| ID | Date | Author | Group | Subject |  | 389 | 14 Oct 2023, 09:48 | Frederik Wolff-Fabris | PRC | Status |  | Machine went down overnight (4AM and 6AM) and could not be properly restarted by BKR. Ongoing tuning is proceeding with RC onsite since 6AM; Instruments are informed and in direct contact to BKR. Status 09:45AM: SA1 ~3mJ; SA2: ~500uJ; SA3 being restarted Status 11:10AM: Beam restored in all SASEs; SA1 delivery from 10AM; SA2 delivery from 11:10; SA3 delivery from 10:45 |  | 388 | 14 Oct 2023, 04:04 | Chan Kim | SPB | Shift summary |  | X-ray delivery 
	7.8 keV, up to 260 pulses at 1.1MHz, ~3 mJ Optical laser delivery 
	PP laser, stable delivery Achievements/Observations 
	NKB focus optimized with reduced PSLIT (both MKB and EHU) openingFound the orgin of the BG (mostly from AGIPD gun shield)Stable AGIPD operation Issues 
	Beam slitting with PSLITs & IRU_SLITs does not help in reducing the BG from the AGIPD Gun-shieldPlacing additional Pb shield on the injector tip does not help (BG source is in between injector and AGIPD) |  | 387 | 13 Oct 2023, 10:19 | Theophilos Maltezopoulos | XPD | Issue |  | An XGM has two single-shot detectors, XGMD and HAMP. The XTD2 XGMD amplifiers are damaged, thus I operate the XTD2 XGM with HAMP, which I usually use at > 18 keV. In summary, the XTD2 XGM is fully operational, but I do not have a spare detector any more! Thus, a ZZ is organized for Monday 16.10. around 12:00 and Joakim and I will exchange the damaged amplifiers. |  | 386 | 13 Oct 2023, 07:06 | Chan Kim | SPB | Shift summary |  | X-ray delivery 
	7.8 keV, up to 260 pulses at 1.1MHz, >4 mJ Optical laser delivery 
	PP laser was down since 00:48. Achievements/Observations 
	NKB focus optimized and beam cleaning partially doneDamaged IRU slit-4 has been rearranged and replacedStable AGIPD operation Issues 
	Beam on AGPID seems still too big and beam cleaning did not really work (we may need to close PSLITs during the next shift)IRU_SLITs are too close to the X-ray beam and one blade in IRU_SLIT-4 was damaged by X-ray~10 pixels in Q2M1 overexposedSA1 PPL Amphos down since 00:48 |  | 385 | 12 Oct 2023, 02:00 | Tokushi Sato |  | Shift summary 11.10.2023 |  | Staff: JK, CK, KL, AS X-ray delivery 
	8.4 keV, up to 260 pulses at 1.1MHz, 3.5 mJ Optical laser delivery Achievements/Observations 
	Direct beam path confirmed (MKB_MVP supporting structure issue)NKB focus optimizedTwo power slits (MKB_PSLIT and EHU_PSLIT) optimized Issues 
	7.8 keV is not reachable due to limited motion of undulator gap; 8.4 keV, the used X-ray energy, corresponds to 11mm SA1 undulator gapAGIPD chiller issue not solved. Instrument status 
	AGIPD HV off.AGIPD's Chiller is off.AGIPD gate valve closed and pinned.Attenuators set to thickest diamond. To do for next shift 
	If possible, fix AGIPD ciller issueIf AGIPD will be available, install mirrors for PP laser and continue IHR program |  | 384 | 11 Oct 2023, 06:22 | Abhisakh Sarma | SPB | Shift summary |  | X-ray delivery 
	7.8 keV, up to 30 pulses at 94 kHz, 3 mJ Optical laser delivery Achievements/Observations Issues 
	AGIPD's asics interlocked several times. Marcin was informed and he tried to solve the issue remotely but did not work.Marcin observed that the AGIPD's chiller temperature was increasing since afternoon and not going down below -16 degree. Probablly the chiller is no longer at proper state. Macrin was onsite and tried to solve the issue without success. Informed to detector groupDifficulties with alignment of direct beam path until NKB |  | 383 | 03 Oct 2023, 22:58 | Harald Sinn | XRO | Shift end |  | End of Euler shift: all 3 SASE2 mirrors are now working with the Euler MDL. We left the beamline aligned to HED, with M1,M2 on Pt for upcoming HED experiment at 18 keV. Pre-absorber closed, CRL1 out, Solid attenuater with some diamonds. |  | 382 | 03 Oct 2023, 22:51 | Antje Trapp | XRO | Euler calibration and Mirror setpoints |  | euler MDL was calibrated for all three mirrors. Optics setpoints saved in XRO setpoints for MID and HED   |  | 381 | 02 Oct 2023, 21:48 | Antje Trapp | XRO | M3 vertical motors calibration - EulerMDL |  | Second iteration and sanitty test for vertical mirror motion (Y) and vertical beam alignment (ROLL) Vertical motors were calibrated and offsets saved in Euler MDL (no calibration of motors done so far - this should be performed during ramp up after WMP) Calibration values are Rz=-8.7805 Ty=-4.11 Rx=-4.53 PITCH=8.58 ROLL=4.2063 Residual horizontal parasitic motion is within 2urad for M3 - for vertical beam alignment, the residual horizontal parasitic motion is even less. With Euler MDL, mirror can now be moved and the beam will mostly stay on the experiment screen. Setpoints for HED set in XRO setpoints 'B' (8.8keV B4C)   |  | 380 | 01 Oct 2023, 23:06 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 352 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Lots of datasets were collected using two different laser polarization (0 degree and 45 degree)During the data collections PP laser phase shifter delay step scans were used.PP laser time aligned to zero and spatial overlapped was checked. Issues |  | 379 | 01 Oct 2023, 14:48 | Giuseppe Mercurio | SCS | Morning shift summary |  | # Morning shift summary Giuseppe, Martin * achievements- continued tr-RIXS measurements
 - good beam conditions
