|  Issue, posted by Thomas Preston on 24 Oct 2023, 19:26   | 
| Vacuum issue at HED At 18:26 the vacuum failed in the HED CRL3 chamber in the OPTs hutch. The vacuum failed in the section and tripped the valves in the OPT hutch; it went from 1e-8 to 5 mbar in seconds. The leak is confined to the CRL chamber -- the sections upstream and downstream are not compromised and still have good vacuum. Therefore we believe the leak to be in one of the bellows of the CRL arms. This needs to be investigated tomorrow by the technicians. The late shift is cancelled since we cannot continue with lens alignment. The night shift may continue with work on the DiPOLE laser - up to them. BKR is informed that they may use the time for tuning. | 
|  Night shift summary, 23.10.2023, posted by Laurent Mercadier on 23 Oct 2023, 06:46 | 
|   06:45 
Night shift summary, 23.10.2023Phuong, Laurent Achievements 
	Aligned over doped sample Problems | 
|  Shift summary, posted by Raphael de Wijn on 23 Oct 2023, 05:15 | 
| X-ray delivery 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.Beam down from 10:30 to 19:00. Optical laser delivery 
	800 nm, 50 fs, 1 to 176 pulses at 564 kHz pumping TOPAS at 475 nm.Stable delivery. Achievements/Observations 
	PP laser and X-ray spatial and timing overlap.Collected data for ~7.5h.Very stable sample delivery. | 
|  Late shift summary 22.10.2023, posted by Sergii , Giacomo on 23 Oct 2023, 01:38 | 
| Achievements-Check XAS and static RIXS after the beam was back
 -Do the warm up cycle to remove ice from the sample surface
 -Check coarse timing after the beam drop
 Problems
 -Could not see the fine timing signal so far
 | 
|  Shift summary, posted by Alexey Zozulya on 23 Oct 2023, 01:10 | 
| Milestones:*Finish measurement program on the STO sample at room temperature
 *Check mono fpitch and energy rocking curve
 *Darks for AGIPD and JF
 *take out mono, CRLs etc from the tunnel
 Beam delivery: *Beam was not available from 11:30 to 19:30. Returned to good conditions back at  ~2mJ, 10.5keV, 15bunches   | 
|  Shift summary, posted by Benjamin van Kuiken on 22 Oct 2023, 13:21 | 
| Morning shift Summary 22.10.2023Achievements | 
|  night shift summary, 22.10.2023, posted by Laurent, Phuong on 22 Oct 2023, 07:34 | 
| 
Night shift summary 22.10.2023Laurent, PhuongAchievement:
 -Collecting static RIXS data at different FEL repitition rates
 -Continue collecting TR-RIXS data for different fluences
 Problems
 -No major problems
 | 
|  Shift summary, posted by Raphael de Wijn on 22 Oct 2023, 00:27 | 
| X-ray delivery 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.Beam down until around 1PM.After agreement with FXE, we could collect data until midnight. Optical laser delivery 
	800 nm, 50 fs, 1 to 176 pulses at 564 kHz pumping TOPAS at 475 nm.PP laser down for ~4h. Facility cooling water for the AMPHOS chiller was down, solved by LAS and TS OCD (controller had to be replaced). Achievements/Observations 
	PP laser and X-ray spatial and timing overlap.Collected pump-probe data ~1.5h until PP laser down, then dark data on a different sample and then again ~1.5h pump-probe at the end of the shift Issues 
	Beam down in the morning.PP laser down in the evening. | 
|  Late shift summary 21.10.2023, posted by Sergii, Giacomo on 21 Oct 2023, 23:34 | 
| Achievements:-Collecting TR-RIXS data for different fluencies and delay range
 Problems
 -No major problems
 | 
|  Shift Summary, posted by Benjamin van Kuiken on 21 Oct 2023, 15:34 | 
| # Morning Shift Summary 21.10.23 Ben, Eugenio Achievements* Found maximum of CDW with theta scan
 * set up for time-resolved measurements
 Problems* FEL was down most of the shift due. Beam delivered around 12:30
 | 
|  Night shift summary 21.10.2023, posted by Laurent, Phuong on 21 Oct 2023, 06:30 | 
| Night shift summary 21.10.2023Achievements 
	Found T0 on SiN, but the response is very slow (~10 ps).Azimuth (phi) scanStart of theta scan with optimized phi Problems 
	Even after finding T0 on SiN, still could not find T0 on sample with XASBeam down at 5:25 | 
|  Late Shift Summary on 20.10.2023, posted by Sergii, Giacomo on 20 Oct 2023, 23:22 | 
| 
Late shift summary 20.10.2023Achievements-Switched AFS to burst mode
 -Characterized PPL beam size
 -Found coarse timing
 -Working on fine timing with TR_XAS
 Problems
 -SCS_XGM data recorded with some mismatch that the run could not be loaded for an offline analysis with XGM. Other channels are fine.
