  137   11 Apr 2017, 18:38 Raśl Villanueva-GuerreroXTD2FeedbackBeam Stopper and V0 valve test - SUCCESSFUL The Interlock conditions for these
two components has been positively tested
but not exhaustively done:
  
  136   11 Apr 2017, 18:29 Raśl Villanueva-GuerreroXTD2FeedbackFast Valve Test - SUCCESFUL The Fast Valve test has been positively
tested. 
It has been consider that the signal
  
  135   11 Apr 2017, 17:44 Raśl Villanueva-GuerreroXTD2FeedbackXTD2 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESSFUL The interlock definition for complete
isolation of the whole section based on high
pressure signal has been successfully tested. 
  
  134   11 Apr 2017, 15:38 NEREA JARDONGeneralInformationEPS loopDear all,
The EPS loop would be stopped, in
order to correct some issues with the hardware
  
  133   11 Apr 2017, 15:24 Jan GrünertXTD2ProblemBig issue with XGM vacuum in both XTD2 and XTD9 !
Both XGMs were and are on manual control
(but the remote cables into the turbo pump
controllers remained plugged in as usual)
  
  132   11 Apr 2017, 13:48 Alessandro SilenziGeneralInformationScript to install the latest karaboPlease find in attachment the dowload bash
script for the latest Karabo.
if your system has a "karabo"
 download.sh 
  131   11 Apr 2017, 13:32 NEREA JARDONGeneralInformationMotion loopDear all,
Sorry for disturbing again, I will
do a small update to put one missing coupler
  
  130   11 Apr 2017, 13:24 NEREA JARDONGeneralInformationMotion LoopDear all,
Motion loop is running again with
the last update (names for PSLIT and LVDT
  
  129   11 Apr 2017, 12:51 Tobias HaasGeneralInformationStatus after 0930 meetingTunnel   
  128   11 Apr 2017, 11:48 NEREA JARDONGeneralInformationVacuum LoopDear all,
Vacuum loop is up and running, we
would wait till Raul check the interlock
  
  127   10 Apr 2017, 20:05 NEREA JARDONGeneralInformationEPS & MotionDear all,
EPS and Motion loop have been updated
to the last framework version with the last
  
  126   10 Apr 2017, 19:19 Tobias FreyermuthGeneralInformationupdate of the EPS loopDear cllougues,
 


  
  125   10 Apr 2017, 18:13 NEREA JARDONGeneralInformationVacuum LoopDear all,
Right now both XGMs are into the
loop and would be running. The loop must
  
  124   10 Apr 2017, 12:31 Alessandro SilenziGeneralInformationKARABO Update maintainanceThe karabo services will be down for an
upgrade for an hour.
The access will resume at 13:30.
  
  123   10 Apr 2017, 10:47 Tobias HaasGeneralInformationSchedule after 09:30 MeetingTunnel
Open.
  
  122   10 Apr 2017, 10:09 NEREA JARDONGeneralInformationVacuum LoopDear all,
The Vacuum loop is running again,
now with XGM XTD9 included. We will be testing
  
  121   10 Apr 2017, 09:36 NEREA JARDONGeneralInformationVacuum LoopDear all,
I will update the Vacuum loop in
order to add the XGM XTD9 into it. It will
  
  120   07 Apr 2017, 19:13 wajid ehsanXTD2InformationAcceptance test IMAGERS (FRIDAY 07-04-2017) 
SA1_XTD2_IMGPII45:
 
1)
MOTOR/SCREEN(DONE)
2)
  
  119   07 Apr 2017, 17:54 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed

    

       
            
  
  118   07 Apr 2017, 17:43 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed