Afternoon shift summary on 16.08.2023, posted by Teguh Citra Asmara on 17 Aug 2023, 11:08
|
Achievements:
- tr-RIXS at 4 mJ/cm2 for energies A, B, C, and D (pre-edge)
- Checked and optimized FEL alignment, t0 and overlap with PP laser after reset of machine synchronization
-
Long delay scans for Peak A and C, up to 100 ps
Problems:
-
Need to reset machine synchronization by BKR
-
Camera scene got stuck, was resolved by DOC
|
Morning Shift Summary on 16.08.2023, posted by Teguh Citra Asmara, Eugenio Paris on 17 Aug 2023, 11:07
|
Achievements:
- Performed tr-RIXS on peak A, B, and C at 2.4 mJ/cm^2
- Performed tr-XAS on peak A at 3 fluences
- Performed tr-RIXS on peak A at 4 mJ/cm^2
Problems:
- BAM delay line compensator was not working due to incorrect macro. DOC and LM fixed the issue.
- Delay line scan of hRIXS camera was not working as it was still configured for Viking. MT fixed the issue.
- The new centroiding algorithm (provided natively by the 4137 kernel) is not consistent with integration mode. For the time being, we use an older, manually configured centroiding algorithm developed for a previous user beamtime.
- tR-XAS results show large changes, but these large changes were not reflected in tr-RIXS.
|
Night Shift Summary on 15.08.2023, posted by Sergii Parchenko, Manuel Harder on 17 Aug 2023, 11:06
|
Achievements:
- Replaced focusing lens of PP laser and measured focus with knife edge, focus is about 720 micron vert. & 600 horizontal. Horizontal x-ray spot size is 220 micron
- Adapted fluence calibration for the new spot sizes
- Optimized spatial and temporal overlap with new lens
- Performed optical and x-ray intensity & sample damage tests. We found that up to 15% GATT and up to 50% laser power are okay to use, without altering the sample.
- We started to collect hRIXS data at positive (1ps) and negative (-2ps) delays.
Problems:
- Few beam dumps.
- BAM scene not working
- The new (?) centroiding function produces spectra with different intensity for acquisitions with the same settings. The old algorithm seems to work well.
|
Late Shift Summary on 15.08.2023, posted by Justine Schlappa, Le Phuong on 17 Aug 2023, 11:04
|
Achievements:
- Set up PP laser, find spatial and temporal overlap between FEL and PP laser
- Optimize MCP and HAMP settings for good XAS signal
- Find time zero from XAS on sample and optimize for XAS delay scans at 40 deg incidence angle
- Take a fluence series on XAS delay scan from about 0.1 mJ/cm2 up to 2.5 mJ/cm2
Problems:
Nothing of note |
Morning Shift Summary on 15.08.2023, posted by Teguh Citra Asmara, Eugenio Paris on 17 Aug 2023, 11:00
|
Achievements
- Start cooling down the sample
- Align the beamline and deliver the beam into the sample
- Performed knife edge scans and enlarge the beam horizontal size to 350 um
- Tuned the VHM bending by checking the hRIXS resolution
- Performed energy calibration on the 1000 l/mm grating
- Check XAS and RIXS of the NdNiO3 sample at 20 K, normal incidence, and peak A
Problems:
- Nothing of note
Shift Plan:
- Check static RIXS at a few different configuration
- Check damage threshold with x-ray and laser
- Find spatial and temporal overlap between laser and x-ray
- Performed pump-probe XAS and RIXS
|
Shift end, posted by Jayanath Koliyadu on 13 Aug 2023, 21:33
|
X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 8 - 1.3 mJ
- Issue with pulse energy stability along the pulse train in the morning but optimzed later on in the day
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ from 10 Hz to564 kHz
Achievements/Observations
- Optimized Bismuth diffraciton condition on AGIPD
- Collected pump-probe data with Bismuth fixed target
- Aligned PAM and measured arrival time with electron bunch arrival time slope enabled
- Positive slope and V shape slope measured
Issues
- Issues with beam stability and intenisty.
- Optimized later on in the day
- But did not recover what we had yesterday in terms of pulse energy
|
Shift end, posted by Jayanath Koliyadu on 12 Aug 2023, 22:50
|
X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery
Achievements/Observations
- Installed and aligned fixed target for pump-probe measurement
- Measured t0 with fixed target at IRU, scan tool to measure t0 was also tested
- Optimized Bimuth fixed target sample for diffraction condition
- Recorded pump-probe data (30 min 1 hour)
- Spatial and temporal overlap of X-ray and PP laser at PAM
Issues
- Issue with homing smaract stages used in fixed target. Solved by exchanging the stages for now but need to be checked later.
- Difficulties in observing pump-probe signal in online data analysis although diffraction signal could be seen and optmized on the fluorescent paper on DN500 and AGIPD detector
- Data collected for further offline analysis
|
Issue, posted by Romain Letrun on 12 Aug 2023, 07:19
|
Potentially damaged 1.2 mm CVD in XTD2 attenuator. This feature was not present earlier in the week. |
Shift summary, posted by Romain Letrun on 12 Aug 2023, 07:12
|
Shift summary for 11.8.2023
X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery
Achievements/Observations
- Continued pump-probe data collection for different delays and fluences
- Continued jet automatic alignment testing
- First test of arrival time tuning with BKR
Issues
- Injector Y stage issue still persists. The reason behind the issue might be a faulty econder, the stage is now in open loop. EEE will check the issue on Monday in detail.
|
Shift summary, posted by Jörg Hallmann on 12 Aug 2023, 01:32
|
measured various sample using the levitation device
issues:
during the change of the sample detector distance, the AGIPD chiller "Julabo" switch itself off and went into error - on & off procedure solved the problem and need further investigation
|
Shift summary, posted by Romain Letrun on 11 Aug 2023, 07:16
|
Shift summary for 10.8.2023
X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ
Optical laser delivery
- PP Laser, 800nm, 50 fs, up to 181 pulses @ 564 kHz and 91 pulses at 282 kHz, stable delivery
Achievements/Observations
- Increased MBK_PSLIT aperture to fully fill the mirror's aperture
- Issue with coordinated MKBs motion solved with the help of EEE and CTRL.
