| Achievements: 
	tr-RIXS at 4 mJ/cm2 for energies A, B, C, and D (pre-edge)Checked and optimized FEL alignment, t0 and overlap with PP laser after reset of machine synchronization
	Long delay scans for Peak A and C, up to 100 psProblems:
	Need to reset machine synchronization by BKR
	Camera scene got stuck, was resolved by DOC | 
| 308 | 17 Aug 2023, 11:07 | Teguh Citra Asmara, Eugenio Paris | SCS | Morning Shift Summary on 16.08.2023 | 
| Achievements: 
	Performed tr-RIXS on peak A, B, and C at 2.4 mJ/cm^2Performed tr-XAS on peak A at 3 fluencesPerformed tr-RIXS on peak A at 4 mJ/cm^2 Problems: 
	BAM delay line compensator was not working due to incorrect macro. DOC and LM fixed the issue.Delay line scan of hRIXS camera was not working as it was still configured for Viking. MT fixed the issue.The new centroiding algorithm (provided natively by the 4137 kernel) is not consistent with integration mode. For the time being, we use an older, manually configured centroiding algorithm developed for a previous user beamtime.tR-XAS results show large changes, but these large changes were not reflected in tr-RIXS. | 
| 307 | 17 Aug 2023, 11:06 | Sergii Parchenko, Manuel Harder | SCS | Night Shift Summary on 15.08.2023 | 
| Achievements: 
	Replaced focusing lens of PP laser and measured focus with knife edge, focus is about 720 micron vert. & 600 horizontal. Horizontal x-ray spot size is 220 micronAdapted fluence calibration for the new spot sizesOptimized spatial and temporal overlap with new lensPerformed optical and x-ray intensity & sample damage tests. We found that up to 15% GATT and up to 50% laser power are okay to use, without altering the sample.We started to collect hRIXS data at positive (1ps) and negative (-2ps) delays. Problems: 
	Few beam dumps.BAM scene not workingThe new (?) centroiding function produces spectra with different intensity for acquisitions with the same settings. The old algorithm seems to work well. | 
| 306 | 17 Aug 2023, 11:04 | Justine Schlappa, Le Phuong | SCS | Late Shift Summary on 15.08.2023 | 
| Achievements: 
	Set up PP laser, find spatial and temporal overlap between FEL and PP laserOptimize MCP and HAMP settings for good XAS signalFind time zero from XAS on sample and optimize for XAS delay scans at 40 deg incidence angleTake a fluence series on XAS delay scan from about 0.1 mJ/cm2 up to 2.5 mJ/cm2 Problems:Nothing of note
 | 
| 305 | 17 Aug 2023, 11:00 | Teguh Citra Asmara, Eugenio Paris | SCS | Morning Shift Summary on 15.08.2023 | 
| Achievements 
	Start cooling down the sampleAlign the beamline and deliver the beam into the samplePerformed knife edge scans and enlarge the beam horizontal size to 350 umTuned the VHM bending by checking the hRIXS resolutionPerformed energy calibration on the 1000 l/mm gratingCheck XAS and RIXS of the NdNiO3 sample at 20 K, normal incidence, and peak A Problems: 
	Nothing of note Shift Plan: 
	Check static RIXS at a few different configurationCheck damage threshold with x-ray and laserFind spatial and temporal overlap between laser and x-rayPerformed pump-probe XAS and RIXS | 
| 304 | 13 Aug 2023, 21:33 | Jayanath Koliyadu | SPB | Shift end | 
| X-ray delivery 
	9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJIssue with pulse energy stability along the pulse train in the morning but optimzed later on in the day Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 181 pulses @ from 10 Hz to564 kHz Achievements/Observations 
	Optimized Bismuth diffraciton condition on AGIPDCollected pump-probe data with Bismuth fixed targetAligned PAM and measured arrival time with electron bunch arrival time slope enabled
	
		Positive slope and V shape slope measured Issues 
	Issues with beam stability and intenisty.
	
		Optimized later on in the dayBut did not recover what we had yesterday in terms of pulse energy | 
| 303 | 12 Aug 2023, 22:50 | Jayanath Koliyadu | SPB | Shift end | 
| X-ray delivery 
	9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery Achievements/Observations 
	Installed and aligned fixed target for pump-probe measurementMeasured t0 with fixed target at IRU, scan tool to measure t0 was also testedOptimized Bimuth fixed target sample for diffraction conditionRecorded pump-probe data (30 min 1 hour)Spatial and temporal overlap of X-ray and PP laser at PAM Issues 
	Issue with homing smaract stages used in fixed target. Solved by exchanging the stages for now but need to be checked later.Difficulties in observing pump-probe signal in online data analysis although diffraction signal could be seen and optmized on the fluorescent paper on DN500 and AGIPD detector
	
