Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 1 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Shift summary, posted by Yoonhee Kim on 02 Jun 2025, 07:59 
X-ray delivery


9.3 keV, 1600-1700 uJ photon flux, beam down once due to Big Brother intervention. But the signal on HIREX was less than 10 counts.


Optical
laser delivery
Entry   Shift summary, posted by Yoonhee Kim on 01 Jun 2025, 08:48 
X-ray delivery


9.3 keV, 1400 uJ photon flux


Optical laser delivery


ns laser for particle illumination inside the chamber
another ns laser to visualize the tip of capillary on top of the chamber


Achievements/Observations
Entry   Shift summary, posted by Yoonhee Kim on 31 May 2025, 07:30 
X-ray delivery


9.3 keV, 2000 uJ at the beginning, 1600 uJ after 2AM. There was downtime around 15 minutes due to gun issue.
FXE used the
beam until 23:30.


Optical laser delivery
Entry   Shift summary, posted by Yoonhee Kim on 30 May 2025, 07:16 
X-ray delivery


9.3 keV, 2000 uJ pulse energy. Beam was unstable at the beginning.


Optical laser delivery


ns laser for particle illumination inside the chamber,
another ns laser to visualize the tip of capillary on top of the chamber


Achievements/Observations
Entry   Shift summary, posted by Yoonhee Kim on 29 May 2025, 07:07 

X-ray delivery


9.3 keV, 1400-1600 uJ pulse energy, ~1000 uJ for 10 minutes


Optical laser delivery


ns laser for particle illumination inside the chamber,
another ns laser to visualize the tip of capillary on top of the chamber


Achievements/Observations
Entry   Shift summary, posted by Konstantin Kharitonov on 25 May 2025, 23:57 
**X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy

**Optical laser delivery**
Entry   Shift summary, posted by Konstantin Kharitonov on 24 May 2025, 23:06 
Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo** @**Konstantin Kharitonov** 

**X-ray delivery**
- 9.34 keV, 1200-1400 uJ pulse energy
Entry   Shift summary, posted by Chan Kim on 23 May 2025, 23:34 
**X-ray delivery**
- 9.34 keV, 1400-1600 uJ pulse energy

**Optical laser delivery**
Entry   Shift summary, posted by Raphael de Wijn on 22 May 2025, 23:29 
Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Diogo Melo** 

**X-ray delivery**
- 9.34 keV, 1400-1600 uJ pulse energy
Entry   Shift summary, posted by Konstantin Kharitonov on 21 May 2025, 22:41 
Staff: @**Katerina Doerner**  @**Elizabeth Galtry** @**Raphael de Wijn** @**Mohammad Vakili** @**Chan Kim** @**Konstantin Kharitonov** 

**X-ray delivery**
- 9.3 keV, 1400-1600 uJ pulse energy
Entry   Status, posted by Jan Gruenert on 14 May 2025, 09:39 JG_2025-05-14_um_09.37.38.png
Delayed start of SA1 (and SA3) beam delivery

The beam delivery to the North branch (SASE1 / SASE3) was delayed by 24h compared to the plan
due to a malfunction of the smoke detection system in XTD4 and the subsequent investigation and repair.
A ZZ-access to XTD4 on tuesday 13.5.2025 morning to resolve this issue (and scheduled for 7h-9h) turned into a full day access until after 18h,
Entry   Experiment summary, posted by Raphael de Wijn on 13 May 2025, 07:00 
End of in-house beamtime

X-ray delivery


9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, stable over the week


Optical laser delivery
Entry   Shift summary, posted by Raphael de Wijn on 09 May 2025, 06:59 

Shift summary in-house night 2

X-ray delivery


9.3 keV, 2.2-2.5 mJ pulse energy, up to 202 pulses at 0.5MHz, high slope across the train


Optical laser delivery
Entry   Shift summary, posted by Raphael de Wijn on 08 May 2025, 04:56 
Shift summary in-house beamtime night 1

X-ray delivery


9.3 keV, 1.7-2.2 mJ pulse energy, up to 202 pulses at 0.5MHz


Optical laser delivery
Entry   Shift summary, posted by Tokushi Sato on 05 May 2025, 22:41 
X-ray delivery


8.0 keV, 1300-1600 uJ pulse energy by the end


Optical laser delivery


NS illumination
355 nm pump laser


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 04 May 2025, 23:14 
X-ray delivery


8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day


Optical laser
delivery
Entry   Shift summary, posted by Tokushi Sato on 03 May 2025, 23:13 
X-ray delivery


8.0 keV, 1600 uJ pulse energy


Optical laser delivery


NS illumination
355 nm pump laser


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 03 May 2025, 06:47 
**X-ray delivery**
- 8.3 , 1600 uJ pulse energy

**Optical laser delivery**
Entry   Issue, posted by Andreas Koch on 02 May 2025, 08:07 
Concerning eLog entry #59, SPB PopIn:

The problem of the motor position, driving to the OUT position is fixed.
Entry   Shift summary, posted by Tokushi Sato on 01 May 2025, 23:35 
X-ray delivery


8.3 / 9.3 keV, 1400 uJ pulse energy, 1 hour down time


Optical laser delivery


NS illumination
355 nm pump laser


Achievements/Observations
ELOG V3.1.4-7c3fd00