165
|
13 Sep 2024, 23:17 |
Adam Round | SPB | Shift end | On Shift: TS,
FT, CK, AR, PS
X-ray |
|
203
|
23 Nov 2024, 07:09 |
Raphael de Wijn | SPB | Shift end | End of in-house
8496
X-ray |
|
128
|
22 Jul 2024, 15:27 |
Antje Trapp | XRO | SASE3 end of shift summary | this morning, ZZ was done together with
Sylvia Huynh (EEE) to solve softmono pre-mirror
motor issue https://redmine.xfel.eu/issues/177392 |
|
129
|
22 Jul 2024, 15:20 |
Antje Trapp | XRO | SASE2 end of shift summary | Beam is now aligned back to HED for hand-over
to Naresh (see picture)
points achieved: |
|
81
|
11 Apr 2024, 21:54 |
Antje Trapp | XRO | SASE1 MIRROR MOTORS CALIBRATED | Dear all,
we calibrated the mirror vertical
motors to their geometrically neutral. |
|
85
|
20 Apr 2024, 23:58 |
Jan Gruenert | PRC | SA2 status | 20.4.2024 / 22h51:
DOC informed PRC that the SASE2 topic
broker had to be restarted. |
|
198
|
04 Nov 2024, 15:07 |
Frederik Wolff-Fabris | XO | SA2 status | Dear MID colleagues, Svitozar (PRC), Bolko
and Shan (RCs),
This morning we faced the situation |
|
4
|
31 Jan 2024, 11:24 |
Frederik Wolff-Fabris | PRC | SA1 status | A ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the |
|
39
|
28 Feb 2024, 08:57 |
Peter Zalden | FXE | SA1 status | 5.61 keV setpoint in SA1 was confirmed
to correspond to 5.660 keV (+/- 0.003 keV),
see attached. |
|
172
|
21 Sep 2024, 09:50 |
Peter Zalden | FXE | SA1 status | The xray beam drifted significantly on
wednesday and thursday (18. and 19.) but
then was not drifting on friday (20.), see |
|
195
|
28 Oct 2024, 09:58 |
Peter Zalden | FXE | SA1 status | This is to report some findings during
operation that should be looked into (mostly
to avoid in the future, because both negatively |
  |
210
|
26 Nov 2024, 09:47 |
Andreas Koch | XPD | SA1 status | Concerning
damage of the SA1 FEL imager, Operation-2024
eLog #206 |
 |
80
|
10 Apr 2024, 17:03 |
Kelin Tasca | XRO | M3 calibration | - M3 TX moved to 0 in steps of 1 mm and
beam on FXE Pop-In corrected with M3 RY (+)
and M2 RY |
  |
157
|
30 Aug 2024, 13:02 |
Antje Trapp | XRO | M1 Rz damaged - DO NOT MOVE!!! | What has happened:
During euler motion calibration of
M1, we were driving the vertical motors by |
6x |
108
|
19 May 2024, 14:49 |
Antje Trapp | XRO | M1 - M2 - M3 euler fine tuning geometriy parameters | We fine tuned geometry parameters for linear
effects on X motion (parallel offset) for
all three mirrors. |
|
1
|
28 Jan 2024, 13:50 |
Jan Gruenert | PRC | Issue | RC / BKR informs : Beam is down
(since 12h10), all beamlines affected
The reason is failure of a quadrupole |
|
7
|
01 Feb 2024, 21:56 |
Romain Letrun | SPB | Issue | At 21:29:20 today, the number of bunches
in SASE1 was increased from 1 to 352 without
intervention of the SPB/SFX shift crew. 30 |
 |
24
|
13 Feb 2024, 08:52 |
Romain Letrun | SPB | Issue | Like after the previous winter maintenance
period, the shutter of FXE appears as opened
in DOOCS panels even though it is closed |
|
27
|
17 Feb 2024, 08:15 |
Tommaso Mazza | SQS | Issue | The cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed, |
  |
37
|
27 Feb 2024, 09:56 |
Romain Letrun | SPB | Issue | The status of the XTD2 attenuators has
been checked during the experiment last week
and many were found to cause disturbances |
8x |
|