- PP laser was aligned to IRU
- Established temporal overlap between PP laser and X-rays
- Continuation of automatic jet alignment testing
- Measured pump-probe data at different delays and fluences
Issues
- Injector Y stage is moving down without giving sany move command, DOC was informed. PLC experts will contact morning shift crew to investigate further
- Astigmatism of PP laser beam prevents optimal focusing of the beam at the interaction point. LAS has been informed
|
Shift summary, posted by Jörg Hallmann on 11 Aug 2023, 01:44
|
alignment checks of the CRL2 device as well as the Mono - continuation of both devices together planned for tomorrow
flatfelds for EPIX & AGIPD (needed to be redone because of too low intensity during the previous measurements)
installation of the levitation device and first test measurements
|
Issue, posted by Raúl Villanueva-Guerrero on 10 Aug 2023, 22:43
|
Here is a capture of the observed issue with the SPB shutter the past night.
Observe the two opening/closing incidents: the first kept the shutter "OPEN" signal during 4 minutes aprox., and the second did the same for about 30 seconds.
Not clear the origin of these actions/changes on the status of the signals. |
Shift summary, posted by Romain Letrun on 10 Aug 2023, 07:22
|
X-ray delivery
- 9.3 keV, up to 181 pulses at 564 kHz, ~1.8 mJ. Overall stable delivery.
Optical laser delivery
- 800 nm, 50 fs, 564 kHz, up to 185 pulses. Overall stable delivery.
Achievements/Observations
- Tested first implementation of new automatic jet alignment device.
- Setup of photon arrival time monitor.
Issues
- No analog output from SPB_MKB_MVE/ACTRL/AX_FINE. Solved by EEE via DOC.
- Issue with MKBs coordinated motions under investigation by CTRL via DOC. Nothing obviously wrong, investigation still ongoing.
- SPB_OHD_SCR/MOTOR/ZOOM and SPB_OHD_SCR/MOTOR/FOCUS not working. Some parameters lost during summer maintenance period. Fixed by DOC/EEE.
- SPB_IRU_INJMOV/MOTOR/Y regulargly going into error state.
- No access to key XFEL/DESY services (elog, Redmine, etc.) for a while.
- SPB optics hutch shutter opened during the night, around 2:10, when we were not present causing a beam delivery interruption of about 5 minutes in SASE1/3.
|
Shift summary, posted by Jörg Hallmann on 10 Aug 2023, 01:31
|
- finalized the flatfields of the AGIPD at 0.5 MHz
- optimized the performance of the beam (now 850 - 950 uJ)
- measured flatfield and darks for the Jungfrau detector
- optimized the instrument alignment of FEL beam and ALAS to the center of rotation
|
Shift summary, posted by Jörg Hallmann on 09 Aug 2023, 01:42
|
- after alignment of the beam, the main topic of the day were flatfields for the AGIPD with various settings
- corresponding darks have been taken in addition
-
- it was challenging to generate proper flatfield intensities on the detector (1photon peak equally high as the 0photon peak) due to the low intensity (750uJ)
- shift crew received a warning of the machine that using the required 352 pulses for longer time could lead to an overheating of components in the machine -> flatfields were generated by using 172 pulses and sticking them together by shifting the delay
|
Shift end, posted by Jayanath Koliyadu on 08 Aug 2023, 22:57
|
X-ray delivery
- 9.3 keV, ~ 2 mJ, stable delivery except for the intensity slope along the train (fixed later on)
Optical laser delivery
Achievements/Observations
- Aligned the instrument for MKB focus configuration
- Optimzed MKB focus and detector background
- PCS - Collected data for about 3-4 hours with different sample concentration and crystal sizes.
Issues
- Issue with intensity slope along the pulse train (fixed later in the day)
- Issue with MKB combined motion (DOC informed)
|
Late shift summary 06.08.2023, posted by Sergii, Andreas on 06 Aug 2023, 23:20
|
Achievements:
-Re-alighned beam transport from the FEL soource as we seen low phon counts on the spectrometer
-Optimized spectrometer at 1000l/mm grating
-Made energy and curvature calibration
Problems:
-No major problems |
Morning Shift Summary, posted by Ben, Justina on 06 Aug 2023, 15:55
|
Achievements
- Moved spectrometer to 1000 ln/mm and began alignment
Plan for next shift
- Continue optimization of spectrometer with 1000 ln/mm grating
Problems
- At some point we lost signal from the spectrometer and it took some time to find it
- There were several beam lossed between 12 and 13h
|
Late shift summary 05.08.2023, posted by Sergii, Andreas on 05 Aug 2023, 23:06
|
Achievements:
- Find course timing with antenna
-Find find timing signla with TR_XAS on the sample
-Measure XAS with laser ON and OFF to find optimal conditions for TR study
-Measure TR_XAS at low T
Problems:
-temperature went up and the cooling was not responing to the change of needle valve. When we tweak a bit transfer line needle valve cooling starts again. |