Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 24 of 30  Not logged in ELOG logo
ID Date Author Location Severity Subject Text Attachments
  137   11 Apr 2017, 18:38 Raśl Villanueva-GuerreroXTD2FeedbackBeam Stopper and V0 valve test - SUCCESSFUL The Interlock conditions for these
two components has been positively tested
but not exhaustively done:
  
  136   11 Apr 2017, 18:29 Raśl Villanueva-GuerreroXTD2FeedbackFast Valve Test - SUCCESFUL The Fast Valve test has been positively
tested. 
It has been consider that the signal
  
  135   11 Apr 2017, 17:44 Raśl Villanueva-GuerreroXTD2FeedbackXTD2 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESSFUL The interlock definition for complete
isolation of the whole section based on high
pressure signal has been successfully tested. 
  
  134   11 Apr 2017, 15:38 NEREA JARDONGeneralInformationEPS loopDear all,
The EPS loop would be stopped, in
order to correct some issues with the hardware
  
  133   11 Apr 2017, 15:24 Jan GrünertXTD2ProblemBig issue with XGM vacuum in both XTD2 and XTD9 !
Both XGMs were and are on manual control
(but the remote cables into the turbo pump
controllers remained plugged in as usual)
  
  132   11 Apr 2017, 13:48 Alessandro SilenziGeneralInformationScript to install the latest karaboPlease find in attachment the dowload bash
script for the latest Karabo.
if your system has a "karabo"
 download.sh 
  131   11 Apr 2017, 13:32 NEREA JARDONGeneralInformationMotion loopDear all,
Sorry for disturbing again, I will
do a small update to put one missing coupler
  
  130   11 Apr 2017, 13:24 NEREA JARDONGeneralInformationMotion LoopDear all,
Motion loop is running again with
the last update (names for PSLIT and LVDT
  
  129   11 Apr 2017, 12:51 Tobias HaasGeneralInformationStatus after 0930 meetingTunnel   
  128   11 Apr 2017, 11:48 NEREA JARDONGeneralInformationVacuum LoopDear all,
Vacuum loop is up and running, we
would wait till Raul check the interlock
  
  127   10 Apr 2017, 20:05 NEREA JARDONGeneralInformationEPS & MotionDear all,
EPS and Motion loop have been updated
to the last framework version with the last
  
  126   10 Apr 2017, 19:19 Tobias FreyermuthGeneralInformationupdate of the EPS loopDear cllougues,
 


  
  125   10 Apr 2017, 18:13 NEREA JARDONGeneralInformationVacuum LoopDear all,
Right now both XGMs are into the
loop and would be running. The loop must
  
  124   10 Apr 2017, 12:31 Alessandro SilenziGeneralInformationKARABO Update maintainanceThe karabo services will be down for an
upgrade for an hour.
The access will resume at 13:30.
  
  123   10 Apr 2017, 10:47 Tobias HaasGeneralInformationSchedule after 09:30 MeetingTunnel
Open.
  
  122   10 Apr 2017, 10:09 NEREA JARDONGeneralInformationVacuum LoopDear all,
The Vacuum loop is running again,
now with XGM XTD9 included. We will be testing
  
  121   10 Apr 2017, 09:36 NEREA JARDONGeneralInformationVacuum LoopDear all,
I will update the Vacuum loop in
order to add the XGM XTD9 into it. It will
  
  120   07 Apr 2017, 19:13 wajid ehsanXTD2InformationAcceptance test IMAGERS (FRIDAY 07-04-2017) 
SA1_XTD2_IMGPII45:
 
1)
MOTOR/SCREEN(DONE)
2)
  
  119   07 Apr 2017, 17:54 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed

    

       
            
  
  118   07 Apr 2017, 17:43 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed






Normal
0
  
ELOG V3.1.4-7c3fd00