Group Selection Page HELP Controls Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip MigratedByGroup
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 30 of 30  Not logged in ELOG logo
Entry   Access to XTD2, posted by Tobias Haas on 04 Apr 2017, 15:11 

MPS informed me that they hit some problems and that they still need 30 mins to 1 h until we can go to XTD.  

Entry   Access XTD2 tomorrow, posted by Tobias Haas on 26 Apr 2017, 17:48 

I added the requests that I was made aware of to the list of access requests for tomorrow. While the interlock in XTD2 will be broken and hence the tunnel is accessible without special procedures, please note the followoing

  • Please make sure your request in in the DESY table of access requests 
  • You have valid access permissions and two (!) dosimeters, one from XFEL one from DESY

 

 

Entry   Acceptance test IMAGERS (FRIDAY 07-04-2017), posted by wajid ehsan on 07 Apr 2017, 19:13 

 

SA1_XTD2_IMGPII45:
 
1) MOTOR/SCREEN(DONE)
2) Check operation of range of movement, defined by end switches (DONE
3) Check repeatability (DONE)
4) Switch on/off LED (DONE)
5) Switch on/off camera (DONE)
6) Acquire images with a camera (DONE)
7) Hardware Trigger of camera (DONE)
8) EPS switch (DONE)

SA1_XTD2_IMGFEL:
 
1) Move all motors (DONE)
 1.1) MOTOR/SCREEN (DONE)
 1.2) MOTOR/FILTER (DONE)
3) Check operation of range of movement, defined by end switches (DONE)
 3.1)  END_ Switches/SCREEN (DONE)
 3.2) END_Switch/FILTER (DONE
4) Check repeatability (DONE)
5) Switch on/off LED. (DONE)
6) Switch on/off camera. (DONE)
7) Take images with a camera. (DONE)
8) Trigger of camera (DONE)
9) ESP switch (NOT WORKING, hardware issue, to be tested)
10) Braking switch_SCREEN_MOTOR (NOT WORKING, to be tested)

SA1_XTD2_IMGSR:
1)  Test motors.  (DONE)
 1.1) Motor/Screen (DONE)
 1.2) Motor/y (DONE)
 1.3) Motor/ Focus (DONE)
 1.4) Motor / IRIS (DONE)
2) End Switches:
 2.1 Motor/Screen (DONE)
 2.2 Motor/y (DONE)
3. Check repeatability(DONE)
4. Switch on/off LED (DONE)
5. Switch on/off camera (DONE)
6. Acquire images (NOT DONE, Photonic science camera device is not working but acquired images with eBus(low level driver))
7) EPS (DONE)
8) Braking switch_SCREEN_MOTOR (NOT WORKING)

 

Entry   Accelerator plans for the next 5 days, posted by Tobias Haas on 27 Apr 2017, 15:28 
27/04 Th A Beam operation to TLD 10 GeV, 1 bunches, 0.1 nC, 1 Hz; interlock 
set XTD2-XTD4
27/04 Th N Beam operation to TLD 10 GeV, 1 bunches, 0.1 nC, 1 Hz, EOD shift
28/04 Fr M Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
28/04 Fr A Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
28/04 Fr N Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz 
29/04 Sa M Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
29/04 Sa A Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
29/04 Sa N Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
30/04 Su M Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
30/04 Su A Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
30/04 Su N Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz 
01/05 Mo M Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
01/05 Mo A Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
01/05 Mo N Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz
 
Access to TLD:  
Entry   Accelerator Schedule for the next days, posted by Tobias Haas on 03 May 2017, 13:38 

