Issue, posted by Thomas Preston on 24 Oct 2023, 19:26  
 | 
Vacuum issue at HED
 
 
At 18:26 the vacuum failed in the HED CRL3 chamber in the OPTs hutch. The vacuum failed in the section and tripped the valves in the OPT hutch; 
it went from 1e-8 to 5 mbar in seconds. The leak is confined to the CRL chamber -- the sections upstream and downstream are not compromised and still have | 
 
 
Night shift summary, 23.10.2023, posted by Laurent Mercadier on 23 Oct 2023, 06:46 
 | 
 
 
 
 | 
 
 
Shift summary, posted by Raphael de Wijn on 23 Oct 2023, 05:15 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
 
	Beam down from 10:30 to 19:00.
 
 
 
Optical laser 
delivery | 
 
 
Late shift summary 22.10.2023, posted by Sergii , Giacomo on 23 Oct 2023, 01:38 
 | 
Achievements
 
-Check XAS and static RIXS after the beam was back
 
-Do the warm up cycle to remove ice from the sample surface | 
 
 
Shift summary, posted by Alexey Zozulya on 23 Oct 2023, 01:10 
 | 
Milestones:
 
*Finish measurement program on the STO sample at room temperature
 
*Check mono fpitch and energy rocking curve | 
 
 
Shift summary, posted by Benjamin van Kuiken on 22 Oct 2023, 13:21 
 | 
Morning shift Summary 22.10.2023
 
 
Achievements
 
 
 
	Checked beam alignment and overlap
 
	
 
	confirmed sample integrity with static rixs on other sample locations
 
	Problems | 
 
 
night shift summary, 22.10.2023, posted by Laurent, Phuong on 22 Oct 2023, 07:34 
 | 
 
Night shift summary 22.10.2023
 
 
Laurent, Phuong
 
Achievement:
 
-Collecting static RIXS data at different FEL repitition rates | 
 
 
Shift summary, posted by Raphael de Wijn on 22 Oct 2023, 00:27 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
 
	Beam down until around 1PM.
 
	After agreement with FXE, we could 
collect data until midnight.
 
 
 
Optical laser delivery | 
 
 
Late shift summary 21.10.2023, posted by Sergii, Giacomo on 21 Oct 2023, 23:34 
 | 
Achievements:
 
-Collecting TR-RIXS data for different fluencies and delay range
 
Problems | 
 
 
Shift Summary, posted by Benjamin van Kuiken on 21 Oct 2023, 15:34 
 | 
# Morning Shift Summary 21.10.23
 
 
Ben, Eugenio
 
 
Achievements | 
 
 
Night shift summary 21.10.2023, posted by Laurent, Phuong on 21 Oct 2023, 06:30 
 | 
Night shift summary 21.10.2023
 
 
Achievements
 
 
 
	Found T0 on SiN, but the response is very slow (~10 ps).
 
	Azimuth (phi) scan
 
	Start of theta scan with optimized 
phi
 
 
 
Problems | 
 
 
Late Shift Summary on 20.10.2023, posted by Sergii, Giacomo on 20 Oct 2023, 23:22 
 | 
 
Late shift summary 20.10.2023
 
 
Achievements
 
-Switched AFS to burst mode
 
-Characterized PPL beam size | 
 
 
Shift summary, posted by Romain Letrun on 20 Oct 2023, 23:10 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
 
	Beam down at 22:47, not recovered before the end of the shift. Otherwise 
stable delivery.
 
 
 
Optical laser delivery | 
 
 
Morning Shift Summary, posted by Benjamin van Kuiken on 20 Oct 2023, 15:22 
 | 
Achievements
 
 
 
	Tested MCPs and APD for XAS
 
	
 
		Both MCPs give a good XAS spectrum with no amplification, but small MCP requires higher bias 
voltage
 
		No fluorescence signal observed on the APD
 
	
 
	
 
	Measured XAS of both samples
 
	Measured static RIXS | 
 
 
Shift end, posted by Jayanath Koliyadu on 19 Oct 2023, 23:30 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz
 
 
 
Optical laser delivery
 
 
 
	PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h
 
 
 
Achievements/Observations | 
 
 
Shift summary, posted by Raphael de Wijn on 18 Oct 2023, 23:19 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.8 mJ and up to 352 pulses at 1.1 MHz
 
 
 
Optical laser delivery
 
 
 
	PP laser, amphos laser computer in error for ~2h
 
 
 
Achievements/Observations | 
 
 
Shift summary, posted by Alexey Zozulya on 18 Oct 2023, 02:09 
 | 
Shift summary (p4239)
 
Achievements:
 
- HXSS beam at 10.5 keV at 400 uJ pulse energy | 
 
 
Shift summary, posted by Raphael de Wijn on 17 Oct 2023, 23:23 
 | 
X-ray delivery
 
 
 
	13.6 keV, ~1.6 mJ and up to 202 pulses at 0.5 MHz
 
 
 
Optical laser delivery
 
 
 
	PP laser, stable delivery
 
 
 
Achievements/Observations | 
 
 
Experiment summary, posted by Konopkova Zuzana on 16 Oct 2023, 05:05 
 | 
Beam parameters: 18.8 keV, 350-600 uJ, 1 pulse
 
 
Experiment: Shock compression experiments using DiPOLE 70 J + XRD
 
 
- run through most of the users targets, largely succesful | 
 
 
Shift summary, posted by Konopkova Zuzana on 15 Oct 2023, 04:43 
 | 
 
	the initial 600-700 uJ of pulse energy at the beginning of the user beamtime dropped down to 300-350 uJ over night from 14th to 15th. The operators 
did not seem to be able to bring the pulse energy above 500 uJ, which is where it was after the RC's intervention in the morning. Is it possible to 
bring up the energy in the morning?
 
 |