		Data collected for further offline analysis | 
| 302 | 12 Aug 2023, 07:19 | Romain Letrun | SPB | Issue | 
| Potentially damaged 1.2 mm CVD in XTD2 attenuator. This feature was not present earlier in the week. | 
| 301 | 12 Aug 2023, 07:12 | Romain Letrun | SPB | Shift summary | 
| Shift summary for 11.8.2023   X-ray delivery 
	9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery Achievements/Observations 
	Continued pump-probe data collection for different delays and fluencesContinued jet automatic alignment testingFirst test of arrival time tuning with BKR Issues 
	Injector Y stage issue still persists. The reason behind the issue might be a faulty econder, the stage is now in open loop. EEE will check the issue on Monday in detail. | 
| 300 | 12 Aug 2023, 01:32 | Jörg Hallmann | MID | Shift summary | 
| 
measured various sample using the levitation device issues:during the change of the sample detector distance, the AGIPD chiller "Julabo" switch itself off and went into error - on & off procedure solved the problem and need further investigation
 | 
| 299 | 11 Aug 2023, 07:16 | Romain Letrun | SPB | Shift summary | 
| Shift summary for 10.8.2023 X-ray delivery 
	9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery Achievements/Observations 
	Increased MBK_PSLIT aperture to fully fill the mirror's apertureIssue with coordinated MKBs motion solved with the help of EEE and CTRL.PP laser was aligned to IRUEstablished temporal overlap between PP laser and X-raysContinuation of automatic jet alignment testingMeasured pump-probe data at different delays and fluences Issues 
	Injector Y stage is moving down without giving sany move command, DOC was informed. PLC experts will contact morning shift crew to investigate furtherAstigmatism of PP laser beam prevents optimal focusing of the beam at the interaction point. LAS has been informed | 
| 298 | 11 Aug 2023, 01:44 | Jörg Hallmann | MID | Shift summary | 
| alignment checks of the CRL2 device as well as the Mono - continuation of both devices together planned for tomorrowflatfelds for EPIX & AGIPD (needed to be redone because of too low intensity during the previous measurements)
 installation of the levitation device and first test measurements
   | 
| 297 | 10 Aug 2023, 22:43 | Raúl Villanueva-Guerrero | PRC | Issue | 
| Here is a capture of the observed issue with the SPB shutter the past night.   Observe the two opening/closing incidents: the first kept the shutter "OPEN" signal during 4 minutes aprox., and the second did the same for about 30 seconds.   Not clear the origin of these actions/changes on the status of the signals. | 
| 296 | 10 Aug 2023, 07:22 | Romain Letrun | SPB | Shift summary | 
| X-ray delivery 
	9.3 keV, up to 181 pulses at 564 kHz, ~1.8 mJ. Overall stable delivery. Optical laser delivery 
	800 nm, 50 fs, 564 kHz, up to 185 pulses. Overall stable delivery. Achievements/Observations 
	Tested first implementation of new automatic jet alignment device.Setup of photon arrival time monitor. Issues 
	No analog output from SPB_MKB_MVE/ACTRL/AX_FINE. Solved by EEE via DOC.Issue with MKBs coordinated motions under investigation by CTRL via DOC. Nothing obviously wrong, investigation still ongoing.SPB_OHD_SCR/MOTOR/ZOOM and SPB_OHD_SCR/MOTOR/FOCUS not working. Some parameters lost during summer maintenance period. Fixed by DOC/EEE.SPB_IRU_INJMOV/MOTOR/Y regulargly going into error state.No access to key XFEL/DESY services (elog, Redmine, etc.) for a while.SPB optics hutch shutter opened during the night, around 2:10, when we were not present causing a beam delivery interruption of about 5 minutes in SASE1/3. | 
| 295 | 10 Aug 2023, 01:31 | Jörg Hallmann | MID | Shift summary | 
| - finalized the flatfields of the AGIPD at 0.5 MHz- optimized the performance of the beam (now 850 - 950 uJ)
 - measured flatfield and darks for the Jungfrau detector
 - optimized the instrument alignment of FEL beam and ALAS to the center of rotation
 
 | 
| 294 | 09 Aug 2023, 01:42 | Jörg Hallmann | MID | Shift summary | 
| 
	after alignment of the beam, the main topic of the day were flatfields for the AGIPD with various settingscorresponding darks have been taken in addition it was challenging to generate proper flatfield intensities on the detector (1photon peak equally high as the 0photon peak) due to the low intensity (750uJ)shift crew received a warning of the machine that using the required 352 pulses for longer time could lead to an overheating of components in the machine -> flatfields were generated by using 172 pulses and sticking them together by shifting the delay | 
| 293 | 08 Aug 2023, 22:57 | Jayanath Koliyadu | SPB | Shift end | 
| X-ray delivery 
	9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on) Optical laser delivery Achievements/Observations 
	Aligned the instrument for MKB focus configurationOptimzed MKB focus and detector backgroundPCS - Collected data for about 3-4 hours with different sample concentration and crystal sizes. Issues 
	Issue with intensity slope along the pulse train (fixed later in the day)Issue with MKB combined motion (DOC informed) | 
| 292 | 06 Aug 2023, 23:20 | Sergii, Andreas | SCS | Late shift summary 06.08.2023 | 
| Achievements: -Re-alighned beam transport from the FEL soource as we seen low phon counts on the spectrometer -Optimized spectrometer at 1000l/mm grating -Made energy and curvature calibration Problems: -No major problems | 
| 291 | 06 Aug 2023, 15:55 | Ben, Justina | SCS | Morning Shift Summary | 
| Achievements 
	Moved spectrometer to 1000 ln/mm and began alignment Plan for next shift 
	Continue optimization of spectrometer with 1000 ln/mm grating Problems 
	At some point we lost signal from the spectrometer and it took some time to find itThere were several beam lossed between 12 and 13h | 
| 290 | 05 Aug 2023, 23:06 | Sergii, Andreas | SCS | Late shift summary 05.08.2023 | 
| Achievements: - Find course timing with antenna -Find find timing signla with TR_XAS on the sample -Measure XAS with laser ON and OFF to find optimal conditions for TR study -Measure TR_XAS at low T Problems: -temperature went up and the cooling was not responing to the change of needle valve. When we tweak a bit transfer line needle valve cooling starts again. |