 Author: Decking

Run Coordinators: W. Decking (93430), D. Sanzone

Tunnels XTIN, XTL, XTD2-4, XTD10 closed
Temporary access to XTL,XTD2-4, XTD10 possible on Wed, 4.5.
Next open access XTIN, XTL, XTD2-4, XTD10 on Wed, 10.05. 08-16

|01/05 Mo M |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo A | Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo N |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu M |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz; establish 6, 8 GeV File
|02/05 Tu A |  Beam operation  to T4D 6 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu N |  Beam operation  to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We M |  Beam operation  to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz; study beam optics
|03/05 We A |  Beam operation  to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We N |  Beam operation  to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz 
|04/05 Th M |  Beam operation  to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|04/05 Th A |  No beam operation, tunnels closed
|04/05 Th N |  No beam operation, tunnels closed
|05/05 Fr M |  No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr A |  No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr N |  No beam operation, tunnels closed
|06/05 Sa M |  No beam operation, tunnels closed
|06/05 Sa A |  No beam operation, tunnels closed
|06/05 Sa N |  No beam operation, tunnels closed
|07/05 Su M |  No beam operation, tunnels closed
|07/05 Su A |  No beam operation, tunnels closed
|07/05 Su N |  No beam operation, tunnels closed
|08/05 Mo M |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo A |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo N |  Beam operation  to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz

Entry   AE PLC OCD, posted by Tobias Freyermuth on 22 May 2017, 11:06 

From now on the PLC OCD contact person will have always the phone number:

  9 8040

Entry   AE OCD Mai 5 -- Mai 8, posted by Nicola Coppola on 05 May 2017, 14:35 

AE on call service:

    Contact person:

        Nicola Coppola

    Phone:

        9 - 5627

 

Entry   AE OCD Mai 19 -- Mai 22, posted by Nicola Coppola on 19 May 2017, 15:42 

AE on call service:

    Contact person:

        Nicola Coppola

    Phone:

        9 - 5627

Entry   AE OCD April 29 - Mai 1, posted by Tobias Freyermuth on 28 Apr 2017, 14:31 

AE on call service:

    Contact person:

        Tobias Freyermuth

    Phone:

        9 - 6822

   

Entry   1Hz Triggers , posted by Bruno Fernandes on 10 Jan 2018, 17:20 

Hello everyone,

The main Timing System at DESY, which distributes all timing information to our systems, is right now configured to generate 1Hz trigger signals on Event #16. This is the trigger that is deliver to most detectors/cameras on our site.

DESY is testing a new Gun and wanted to use a slower trigger frequency during this evaluation.

We were not inform in advance about this reconfiguration. After a few colleagues from SPB approach us reporting this problem, we contacted DESY and got the update. We will take steps to make sure that future Timing changes done by DESY are communicated to XFEL ahead of time.

Entry   *IMPORTANT* Change of plans re Access tomorrow, posted by Tobias Haas on 03 May 2017, 13:29 
Due the recent results from XFEL, the urgent maintenance is shiftet from Thursday 4th to Friday 
5th. On Thursday, there will be operation till 14:00, after 14:00 the machine will be 
switched to standby. All the work planned will shift accordingly by one day. No ZZ before 
Thursday 14:00. 
 
The machine will be shut down Friday moring 7:00. 
 
Interlock situation: The machine will stay in interlock, only the access to XTL from OSDORF will 
be brocken.  
 
XTL: Access from Osdorf 
- activation measurement XS1 XTL/rear part by D3 
- Leak search and repair in the TLD beamline by MVS 
- A20 work by MHF-p (Exchange of filament heating, work on phase shifter) 
- CS8 RF measurement on load (MHF-p) 
- Repair of wire scanner relais 
 
XTL: Access from Bahrenfeld 
- Exchange of filter in the BCM monitors by MKS 
- Repair of DCCT of a B2D quad 
- Change of AMC board in A8 by MSK 
 
XTD2: 
- ZZ for repair of a BPM system 
XTD10:  
ZZ for Photon Beamline Work 
 
 
All further work has to be agreed by the run or machine coordination. 
 
Entry   switch software update - ITDM request, posted by Adriano Violante on 10 Sep 2018, 09:12 

The office switched reported below have to be upgraded. Some of them belong to accelerator and some to us. Below you find the detailed list of the switches and the time schedule (assuming everything runs fine) for the update. ITDM needs feedback the latest today evening.  

if you see problems with the upgrade, please reply to this e-mail. If we do not receive complaints until this evening, we assume that everything is fine.