 - added new alarms to give warning if parameters are wrong for certain measurement type
 - created new karabo device to calculate the fluence and train-averaged pulse energy in nJ from pulse-resolved HAMP values (see new scene in Main)
 * problems- none
 |  | 378 | 01 Oct 2023, 02:00 | Johannes Moeller | MID | Shift summary |  | 
HXRSS at 8.8 keV, 1, 60 or 350 pulses. Quite stable seeding performance 
	loaded new sample (HGW) in the morningmeasured full temperature series on HGW during the dayproblem with vacuum in the cryostat-chamber, which triggered the interlocked during the data taking and blocked AGIPD for some temperaturesfocussing optimized in the evening and relaxing the bender, with 2-3 times better contrast determined. Please don’t touch CRL2 from now.loaded new sample in the evening, but insufficient vacuum in the user chamber prevents opening the valve to the AGIPD first |  | 377 | 30 Sep 2023, 23:08 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 352 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Several tens of datasets were collected using two different laser polarization (0 degree and 45 degree)During the data collections PP laser phase shifter delay scans were used.PP laser time aligned to zero and spatial overlapped was checked. Issues 
	The cross talks between SASE-1 and SASE-2 was more than it expected.Beam position, pulse energy as well as intra-train pulse energy were varrying. (BKR managed to solved it before the evening) |  | 376 | 30 Sep 2023, 10:11 | Romain Letrun | SPB | Issue |  | On multiple occasions this morning, the number of bunches was reduced to 1 without actions from our side. Looking at the history of SA1_XTD2_BUNCHPATTERN/MDL/CONFIGURATOR, we noticed changes were applied by this device, presumably originating from one of the watchdogs in SA1. This kind of silent changes is particularly inconvenient and could be easy to miss if one is not constantly monitoring that the number of bunches remains the same. Given that there are dozens of watchdogs in SA1, it is at best cumbersome and time consuming to track the origin. Finding the origin of the restriction needs to be made easier. |  | 375 | 29 Sep 2023, 23:13 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Solved the issues with sampel injectionCollected data with laser 30 minPP laser time zero aligned Issues 
	IRU_Slit4 was in position to the beamIt took time to aling all slits to reduce the scattering in low q |  | 374 | 29 Sep 2023, 22:59 | Laurent Mercadier | SCS | Shift summary |  | # Late shift summary 29.09.2023 Laurent, Phuong## Achievements
 - Continue tr-RIXS
 - Laser fluence scan
 - Check PPL 266 nm power
 - Setup DAMNIT
 ## Problems:- online analysis not displayed on gui1 server fixed by DOC
 ## Plan for the night:- continue tr-RIXS
 - monitor energy and position drifts
 |  | 373 | 29 Sep 2023, 08:30 | Romain Letrun | SPB | Shift summary |  | Shift sumary for 29.9.2023   X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, stable deliveryns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Solved the issues with sampel injectionCollected data without laser for 1 to 2 hoursPP laser coarse timing Issues 
	Issues with injection, solved later in the shiftDifficulties to find fine timingIssue with migrating data to offline cluster, solved by DOC |  | 372 | 29 Sep 2023, 00:35 | Johannes Moeller | MID | Shift summary |  | 
1, 60 and 350 pulses at 8.7keV, HXRSS *focus characterization CRL2 lens 3,5,6*Si 20nm XPCS with 20 and 50 pulses to evaluate the contrast
 *damage and dynamic studies on HGW with 1 and 350pulses and different attenuation and different temperatures
 HXRSS tuning is ongoing during the night, we leave the beam on the MID spectrometer and the zoom session open for tuning.
 |  | 371 | 28 Sep 2023, 07:20 | Romain Letrun | SPB | Shift summary |  | Shift summary for 27.9.2023 X-ray delivery 
	6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz Optical laser delivery 
	PP laser, 1030 nm, 226 pulses at 1.1 MHz, delivered from 9:45 on and was stabilizing over the dayns laser for rayleigh scattering, stabe delivery Achievements/Observations 
	Aligned MKB trajectory and optimzed backgroundScattering laser aligned with X-rays references and overlaped with particle beamFew runs with sucrose while trying to optimize injection Issues 
	PP laser was still drifting in energy and pointing, better stabilized towards the end of the shiftDifficulties with injection, tried sevral times and did not improve muchSlope in pulse energy along the pulse train, up to 40% change from first to last pulseSignificant background AGIPD after correcting beam trajectory |  | 370 | 27 Sep 2023, 07:51 | Benjamin van Kuiken | SCS | SCS Night Shift Summary |  | Achievements 
	Characterized optical laser spot at sample Problems 
	FEL beam had very unstable intensity and spectrum. As a result no useful data could be collected during the night
	
		FEL pointing seemed to be stable on all tunnel imagers. The issue was communicated to BKR, and they said that things looked fine from there perspective.Large fluctuations in spectral distrubtion at SCS spectrometer were observed. See video at https://syncandshare.xfel.eu/index.php/s/emtwonCsQJJqpz6Oth-order beam on SCS pop-in showed large intensity fluctuations with ~50% of the time showing no beam at all |  |