Entry   Shift summary, posted by Tokushi Sato on 05 May 2025, 22:41 

X-ray delivery

  • 8.0 keV, 1300-1600 uJ pulse energy by the end

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
Entry   Shift summary, posted by Tokushi Sato on 04 May 2025, 23:14 

X-ray delivery

  • 8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No major issue today
Entry   Shift summary, posted by Tokushi Sato on 03 May 2025, 23:13 

X-ray delivery

  • 8.0 keV, 1600 uJ pulse energy

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • Once again measured a lot of runs worth of data today

Issues

  • No issues
Entry   Shift summary, posted by Tokushi Sato on 03 May 2025, 06:47 

**X-ray delivery**
- 8.3 , 1600 uJ pulse energy

**Optical laser delivery**
- NS illumination
- 355 nm pump laser

**Achievements/Observations**
- Measured/tested various samples and different pump laser delays and illumination delays

**Issues**
- There was some sample that caused clogging in the morning

Entry   Issue, posted by Andreas Koch on 02 May 2025, 08:07 

Concerning eLog entry #59, SPB PopIn:

The problem of the motor position, driving to the OUT position is fixed.
The MDL for driving the screens is correctly working again.

Entry   Shift summary, posted by Tokushi Sato on 01 May 2025, 23:35 

X-ray delivery

  • 8.3 / 9.3 keV, 1400 uJ pulse energy, 1 hour down time

Optical laser delivery

  • NS illumination
  • 355 nm pump laser

Achievements/Observations

  • PCS finished
  • Preparation for the next experiment; mainly 355 nm.
Entry   Issue, posted by Romain Letrun on 01 May 2025, 07:25 Screenshot_from_2025-05-01_07-21-57.png

SPB pop-in monitor was not dricing to the switch when we retracted it to the "out " position with the MDL this morning. This prevented us to use more than two pulses. We have moved the motor one step of 300 um up, which activated the switch and relased the interlock. This should however be fixed so that the "out" position in the MDL works as expected and the motor operates reliably.

Entry   Shift summary, posted by Romain Letrun on 30 Apr 2025, 22:46 

X-ray delivery

  • 9.3 keV, 1800 uJ pulse energy
  • 1 - 202 pulses at 564 kHz

  • Poor beam stability overall. Lots of intensity fluctuations and rather long time to recover after change of number of pulses in any beamline.

Optical laser delivery

  • 800 nm, 113 pulses, 564 kHz stable delivery

  • Illumination laser aligned

Achievements/Observations

  • Aligned instrument

  • Prepared illumination laser
  • Shot PCS sample for a few minutes

Issues

  • PCS sample clogged (at filter not nozzle) after a few crystal shots

  • A few clogs with nozzle with lyzo, when X-ray were on, even far from the nozzle somehow the splash from the explosion grew on the tip

Entry   Shift summary, posted by Tokushi Sato on 26 Apr 2025, 06:55 

Staff: PV, TS, JK + external collaborators 

X-ray delivery:

10 keV, ~ 800 uJ, 128 pulses, tuning was needed for 10 min. 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of X-ray setup

Issues:

No major issue today.

Entry   Shift summary, posted by Tokushi Sato on 25 Apr 2025, 06:48 

X-ray delivery:

10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of crystals

Issues:

No major issue today.

Entry   Issue, posted by Konopkova Zuzana on 24 Apr 2025, 08:42 

self-seeding level in SA2 is currently very low (~100 uJ, about 50% in the pedestal), need more information on how to proceed - is there any chance to improve the seeding, or should we consider going to sase operation.

Entry   Shift summary, posted by Jayanath Koliyadu on 24 Apr 2025, 06:56 

X-ray delivery:

10 keV, ~ 900 uJ, 128 pulses, tuning was needed for few hours

Achievements / Observations:

Alignment of crystals

Issues:

X-ray beam intensity was weak at 12.7 keV (100 uJ), so we decided to use 10 keV

Entry   Shift summary, posted by Chan Kim on 17 Apr 2025, 01:39 

X-ray delivery

  • 18.8 keV, 260 uJ pulse energy

Optical laser delivery

  • No optical laser

Achievements/Observations

  • Experimental setup optimized, both instrumental side and PIXIE side
  • X-ray beam focused to the PIXIE and transmission measurement was done with several different PIXIE operation conditions.

Issues

  • No beam for ~4.5 hours due to ZZ.
  • X-ray beam not found with IRDa InlineMic after focusing X-ray beam to IRDa sample plane.
  • InlineMic Y motor is in error states. It has to be fixed during the day.
  • upstream kapton window for the downstream vacuum pipe broken. The glue has become loose. No damage by X-ray was visible.
Entry   Shift summary, posted by Tokushi Sato on 14 Apr 2025, 23:08 

X-ray delivery:

20 keV,  250-400 uJ, 250 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

No major issue today

Entry   Status, posted by Jan Gruenert on 14 Apr 2025, 09:50 JG_2025-04-14_um_09.43.03.png

Beam Downtime

During last night, apparently the photon beam was down in all SASE beamlines during two longer periods:

  • between 2:48am and 3h23am (35 min) on 14.4.2025
  • between 5:09am and 6h59am (1 hour 50 min) on 14.4.2025
Entry   Shift summary, posted by Tokushi Sato on 13 Apr 2025, 22:55 

Staff: PV, TS, JK, FK, + users

X-ray delivery:

20 keV, ~ 300-400 uJ, 250 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Lots of data collection

Issues:

No major issue today

Entry   Shift summary, posted by Tokushi Sato on 12 Apr 2025, 23:15 

X-ray delivery:

20 keV, ~ 500 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

Shimadzu camera for Schlieren imaging had issue with shutter, mechanically broken.

Entry   Shift summary, posted by Tokushi Sato on 11 Apr 2025, 23:14 

X-ray delivery:

20 keV, ~ 400 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Spatial and temporal alignment of optical laser setup
Data collection

Entry   Shift summary, posted by Tokushi Sato on 10 Apr 2025, 23:17 

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Rough timing alignment of optical laser setup
Took some initial data 

Issues:

No major issue to report

Entry   Shift summary, posted by Tokushi Sato on 09 Apr 2025, 22:46 

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

20 keV beam to sample position and cameras
Rough alignment of optical setup
 

Issues:

Optical laser from light conversion had issue with shutter control