 

 

Monday, 24.09.2018, 06:00 - 08:00 am:

sw-hh-al-324.desy.de    XFEL_XHEXP1_SASE2_A21.UH3.03

sw-hh-al-325.desy.de    XFEL_XHEXP1_SASE2_A22.UH7.02

sw-hh-al-323.desy.de    XFEL_XHEXP1_SASE3_E21.UH2.03

sw-hh-al-322.desy.de    XFEL_XHEXP1_SASE3_E22.UH3.01

sw-hh-al-274.desy.de    XFEL_XHQ.1.174

sw-hh-al-298.desy.de    XFEL_XSDU1_UG01.001_R01_3175m

sw-hh-al-295.desy.de    XFEL_XTD1_SA2.R002_R26_2238m

sw-hh-al-296.desy.de    XFEL_XTD1_SA2.R005_R16_2384m

sw-hh-al-297.desy.de    XFEL_XTD1_T3.R007_R33_2500m

sw-hh-al-299.desy.de    XFEL_XTD1_T3.R010_2.1_2581m

 

Tuesday, 25.09.2018, 06:00 - 08:00 am:

 

sw-hh-al-287.desy.de    XFEL_XTD10_3.13_3297m

sw-hh-al-285.desy.de    XFEL_XTD10_3.4_3141m

sw-hh-al-286.desy.de    XFEL_XTD10_3.7_3209m

sw-hh-al-290.desy.de    XFEL_XTD2_T4.R009_R14_2590m

sw-hh-al-293.desy.de    XFEL_XTD3_T5.R005_R01_2846m

sw-hh-al-292.desy.de    XFEL_XTD3_UN1.R002_R16_2740m

sw-hh-al-288.desy.de    XFEL_XTD4_SA3.R001_R27_2838m

sw-hh-al-289.desy.de    XFEL_XTD4_SA3.R002_R48_2888m

sw-hh-al-291.desy.de    XFEL_XTD4_T4D.R006_R19_3057m

sw-hh-al-294.desy.de    XFEL_XTD5_UN2.R001_R04_2972m

Entry   motion loop not working !?, posted by Andreas Koch on 06 Apr 2017, 13:36 

Has anyone an idea why the motion loop is not working? Thanks Andreas

    Reply   motion loop not working !?, posted by Andreas Koch on 06 Apr 2017, 14:32 

Andreas Koch wrote:

Has anyone an idea why the motion loop is not working? Thanks Andreas

Hello Andreas,
please use redmine for bug reports. I opened a redmine issue for this:

https://in.xfel.eu/redmine/issues/16265

Please log in and give more details on what you experienced.

In case of emergency contact your main contact person Wajid.

Cheers

Alessandro

    Reply   motion loop not working !?, posted by Andreas Koch on 06 Apr 2017, 14:45 

Andreas Koch wrote:

Andreas Koch wrote:

Has anyone an idea why the motion loop is not working? Thanks Andreas

Hello Andreas,
please use redmine for bug reports. I opened a redmine issue for this:

https://in.xfel.eu/redmine/issues/16265

Please log in and give more details on what you experienced.

In case of emergency contact your main contact person Wajid.

Cheers

Alessandro

 Thanks, Alessandro,

It's working again.
It was the Wifi that slowed down.
Andreas
 
Entry   Karabo Names in Vacuum component list, posted by Tobias Haas on 24 Jan 2017, 08:23 

 Post on behalf of Alessandro Silenzi:

 

please find below the link to the first version of the master component list and the link to the direct download:
 
 
 
Please give your comments directly to me to avoid confusion.
 
The next steps after collecting your input, will be to implement a test in the Firmware project generation that will test the deviceIds against this list.
 
Best regards
 
Alessandro Silenzi
 
Entry   , posted by Adriano Violante on 14 Sep 2018, 13:38 
 
ELOG V3.1.4-7c3fd00