  82   13 Apr 2024, 23:03 Peter ZaldenFXEShift summaryMeasurements to check the impact of bunch
compression on FXE mono transmission were
successful. We could change the peak current
  
  81   11 Apr 2024, 21:54 Antje TrappXROSASE1 MIRROR MOTORS CALIBRATEDDear all,

we calibrated the mirror vertical
motors to their geometrically neutral.
 XRO_optics-setpoints_2024-04-11_22-05-08.png 
  80   10 Apr 2024, 17:03 Kelin TascaXROM3 calibration- M3 TX moved to 0 in steps of 1 mm and
beam on FXE Pop-In corrected with M3 RY (+)
and M2 RY
 SA1_M1_calibration.odsM3_at_nominal_2024-04-10_21-16-39.pngM3_calibrated_2024-04-10_21-20-34.png 
  79   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  78   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- found solid attenuator 0.5mm
silicon inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
  76   08 Apr 2024, 06:37 Marcin SikorskiSPBShift endIn-house/commissioning beam time summary
night 5

X-ray delivery:
  
  75   07 Apr 2024, 07:04 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 4

X-ray delivery:
  
  74   06 Apr 2024, 07:06 Raphael de WijnSPBShift summaryStaff: MS, RB, PS, RdW

In-house/commissioning beam time
summary night 3
  
  73   05 Apr 2024, 07:14 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 2

X-ray delivery:
  
  72   04 Apr 2024, 06:48 Raphael de WijnSPBShift summaryIn-house/commissioning beam time summary
night 1

X-ray delivery:
  
  71   31 Mar 2024, 23:20 Adam RoundSPBShift endX-ray delivery


12.72 keV, 10Hz, ~1.4 mJ/pulse,
some beam drift in the horizontal direction
  
  70   30 Mar 2024, 22:50 Chan KimSPBShift summaryX-ray delivery

- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
continuous beam drift in the horizontal direction
  
  69   30 Mar 2024, 22:02 Chan KimSPBIssueContinuous pointing drift in horizontal
direction.

It may trigger a vacuum spike at
 Screenshot_from_2024-03-30_21-59-03.pngScreenshot_from_2024-03-30_21-09-11.png 
  67   30 Mar 2024, 06:59 Romain LetrunSPBIssueDOOCS panels are again incorrectly reporting
the FXE shutter as opened when it is in fact
closed. This had been fixed after it was
 Screenshot_from_2024-03-30_06-58-42.png 
  68   30 Mar 2024, 00:17 Björn Senfftleben (Resolved) Issues with DAQWe had some trouble with the DAQ. It was
not able to start runs properly.

We got the following error messages:
  
  66   29 Mar 2024, 22:38 Chan KimSPBShift summaryX-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse,
stable delivery 
  
  65   28 Mar 2024, 14:56 Chan KimSPBIssuePulse energy fluctuation observed after
full train operation in SA2 starts.
 Screenshot-from-2024-03-28-14-26-18_1.png 
  64   28 Mar 2024, 14:54 Chan KimSPBShift summaryX-ray delivery


12.72 keV, 10 Hz, NOT stable
delivery, pointing drastically changed in
  
  63   23 Mar 2024, 23:12 Peter ZaldenFXEShift summaryUser experiment transient grating, Cris