ID |
Date |
Author |
Location |
Severity |
Subject |
Text |
|
27
|
26 Jan 2017, 17:02 |
Tobias Haas | XTD2 | Problem | XGM at XTD2 / issue with in-vacuum-resistor | Post on behalf
of Jan Grünert: |
|
31
|
01 Feb 2017, 17:42 |
Jan Grünert | General | Problem | XGM resistor issue - analysis progress | This is the current (w5) progress at DESY
concerning the analysis of the serious XGM
resistor issue (summary; a detailed report |
|
45
|
12 Feb 2017, 14:02 |
Alessandro Silenzi | General | Problem | Current Status | Vacuum loop:
- Interface between PLC and Karabo
is not functioning. |
|
46
|
14 Feb 2017, 09:59 |
Alessandro Silenzi | General | Problem | Beckhoff loop status | 2017.02.13 19:30 Status:
- Self-Description back in shape.
- Bad SelfDescription reproduced |
|
64
|
08 Mar 2017, 16:08 |
Andreas Koch | XTD2 | Problem | Karabo testing | End switch testing: the in-position end
switch stopped devices working, also stopped
gateway connection. Stroke of motor is not |
|
133
|
11 Apr 2017, 15:24 |
Jan Grünert | XTD2 | Problem | Big issue with XGM vacuum in both XTD2 and XTD9 ! |
Both XGMs were and are on manual control
(but the remote cables into the turbo pump
controllers remained plugged in as usual) |
|
141
|
13 Apr 2017, 10:15 |
Alessandro Silenzi | General | Problem | EtherCAT loop broken for Vacuum loop | The EtherCAT loop for the vacuum PLC is
interrupted at crate 1.6 (XTD2).
This triggered all Beckhoff Terminals |
|
156
|
21 Apr 2017, 12:28 |
Raúl Villanueva-Guerrero | XTD9 | Problem | FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL | Due to problems and lack of support
of CAS for accessing the devices in XTD9
tunnel through KARABO we couldn´t run |
|
157
|
21 Apr 2017, 13:23 |
Raúl Villanueva-Guerrero | XTD9 | Problem | FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL |
|
|
158
|
21 Apr 2017, 13:35 |
Raúl Villanueva-Guerrero | XTD9 | Problem | FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL |
|
|
159
|
21 Apr 2017, 13:54 |
Jan Tolkiehn | General | Problem | Access to control PC | exflplcgwSA1 seems not reachable. This
inhibits support for the PLC systems. |
|
172
|
26 Apr 2017, 10:51 |
Jan Grünert | XTD2 | Problem | karaboGUI issues - during cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9 |
Problems described in detail below
(this entire procedure takes way too much
of our time, effectively still nearly 2 hours!):
Nerea/AE |
|
178
|
26 Apr 2017, 18:34 |
Jan Grünert | XTD9 | Problem | SA1-VAC loop down (only XTD9) and later restarted | Since around 17h30 all XTD9 VAC loop is
in error. It came back in karabo around 17h50.
XTD2 not affected. |
|
180
|
27 Apr 2017, 07:04 |
Raúl Villanueva-Guerrero | XTD2 | Problem | XTD2 Differential Pumping completely OUT OF OPERATION! | Dear all,
I just checked the Karabo Scene for |
|
181
|
27 Apr 2017, 07:11 |
Raúl Villanueva-Guerrero | XTD2 | Problem | XTD2 Differential Pumping completely OUT OF OPERATION! |
|
|
197
|
02 May 2017, 20:11 |
Jan Grünert | XTD2 | Problem | XGM scenes/devices offline - UHV pressures increasing - Please respond now !! | All devices went into unknown state in
the karabo XGM scenes in XTD2 and XTD9 at
19h52. |
|
198
|
02 May 2017, 22:27 |
Jan Grünert | XTD2 | Problem | XTD9 vacuum now ok, but not in XTD2: turbos on XGM@XTD2 still in ERROR | Wajid and Leonce from CAS have managed
to get us the karabo controls back.
We have now put the XGM@XTD9 back |
|
207
|
04 May 2017, 19:40 |
Jan Grünert | General | Problem | Slow loading in karabo GUI | The current slow response times in the
karabo GUI are the following (some measured
times for reference): |
|
217
|
10 May 2017, 13:03 |
Jan Grünert | XTD2 | Problem | karabo Beckhoff link not reestablished for SASE1 tunnel VAC loop | Could somebody please re-establish the
karabo controls of the SASE1 tunnel VAC loop
(connection with Beckhoff server) ? |
|
218
|
10 May 2017, 13:07 |
Jan Grünert | XTD2 | Problem | karabo Beckhoff link not reestablished for SASE1 tunnel VAC loop |
|
|