EPS loop, posted by NEREA JARDON on 18 Apr 2017, 12:09
|
Dear all,
The EPS loop is running again with the last modifications concerning devices' names.
Thank you. |
EPS loop, posted by NEREA JARDON on 09 May 2017, 16:43
|
Dear all,
I will make an update on the EPS loop, it will take only a moment.
Thank you |
EPS loop, posted by NEREA JARDON on 09 May 2017, 17:04
|
EPS loop in SASE1 is running again |
EPS loop, posted by NEREA JARDON on 07 Jul 2017, 13:24
|
Dear all,
We need to update EPS SASE1 loop in order to finish the interlock communication for the experiments. I will do the update around 14h.
Thank you! |
EPS & Motion, posted by NEREA JARDON on 10 Apr 2017, 20:05
|
Dear all,
EPS and Motion loop have been updated to the last framework version with the last hotfixed. Vacuum loop would be done tomorrow in order to let
the XGM work the hole night and part of the morning tomorrow. |
Details on SPB issues reported in the dispatch meetings, posted by Adriano Violante on 05 Mar 2018, 16:37
|
Below some clarifications from R. Bean on the issues reported in today's dispatch meeting:
- AGIPD suffered many problems which affected the operability (not really a problem of the scene). It was just operable, although not at all |
Dates TÜV Test SASE3 Intelrocks, posted by Adriano Violante on 13 Apr 2018, 13:01
|
Interlock systems SASE3 - TÜV test
The pre test by D3 will be held on 20.06.
On 05.07.The TÜV Test for SASE3 will be done together with the SASE2 test and the repetition of the SASE1 test |
DESY wants to close XTD2 & XTD4 over the weekend..., posted by Tobias Haas on 05 Apr 2017, 16:40
|
I expect that some of us may need the weekend as a reserve (e. g. mirror installation). So we should probably say no. Let's discuss more tomorrow at
09:30 |
Cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9, posted by Jan Grünert on 21 Apr 2017, 15:26
|
Together with Nerea and Wajid and Alessandro
10:00 closed vatterflies at XTD9 and XTD2 from KaraboFlorian is at XTD9 next to
the XGM XTD9:
LOOP re-cycleAll valve closed and scroll off (turbos in unknown state; Florian in tunnel sees 990 Hz)Scroll
and turbos switched ONAngle valve opened over KaraboProblem to open gate-valveSet Karabo offlineNerea switched |
Current Vacuum Status, posted by Alessandro Silenzi on 15 Feb 2017, 20:10
|
The PLC is still not completely error free.
It is considerably better performing than the last days:
the current average pressure as measured by the Ion Pumps is 4.21e-09 mBar |
Current Status, posted by Alessandro Silenzi on 12 Feb 2017, 14:02
|
Vacuum loop:
- Interface between PLC and Karabo is not functioning.
The fault currently resides in the PLC behaviour, the self-description sent out is badly formatted (due to a buffer overrun) |
Current PLC-Karabo Conflict, posted by Alessandro Silenzi on 03 Nov 2016, 12:58
|
Tobias Freyermuth and me worked on the system and as of |
Correction to plans for Vacuum (e-log message n3. 199) in XTD9, posted by Raúl Villanueva-Guerrero on 03 May 2017, 11:15
|
Dear all,
it seems that this morning was somehow a misunderstanding. The XTD9 Gas Section Interlock test was succesfully finished the last 26th of April
(see e-log message nr. 179). |
Control network maintenance, posted by Janusz Szuba on 04 Apr 2018, 17:35
|
Tomorrow, 5.04, between 9:30 and 12:00 there will be urgent maintenance of one of the two redundant main switches for the control network. The network
connectivity during that time is not guaranteed, but also any major interruptions are not expected. For the two switches in sase1 tunnels with only one
uplink, there could be short (~1min) interruption. |
Component table update, posted by Thomas Tschentscher on 27 Jan 2017, 10:22
|
|
CRL, posted by Lewis Batchelor on 10 Mar 2017, 14:56
|
The XTD2 CRL is now aligned and cabled.
Motor cabling is complete and ready for local testing. Encoder and PT100 cabling at rack to be completed by the middle of week 11. |
CAS support during the afternoon: 9-6776, posted by Sandor Brockhauser on 04 May 2017, 12:14
|
Dear All,
During the afternoon CAS has a group activity. Any support can be requested via my phone number: 9-6776. |
CAS On-Call Duty Planning (Until 11/06), posted by Hugo Silva Santos on 16 May 2017, 14:55
|
Dear All,
I would like to share the CAS OCD Planning
until 11/06: |
CAS OCD: Support requested starting SA1_XTD2_MCP/ADC/MCP3, posted by David Hickin on 21 May 2017, 15:02
|
Contacted at home 21:30 19.05. Request for support starting SA1_XTD2_MCP/CDC/MCP3 on cppServer/sa1_utca_17.
Located project and device server. Attempted to start SA1_XTD2_MCP/CDC/MCP3. Issue was missing fastAdc plugin. Found info on sa1_utca_17 in commissioning
guidelines: say server is exflutc106. |
CAS OCD: Support requested starting SA1_XTD2_MCP/ADC/MCP3, posted by David Hickin on 21 May 2017, 16:28
|
David Hickin wrote:
Contacted at home 21:30 19.05. Request for support starting SA1_XTD2_MCP/CDC/MCP3 on cppServer/sa1_utca_17. |