| 
| ID | Date | Author | Group  | Subject |  | 319 | 23 Aug 2023, 22:56 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, beam intensity drop, missing last 10-20 pulses in train sometime Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz Achievements/Observations 
	Alinment for TR-SFX and PAMData collection for IHR Issues 
	Beam intensity was not that stableStrange scattering from amorphous sample and powder diffraction were appeared during data collection |  | 320 | 24 Aug 2023, 22:51 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, stable delivery Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz Achievements/Observations 
	Alinment for TR-SFXData collection in dark state and excited state at 203.5 ns Issues 
	MDL devices and macros on macrosever2 were dead around 19:30, took more than 2 hours for recovery. Dark calibration issue |  | 323 | 25 Aug 2023, 23:03 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	9.3 keV, up to 185 pulses at 564 kHz, 2.7  mJ, stable delivery Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz Achievements/Observations 
	Alinment for TR-SFX and data collection Issues 
	AGIPD vacuum gauge was in error, unplug and plug in fixed this error |  | 327 | 27 Aug 2023, 23:09 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	9.3 keV, up to 185 pulses at 564 kHz, 2.4  mJ, stable delivery Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz Achievements/Observations 
	Alinment for TR-SFX and data collection Issues 
	Nozzles were clogged a lot, crystals were formed on catcher cone. |  | 329 | 28 Aug 2023, 23:03 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	9.3 keV, up to 185 pulses at 564 kHz, 2.3  mJ, stable delivery Optical laser delivery 
	PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz Achievements/Observations 
	Alinment for TR-SFX and data collection Issues 
	Karabo did not work sometime, lost more than 1 hours |  | 341 | 13 Sep 2023, 02:18 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	0.5 mj, improved to 1.1 mj xray energy in the evening Optical laser delivery 
	50 fs, 860 nm as fundamental wavelength, 188 kHzns for illumination, Achievements/Observations 
	Aligned the instrument to 9.3 keVAligned the PPL laserTime zero PPLMeasured sample, dark runs, including testing different sample conditions (filtered vs not filtered or lower cutoff)Measured TR-SFX Issues 
	Low xray energy, BKR improved it afternoon, from 0.5 to 1.1 mj, hopefully we could still get better the following daysPP-laser AMPHOS issuesThe focus at IRU in the evening had issues, we had to redo the alignment partially. We also had to ask BKR to improve the beam alignment at FEL imager. |  | 342 | 14 Sep 2023, 00:05 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	1.1 mj, 564 kHz, 93 pulses, stable delivery Optical laser delivery 
	50 fs, 860 nm as fundamental wavelength, 188 kHzns for illumination, Achievements/Observations 
	Lots of data collection for TR-SFXTried many samples and optimazation Issues 
	Beam fluctuation aorund 23 : 00Low hit rate. tried to improve, better than before. |  | 344 | 14 Sep 2023, 23:03 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	1.1 mj, 564 kHz, 93 pulses, stable delivery Optical laser delivery 
	50 fs, 860 nm as fundamental wavelength, 188 kHzns for illumination, Achievements/Observations 
	Lots of data collection for TR-SFX Issues 
	Sample was accumulated on catcher and strong diffraction was observed, need to vent chamber and clean it, but it happned end of beamtime, we decided to finish experiment  |  | 345 | 15 Sep 2023, 14:54 | Chan Kim | SPB | Issue |  | Vacuum issue at XTD2 tunnel which might be triggered by SA1_XTD2_ATT Arm5 (1.2mm thick CVD diamond) It happened once again at around 3pm. |  | 348 | 20 Sep 2023, 02:09 | Jayanath Koliyadu | SPB | Shift end |  | X-ray delivery 
	7 keV, 2.1 mJ, stable delivery Optical laser delivery Achievements/Observations 
	M1, M2 pre alignment for this weeks beamtimeChecked the beam trajectory through MKB mirrors after stripe change Issues 
	It seems that with wider funnel for the catcher, the YAG is not reaching the X-ray beam   Note: At 7 keV with 100 pulses, and full beam we were at 2.2 W average power. |  | 353 | 22 Sep 2023, 07:27 | Raphael de Wijn | SPB | Shift summary |  | X-ray delivery 
	7 keV, 202 pulses, 564 kHz, ~1.3 mJ, stable delivery Optical laser delivery Achievements/Observations 
	Collected a few NQO1 runs (no mixing) in Adaptive and FixedMG with the Ros setup, good diffractionDifficult to reach droplet synchronisation |  | 355 | 23 Sep 2023, 07:04 | Adam Round | SPB | Shift end |  | Staff:JK, RDW, AR X-ray delivery 
