Motion loop, posted by NEREA JARDON on 22 Mar 2017, 16:28
|
Dear all,
tomorrow morning at 10h am, we will need the Motion PLC for roughly half hour to do some tests. During this time the PLC will be stop.
|
Motion Loop, posted by NEREA JARDON on 22 Mar 2017, 15:05
|
FYI. The Motion loop is again up and running. |
Loop status schedule for KW12, posted by Adriano Violante on 17 Mar 2017, 15:21
|
Dear all,
find here the foreseen loop status for KW12. The schedule could change. All changes will be notified by entries in the logbook.
Day |
Motion |
Vacuum |
EPS |
Other |
Monday |
Loop is up. |
Loop up. |
Loop up |
|
Tuesday |
Loop is up. |
Loop down. AE updates loop (maybe short ) |
Loop up |
|
Wednesday |
Loop down. AE updates loop |
Loop up |
Loop up |
|
Thursday |
Loop up |
Loop up |
Loop up |
|
Friday |
Loop up |
Loop up |
Loop up |
|
|
Updated Tunnel component status list, posted by Thomas Tschentscher on 17 Mar 2017, 12:11
|
Updated list of tunnel high priority components after SASE1 Readiness mtg this morning. The list has also been sent for comments/clarifications to the involved Groups/People. |
Loops up, posted by NEREA JARDON on 17 Mar 2017, 10:49
|
Dear all, Vacuum and Motion loops are running again.
Thank you, |
Fuses replacement, posted by NEREA JARDON on 16 Mar 2017, 16:54
|
Dear all,
Tomorrow in the morning is needed to add some fuses in the PLCs crate, therefore Vacuum and Motion would be down for more or less one hour from 9am. I will notify you when the PLCs are available to work again.
Thank you, |
Wiring status, posted by Torben Falk on 16 Mar 2017, 13:34
|
Wiring status SASE 1:
Wiring progress:
- Internal wiring of the XGM in XTD 9 is done.
- Vacuum part wiring of the XGM in XTD 9 is done (ready for local Beckhoff test).
- Gas Panel wiring of the XGM in XTD 9 is done.
- Crate wiring (ADAM & Femto crate) of the XGM in XTD 9 is done.
Upcoming work XTD 2:
- Serial connection from Beckhoff to TCP 350.
- Change cold plug cables into halogenfree cables.
Upcoming work XTD 9:
- INHIBIT connection Iseg HV crate.
- Serial connection from MTCA to RVC 300.
Upcoming work XTD 10:
- Vacuum part wiring of XGM.
- Gas Panel wiring of XGM.
- Internal wiring of XGM.
- Installing ADAM & Femto crate.
- Measure cable lengths for Imager and prepare cables.
|
Vacuum and Motion, posted by NEREA JARDON on 15 Mar 2017, 17:00
|
Vacumm and Motion are running again after the hardware changes. |
Vacuum and Motion, posted by NEREA JARDON on 15 Mar 2017, 11:31
|
Today Denis has to make some changes in the Vacuum and Motion hardware loop, therefore they would be down some time.
At least, we would try to keep the Vacuum loop up again for 3pm, therefore Valerii and Raul could use it with Karaboo. |
XTD2 Imagers, posted by Andreas Koch on 15 Mar 2017, 08:13
|
XTD2, IMAG.2694.T9, Pop-In II-45: Acceptance test of motor control under Karabo, done. Camera device needs further explanations and testing. |
Vacuum and Motion down, posted by NEREA JARDON on 14 Mar 2017, 13:55
|
Dear all,
Finally today the Vacuum and Motion will still running the hole day and I would have to stop them tomorrow morning. Before doing this operation, I will post an entry in the ELOG. |
Vacuum and Motion down, posted by NEREA JARDON on 13 Mar 2017, 15:47
|
Tomorrow, 14th of March, Vacuum and Motion loop will be down at least during morning due to technical reasons .
I will notify you when the works are finished. |
Tunnel Commissioning Schedule for Week 11, posted by Tobias Haas on 10 Mar 2017, 16:56
|
Day |
Motion |
Vacuum |
EPS |
Other |
Monday |
Loop is up. AE continues tests on MC2 lib |
Loop up. AE investigates problem with ion pump controller |
Loop inactive |
|
Tuesday |
Loop is up. AE continues tests on MC2 lib |
Loop down. AE implements fix for ion pump controller |
Loop inactive |
|
Wednesday |
Loop down. AE adds ELMO and TECHNOSOFT |
Loop up for testing |
AE brings up loop |
|
Thursday |
Loop down. AE adds ELMO and TECHNOSOFT |
Loop up for testing |
AE brings up loop |
|
Friday |
Loop up for testing |
Loop up for testing |
Loop up for testing |
|
In addition it should be tried to have a so called "Happy Hour" every day from 0800 - 1000. During this time loops should be up if possible. Meaning that in the evening before leaving, developers bring loops back up. |
CRL, posted by Lewis Batchelor on 10 Mar 2017, 14:56
|
The XTD2 CRL is now aligned and cabled.
Motor cabling is complete and ready for local testing. Encoder and PT100 cabling at rack to be completed by the middle of week 11. |
Update of Tunnel Component Priority List after SASE1 Readiness Meeting, posted by Tobias Haas on 10 Mar 2017, 12:53
|
Note that due to a bug in the elog the name appeared wrongly in my previous message. In general: Avoid underscores in the file names! |
Link to the redmin list of Tasks., posted by Alessandro Silenzi on 10 Mar 2017, 11:34
|
https://in.xfel.eu/redmine/projects/control-support/issues
Short Instructions:
- Add your task
- Select your work package
- Do NOT set the assignee
- Do NOT set the priority
|
Instrument Component Priority List update after SASE1 Readiness Meeting, posted by Tobias Haas on 10 Mar 2017, 11:18
|
|
Update of Tunnel Component Priority List after SASE1 Readiness Meeting, posted by Tobias Haas on 10 Mar 2017, 11:15
|
|
Karabo Deployment Documentation link, posted by Alessandro Silenzi on 08 Mar 2017, 18:26
|
Url to the readthedocs documentation:
https://goo.gl/vsz9hu |
Karabo testing, posted by Andreas Koch on 08 Mar 2017, 16:18
|
Here the link to the detailed list of issues: https://docs.xfel.eu/share/page/site/xfelwp74/document-details?nodeRef=workspace://SpacesStore/1733b825-e62e-47af-abba-fdef1ff9485d |