 | 
|  Shift summary, posted by Romain Letrun on 20 Oct 2023, 23:10 | 
| X-ray delivery 
	13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.Beam down at 22:47, not recovered before the end of the shift. Otherwise stable delivery. Optical laser delivery 
	800 nm, 50 fs, 1 to 176 pulses at 564 kHz pumping TOPAS at 475 nm.Intensity modulations through the burst during the second half of the day. Solved by LAS OCD. Otherwise stable delivery. Achievements/Observations 
	Remounting of diagnostics stack under the injector.PP laser and X-ray spatial and timing overlap.Collected data from noon until beam down towards the end of the shift. Issues 
	Discrepancies between delay calculated by OpticalDelay device and motor encoder position appearing from time to time.Karabo GUI crashed twice when after pressing enter while editing a table. | 
|  Morning Shift Summary, posted by Benjamin van Kuiken on 20 Oct 2023, 15:22 | 
| Achievements 
	Tested MCPs and APD for XAS
	
		Both MCPs give a good XAS spectrum with no amplification, but small MCP requires higher bias voltageNo fluorescence signal observed on the APDMeasured XAS of both samplesMeasured static RIXS of under-doped sample Problems Plan for next shift 
	Sample alignment (half clip+diffraction)Switch AFS laser to burst mode and find timing | 
|  Shift end, posted by Jayanath Koliyadu on 19 Oct 2023, 23:30 | 
| X-ray delivery 
	13.6 keV, ~1.7 mJ and up to 352 pulses at 1.1 MHz Optical laser delivery 
	PP laser, 1 to 202 pulses, stable delivery except for the down time of ~1h Achievements/Observations 
	user sample data collected for ~1.5hPP laser timing scans donenew adapter for the screens holder designed, machined and installed Issues 
	sample was growing on the adapter, preventing data collectionnew adapter is too far downstream, partially shadowing sample diffraction on the lower corners of the detectorPP laser down for ~1h | 
|  Shift summary, posted by Raphael de Wijn on 18 Oct 2023, 23:19 | 
| X-ray delivery 
	13.6 keV, ~1.8 mJ and up to 352 pulses at 1.1 MHz Optical laser delivery 
	PP laser, amphos laser computer in error for ~2h Achievements/Observations 
	x-ray beam aligned and focusedPP laser optimization doneAGIPD background reduced to 1-2 photons diffuse scattering Issues 
	Beam down ~2hPP laser down for ~2hAGIPD tripped due to pressure spike, currently all off | 
|  Shift summary, posted by Alexey Zozulya on 18 Oct 2023, 02:09 | 
| Shift summary (p4239)Achievements:
 - HXSS beam at 10.5 keV at 400 uJ pulse energy
 - MID beam alignment to DES
 - aligned DES spectrometer for C220 reflection on Gotthard and flight path;
 Issues:
 -    Seeding crystal was stuck in parked position and could not be inserted back (late evening); to be investigated via ZZ access tomorrow
 | 
|  Shift summary, posted by Raphael de Wijn on 17 Oct 2023, 23:23 | 
| X-ray delivery 
	13.6 keV, ~1.6 mJ and up to 202 pulses at 0.5 MHz Optical laser delivery 
	PP laser, stable delivery Achievements/Observations 
	User sample delivery testedM1 and M2 alignedx-ray beam aligned and focusedPP laser spatial and temporal alignment doneAGIPD background reduction to be optimized: still one photon diffuse scattering and ten photons scattering on the top right quadrant | 
|  Experiment summary, posted by Konopkova Zuzana on 16 Oct 2023, 05:05 | 
| Beam parameters: 18.8 keV, 350-600 uJ, 1 pulse Experiment: Shock compression experiments using DiPOLE 70 J + XRD - run through most of the users targets, largely succesful - photon delivery very stable on Sunday until Monday morning - the beam went down on Monday 6am for an hour but got an extra hour until 8am, which is appreciated   Issues: - HED XGM stopped showig controlData.slowTrain from about 4:30 AM. There seems to be some problem with the fast data | 
|  Shift summary, posted by Konopkova Zuzana on 15 Oct 2023, 04:43 | 
| 
	the initial 600-700 uJ of pulse energy at the beginning of the user beamtime dropped down to 300-350 uJ over night from 14th to 15th. The operators did not seem to be able to bring the pulse energy above 500 uJ, which is where it was after the RC's intervention in the morning. Is it possible to bring up the energy in the morning? |