	7 keV 202 pulses 1.7mJ stabel across train and throughout the shift Optical laser delivery Achievements/Observations 
	faster changover and alignmentalmost 6 hours of data aquisition - many good hits observedstrong diffraction in Hits required transmission to be reduced to 34% Issues 
	maintaining synchronnisation for droplet overlap proved difficult effective hit rate of 0.3% observedhits observed in beats as timing passed though overlap quite often - some periods where we could see hits in nearly every train but this could not be maintained. |  | 364 | 24 Sep 2023, 07:28 | Raphael de Wijn | SPB | Shift summary |  | X-ray delivery 
	7 keV 202 pulses 1.6mJ stabel across train and throughout the shiftBeam down at 7am again, power glitch same as yesterday Achievements/Observations 
	faster changover and alignmentYAG on nozzle workedcollected data the droplets in oil sample delivery method - many good hits observedstill working on the synchronisation with the x-ray pulses |  | 369 | 27 Sep 2023, 07:24 | Romain Letrun | SPB | Shift summary |  | Shift summary for 26.9.2023 X-ray delivery 
	6.3 keV, ~4 mJ, 1-352 pulses at 1.13 MHzGreat performance and stable delivery with few minor interruptions Optical laser delivery Achievements/Observations 
	Aligned MKB trajectory to 1.5m detector distance configuration
	
		Some work can still be done on the backgroundScattering laser setupA few runs with silver cubes taken at the end, with some time borrowed from FXEGood focus with MKB B4C strip Issues 
	Optical laser not availableHistorical data from some devices unavailable in Karabo. Solved by DOC |  | 371 | 28 Sep 2023, 07:20 | Romain Letrun | SPB | Shift summary |  | Shift summary for 27.9.2023 X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, delivered from 9:45 on and was stabilizing over the dayns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Aligned MKB trajectory and optimzed backgroundScattering laser aligned with X-rays references and overlaped with particle beamFew runs with sucrose while trying to optimize injection Issues 
	PP laser was still drifting in energy and pointing, better stabilized towards the end of the shiftDifficulties with injection, tried sevral times and did not improve muchSlope in pulse energy along the pulse train, up to 40% change from first to last pulseSignificant background AGIPD after correcting beam trajectory |  | 373 | 29 Sep 2023, 08:30 | Romain Letrun | SPB | Shift summary |  | Shift sumary for 29.9.2023   X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Solved the issues with sampel injectionCollected data without laser for 1 to 2 hoursPP laser coarse timing Issues 
	Issues with injection, solved later in the shiftDifficulties to find fine timingIssue with migrating data to offline cluster, solved by DOC |  | 375 | 29 Sep 2023, 23:13 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Solved the issues with sampel injectionCollected data with laser 30 minPP laser time zero aligned Issues 
	IRU_Slit4 was in position to the beamIt took time to aling all slits to reduce the scattering in low q |  | 376 | 30 Sep 2023, 10:11 | Romain Letrun | SPB | Issue |  | On multiple occasions this morning, the number of bunches was reduced to 1 without actions from our side. Looking at the history of SA1_XTD2_BUNCHPATTERN/MDL/CONFIGURATOR, we noticed changes were applied by this device, presumably originating from one of the watchdogs in SA1. This kind of silent changes is particularly inconvenient and could be easy to miss if one is not constantly monitoring that the number of bunches remains the same. Given that there are dozens of watchdogs in SA1, it is at best cumbersome and time consuming to track the origin. Finding the origin of the restriction needs to be made easier. |  | 377 | 30 Sep 2023, 23:08 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 352 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Several tens of datasets were collected using two different laser polarization (0 degree and 45 degree)During the data collections PP laser phase shifter delay scans were used.PP laser time aligned to zero and spatial overlapped was checked. Issues 
	The cross talks between SASE-1 and SASE-2 was more than it expected.Beam position, pulse energy as well as intra-train pulse energy were varrying. (BKR managed to solved it before the evening) |  | 380 | 01 Oct 2023, 23:06 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 352 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Lots of datasets were collected using two different laser polarization (0 degree and 45 degree)During the data collections PP laser phase shifter delay step scans were used.PP laser time aligned to zero and spatial overlapped was checked. Issues |  |