  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 4 of 24  Not logged in ELOG logo
ID Date Author Group Subjectdown Text Attachments
  1   16 Jan 2023, 11:33 Theophilos MaltezopoulosXPDStatusI started the upstream XGMs in XTD2, XTD1,
and XTD10.
  
  7   23 Jan 2023, 10:43 Jan GruenertPRCStatusStatus of machine SASE tuning
(just before switching off for monday maintenance):

 JG_2023-01-23_um_10.04.56.png 
  26   11 Feb 2023, 13:55 Andreas GallerPRCStatusGun Modulator Problems

Gun Trip at 11:23 and since then
the Modulator trips after each restart.
  
  100   23 Mar 2023, 13:07 Naresh KujalaXPDStatusUpdate for elog 99:

Now Gotthard timing is changed
to new setting for 0.5 MHz.
 Screenshot_from_2023-03-23_13-04-58.pngScreenshot_from_2023-03-23_13-17-05.png 
  101   23 Mar 2023, 14:31 Romain LetrunSPBStatusAfter SASE1 HIREX GOTTHARD reconfiguration,
we now get a single pulse per frame. This
was verified by comparing data from HIREX
 20230323_HIREX_integral2.png20230323_HIREX_mean_spectrum2.png20230323_HIREX_peaks2.png 
  104   24 Mar 2023, 19:42 Naresh KujalaPRCStatusReply to elog103:

Spoke with Machine RC Thomas Wamsat
and SQS.
  
  109   26 Mar 2023, 13:26 Naresh KujalaPRCStatusMachine RC Raimond informed PRC that
there is an issue with the A4 module that
needs to fix to have a continuous operation.
  
  169   03 May 2023, 13:01 Jan GruenertPRCStatusThe machine tuning over the night had not
yet accomplished fully satisfactory beam
conditions mainly at the high photon energies
 JG_2023-05-03_um_13.10.33.png 
  226   05 Jun 2023, 08:28 Naresh KujalaPRCStatus- SA2 photon beamline

Today morning found the CRL1: 5
and 6 arm and Pop-in 45-I are still IN. I
 SA2_Main-Status_05-06-23.PNG 
  227   06 Jun 2023, 08:28 Naresh KujalaXPDStatusSA2 photon beamline

- SRA position were 7 mm x
7 mm, MID reported they see the hallow of
 SRA-Before_changing_1.PNGSRA-after_changing.PNG 
  242   10 Jun 2023, 21:52 Jan GruenertPRCStatusThe Cryo team solved the problems, beam
is back.
Downtime from 17h59 until 21h03.
 JG_2023-06-10_um_21.55.46.png 
  257   16 Jun 2023, 11:42 Abhisakh SarmaSPBStatusBeam is back at around 11:30 pm

We lost 1 hr 30 min of beam time.(it
was promised to get back at around 10:00
 Screenshot_from_2023-06-16_11-41-39.png 
  273   23 Jul 2023, 17:28 Frederik Wolff-FabrisPRCStatusPhoton Activities by XPD colleagues
in SA3 are concluded on Sunday 23.07 at 17:00.
The photon commissioning activities are concluded
  
  274   25 Jul 2023, 19:18 Harald SinnPRCStatusAfter the 12 hour cryo failure last night,
it was decided to exchange a faulty window
with some reduced transmission at the
  
  276   28 Jul 2023, 14:46 Harald SinnPRCStatusAs discussed, there will be a beam interuption
form 14:45 until probably 15:45 related to
jitter studies at A1 that the BKR would like
  
  278   28 Jul 2023, 15:37 Harald SinnPRCStatusGood news: The 'jitter'-tests was
sucessful and BKR could identify the jitter
source related to a wrong software setting
  
  317   22 Aug 2023, 18:15 Naresh KujalaPRCStatusPhoton beam delivery status:

- Machine informed that beam will
be handover to instruments SA1 (SPB/SFX)
  
  325   26 Aug 2023, 08:23 Naresh KujalaPRCStatus- Machine updates;

Saturday 1:30 hr Cold compressor
failed. The initial estimation of downtime
  
  326   26 Aug 2023, 18:02 Naresh KujalaPRCStatusDear All,

Two
important machine updates.
  
  338   09 Sep 2023, 07:54 Naresh KujalaPRCStatusInfo from MRC (Lars)

-----------------------------------------------------------------------------

The cryo crew reports that the
  
ELOG V3.1.4-7c3fd00