ID Date Author Location Severity Subjectdown
  144   13 Apr 2017, 14:09 Tobias HaasGeneralInformationInterlock tests are finished in Northern Fan

All northern tunnels XTD2/4/9/10 are fully accessible again! 

  63   08 Mar 2017, 13:11 NEREA JARDONXTD9InformationInterlock tests DPS

The interlock test in XTD9-DPS has been done. The Vacuum PLC is again available for Karaboo.

  68   10 Mar 2017, 11:18 Tobias HaasXHEXPInformationInstrument Component Priority List update after SASE1 Readiness Meeting
Attachment 1: 170310_Instrument_Components-Priority-list.xlsx
  33   02 Feb 2017, 16:56 Tobias HaasGeneralInformationInstallation List Update

 Updates as of 2 Feb 16:30

Attachment 1: Components-XTD2-9.xlsx
  336   14 Jul 2017, 18:46 Nicola CoppolaGeneralInformationInformation AE OCD July 14--17 (till Monday 8:00)

AE on call service:

    Contact person:

        Nicola Coppola

    Phone

        9 - 8040

  285   09 Jun 2017, 19:09 Nicola CoppolaGeneralInformationInformation AE OCD June 9 -- 12

 AE/PLC on call service:

     Contact Person:

              Nicola Coppolla

    Phone:

   9 - 8040

  331   13 Jul 2017, 18:15 Nicola CoppolaGeneralInformationInformation AE OCD July 13

AE on call service:

    Contact person:

        Nicola Coppola

    Phone

        9 - 8040

  205   04 May 2017, 11:36 Tobias HaasGeneralInformationInfo from H. Sinn

 Hallo allerseits

 
der Beschleuniger wird heute um 13:00 Uhr abgeschaltet und erst wieder Montag 
angeschaltet. Ich hab Winni überredet, dass wir den XTD10 brechen können, damit ihr 
heute und  morgen im XTD10 Zugang habt. 
Allerdings solltet ihr nicht die Magnettür zum XSDU2 öffnen, weil dann auch der komplette XTD4 
aus dem Interlock fällt. 
Ich hab mit Michael Bieler verabredet, dass wir in der zweiten Maihälfte Absuchtraining für XFEL Leute 
machen können (bis ca. 10 Leute auf einmal wäre sinnvoll), damit wir in Zukunft dann XTD10 und XTD9 selber 
absuchen könnnen (Termin kommt noch). 
 
Grüße 
 
Harald 
 
  139   12 Apr 2017, 09:16 Andreas KochGeneralInformationImager status

Imager Status, 12.4.17

-          All imagers tested, motors and cameras, motion loop, EPS loop, for 3 imagers XTD2, and 3 imagers XTD9.

-          All blocking issues concerning tunnel closure solved.

-          Remaining issues:

o   Camera trigger, tbd. for 4 imagers.

o   Camera driver for SR imager, Photonic Science, tbd.

o   Camera of sa1-xtd9-imgpii45-cam-beamview not reachable via IP address, tbd..

o   Camera display is now at around 2 Hz, not yet full speed.

o   Store image function, tbd.

o   Firmware update to operate braking switches for homing procedure, tbd.

  249   18 May 2017, 16:32 Andreas KochXTD2FeedbackImager status

After the update of the PLC firmware, the imagers are in following status:

SR: auto gain off seems to work, correct image, screens are out. Beamview just crashed, I asked Alessandro and Dennis to have a look.

Pop-In: Everything fine.

FEL: strange image. We had this before, no idea what the reason is. I will keep trying.

Another update of the motion loop is planned later. Contact Nerea for details.

  108   06 Apr 2017, 09:16 Andreas KochXTD2InformationImager

-

XTD2, FEL imager with Wajid

Screen, motor, switches - ok, minor braking switch issue.

LED, camera power – ok.

Filter, motor, parameter issue, should be solved now, to be tested again today.

EPS tests and SR imager tests, to be done.

 

XTD9 cameras, no power, will check today with Bernard.

 

  118   07 Apr 2017, 17:43 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed

Dear collogues,

 

all loops are up and running after deploying the hotfix.

 

Have a nice weekend,

    Tobias

  119   07 Apr 2017, 17:54 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed

Tobias Freyermuth wrote:

Dear collogues,

 

all loops are up and running after deploying the hotfix.

 

Have a nice weekend,

    Tobias

 

 Confirmed from Karabo side.

