
https://docs.xfel.eu/share/page/site/xfelwp74/document-details?nodeRef=workspace://SpacesStore/1733b825-e62e-47af-abba-fdef1ff9485d |
|
71
|
10 Mar 2017, 14:56 |
Lewis Batchelor | XTD2 | Information | CRL | The XTD2 CRL is now aligned and cabled.
Motor cabling is complete and ready
for local testing. Encoder and PT100 cabling |
|
75
|
15 Mar 2017, 08:13 |
Andreas Koch | XTD2 | Information | XTD2 Imagers | XTD2, IMAG.2694.T9, Pop-In II-45: Acceptance
test of motor control under Karabo, done.
Camera device needs further explanations |
|
85
|
22 Mar 2017, 16:39 |
Andreas Koch | XTD2 | Information | Pop-In II-45 Karabo test | Trigger signal now available at imager. First
Karabo tests of camera device with trigger
successful. Detailed
|
|
108
|
06 Apr 2017, 09:16 |
Andreas Koch | XTD2 | Information | Imager |
|
|
110
|
06 Apr 2017, 13:36 |
Andreas Koch | XTD2 | Information | motion loop not working !? | Has anyone an idea why the motion loop
is not working? Thanks Andreas |
|
111
|
06 Apr 2017, 14:32 |
Andreas Koch | XTD2 | Information | motion loop not working !? |
|
|
112
|
06 Apr 2017, 14:45 |
Andreas Koch | XTD2 | Information | motion loop not working !? |
|
|
120
|
07 Apr 2017, 19:13 |
wajid ehsan | XTD2 | Information | Acceptance test IMAGERS (FRIDAY 07-04-2017) |
SA1_XTD2_IMGPII45:
1)
MOTOR/SCREEN(DONE)
2) |
|
133
|
11 Apr 2017, 15:24 |
Jan Grünert | XTD2 | Problem | Big issue with XGM vacuum in both XTD2 and XTD9 ! |
Both XGMs were and are on manual control
(but the remote cables into the turbo pump
controllers remained plugged in as usual) |
|
135
|
11 Apr 2017, 17:44 |
Raúl Villanueva-Guerrero | XTD2 | Feedback | XTD2 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESSFUL | The interlock definition for complete
isolation of the whole section based on high
pressure signal has been successfully tested. |
|
136
|
11 Apr 2017, 18:29 |
Raúl Villanueva-Guerrero | XTD2 | Feedback | Fast Valve Test - SUCCESFUL | The Fast Valve test has been positively
tested.
It has been consider that the signal |
|
137
|
11 Apr 2017, 18:38 |
Raúl Villanueva-Guerrero | XTD2 | Feedback | Beam Stopper and V0 valve test - SUCCESSFUL | The Interlock conditions for these
two components has been positively tested
but not exhaustively done: |
|
138
|
11 Apr 2017, 22:36 |
Jan Grünert | XTD2 | Information | XGMs in loop | Both SASE1 XGMs (in XTD2 and XTD9) are
now again in the Vacuum Control Loop, their
vacuum being controlled by Beckhoff/karabo. |
|
162
|
21 Apr 2017, 15:26 |
Jan Grünert | XTD2 | Information | Cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9 |
Together with Nerea and Wajid and Alessandro
10:00
closed vatterflies at XTD9 and XTD2 from
KaraboFlorian is at XTD9 next to |
|
172
|
26 Apr 2017, 10:51 |
Jan Grünert | XTD2 | Problem | karaboGUI issues - during cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9 |
Problems described in detail below
(this entire procedure takes way too much
of our time, effectively still nearly 2 hours!):
Nerea/AE |
|