Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 7 of 12  Not logged in ELOG logo
ID Date Author Groupdown Subject Text Attachments
  213   04 Dec 2024, 07:12 Tomas PopelarSPBShift summaryX-ray delivery

19 keV, ~ 400  - 450 uJ, 1
- 128 pulses, stable delivery
  
  6   01 Feb 2024, 07:14 Natalia GerasimovaSCSShift summaryMoning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position
  
  14   06 Feb 2024, 07:17 Giuseppe MercurioSCSShift summary
  
  15   08 Feb 2024, 07:00 Giuseppe MercurioSCSShift summaryLate shift
07.02.24
Laurent, Martin
  
  17   09 Feb 2024, 07:15 Giuseppe MercurioSCSShift summary
night
shift summary

achievements:
  
  20   11 Feb 2024, 06:28 Giuseppe MercurioSCSShift summaryNight
shift summary
Andreas, Giuseppe
  
  23   13 Feb 2024, 06:38 Giuseppe MercurioSCSShift summaryshift
summary
Andreas, Giuseppe
  
  57   20 Mar 2024, 23:03 Giuseppe MercurioSCSShift summary
Late
shift summary


coarse timing
installed
laser shutter on the laser breadboard and
  
  118   07 Jun 2024, 15:19 Giuseppe MercurioSCSShift summary
Morning
Shift Summary for 07.06.2024 (Teguh, Natalia)

Achievements:


Aligned the beamline to
  
  120   08 Jun 2024, 15:21 Natalia GerasimovaSCSShift summary
Morning
shift on 08.06.2024 (Natalia, Teguh, Yi Ping)

Achievements:


Focus the KB to ca. 40
  
  122   09 Jun 2024, 22:21 Giuseppe MercurioSCSShift summaryLate Shift summary

Achievements:
- recovered the beam overlap
  
  133   24 Jul 2024, 15:22 Giuseppe MercurioSCSShift summary
Shift
summary (Natalia, Giuseppe)

Achievements:


M1, M2 pitches adjusted
Grating
  
  137   29 Jul 2024, 06:45 Giuseppe MercurioSCSShift summary## Shift summary night July 28th-29th

Achievements:
- we saw signal on both MCPs (with
  
  1   28 Jan 2024, 13:50 Jan GruenertPRCIssueRC / BKR informs : Beam is down
(since 12h10), all beamlines affected

The reason is failure of a quadrupole
  
  4   31 Jan 2024, 11:24 Frederik Wolff-FabrisPRCSA1 statusA ZZ is taking place today, 31.01 at
11:30, in XTD9 to verify and fix the M3 Pop-in
screen which is currently blocking the
  
  44   01 Mar 2024, 17:11 Naresh KujalaPRCStatus-Machine status

the cold compressor failure occurred
at ~16.30hr today. And it will take around
  
  50   15 Mar 2024, 00:07 Harald SinnPRCIssueSASE1 bunch number was reduced to 10 pulses
for no obvious reason. 

Traced it back to a malfunctioning
 watchdog_error.jpgcracks_in_SA.jpg 
  55   16 Mar 2024, 12:12 Harald SinnPRCIssue11:15 SASE1/SPB called that they observed
and issue with the SASE1 XGM/XTD2: about
every 35 seconds the power reading jumps
  
  56   20 Mar 2024, 12:41 Frederik Wolff-FabrisPRCIssueBKR called PRC around 06:10AM to inform
on vacuum issues at SA1 beamline leading
to a lost beam permission for the North Branch.
  
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
ELOG V3.1.4-7c3fd00