  117   07 Apr 2017, 16:41 Tobias FreyermuthGeneralInformationHotfix for all loops (VAC, MOV, EPS)

Dear collogues,

we have added a hotfix to the framework, to make sure, that no motor can be moved if the feedback signals are missing. This update will be done due to the mentioned issue in the readiness meeting this morning.

We will update the loops again after the weekend, with a proper solution.

The hotfix will send all devices of a loop into error if the feedback of a terminal in the loop is missing.

I will write a new entire in the Logbook, if we are done with the updates.

 

Cheers,

    Tobias

  204   03 May 2017, 14:38 Raśl Villanueva-GuerreroXTD9FeedbackGas Section Interlock on XTD9 - Shut off valve also operative

 Dear all,

during the test run today by our colleagues of WP74, the interlock condition inside the XGM module was met (small volume pressure burst up to 10-2 mbar range). Now we can see also the expected cut-off event of the gas injection (see attached pictured). It seems that the reason why there was any feedback from the respective shut-off valve was the solenoid actuator on the respective shut-off valve was set in manual mode.

This means that XTD9 Interlock for the whole gas section has been up and running as expected the whole time.

Best Regards.

Attachment 1: 45.png
45.png
  201   03 May 2017, 12:32 Alessandro SilenziGeneralInformationGUI Server redeployment

The GUI server has been redeployed and a second one has been added.

In order to access those:

please log out of the gateway and log in again using the usual command

ssh desyusername@exflgateway -L 44444:sa1-br-sys-con-gui1:44444

or

ssh desyusername@exflgateway -L 44444:sa1-br-sys-con-gui2:44444
  79   16 Mar 2017, 16:54 NEREA JARDONGeneralInformationFuses replacement

Dear all,

Tomorrow in the morning is needed to add some fuses in the PLCs crate, therefore Vacuum and Motion would be down for more or less one hour from 9am. I will notify you when the PLCs are available to work again.

Thank you,

  433   08 Dec 2017, 15:49 Tobias HaasGeneralInformationFire alarms in tunnels and shafts on 13 Dec 9 - 11

FYI

Author: F. Saretzki

English version below

Ankündigung:

Aufgrund von Sachverständigenprüfungen wird es am folgenden Termin zu Auslösungen des Evakuierungsalarms kommen:

Gebäude: XHE2/XS2, XHE4/XS4, XSDU1, XTD1, 3, 5, 6, 7 und 8
Datum: 13.12.2017 ca. 09:00 Uhr – 11:00 Uhr


Sie brauchen bei ertönen der Sirene in diesen Zeiträumen das Gebäude nicht verlassen.

============================================================================
Announcement:

Due to expert testing there will be an evacuation alarm on the following date:

Building: XHE2/XS2, XHE4/XS4, XSDU1, XTD1, 3, 5, 6, 7 and 8
Date: 13th of December 2017 between 09:00 a.m. and 11:00 a.m.


You don’t need to exit the building while the alarm occurs.

 

  186   28 Apr 2017, 08:25 Adriano ViolanteXHEXPInformationFertigmeldung phase II cables SPB Optics Hutch D.02 and SPB laser hutch D.13

 ACTEMIUM has delivered the handover document for the phase II cables installed in D,02 and D.13. The beckhoff crates can be connected to the cables in these areas of SASE1.

 

  346   26 Jul 2017, 18:04 Martin DommachXTD9InformationFast valves in XTD9

Dear all,

the problem with the fast valves XTD9 tripping randomly is still not fully understood but we exchanged the controllers for both valves and they now seem to be stable. The valves are set back to active mode again with 1*10^-6 mbar trigger level while vacuum pressure at the sensors is around 1*10^-8 mbar.

In case one of the valves closes again in the next time you can do the following:
1. check the ion pump pressure in the beamline to make sure that it’s not a real event (they should be in 10^-8 mbar range or better)
2. If it’s not a real vacuum inrush you can open the valve by pressing “Open" button followed by the “Reset” button (SPB: Karabo scene SA1_XTD2_VAC/V11030F or for FXE: SA1_XTD2_VAC/V12030F )
3. Open the adjacent gate valves which were triggered by the vacuum interlock and continue with beam operation
4. Please inform the vacuum group (vacuum@xfel.eu)
 
If opening the valve again does not help because it trips to often, the fast valve can be disabled:
1. Open the valve by pressing “Open” button
2. When the valve is open again, switch off the high voltage of both sensors
3. Please inform the vacuum group (vacuum@xfel.eu)
 
Best regards,
Martin