117
|
31 Mar 2023, 05:10 |
Benjamin, Yi-Ping, Ru-Pan, Andreas | SCS | Late Shift Summary | Achievements
Optimized BOZ for Co and
Fe
Estabilished Stable liquid |
|
120
|
02 Apr 2023, 04:46 |
Benjamin van Kuiken | SCS | Late Shift Summary | Achievement
Measured tXAS at the Fe
L-edge of Fe(bpy)3 using both delay and energy |
|
441
|
07 Nov 2023, 15:57 |
Janni Eidam | | KW44 - Leak in Solid Attenuator | There was a leak in the Solid Attenuator
that increased on Saturday morning when SPB
moved the arm number 4 (see last |
   |
19
|
29 Oct 2022, 11:03 |
Jaydeep Patel | | Jet alignment test- obeserver |
Nozzle
type
Nozzle |
|
3
|
16 Jan 2023, 19:50 |
Jan Gruenert | PRC | Issue | Problem: Beam operation in SASE2
is prohibited by SEPS / MPS
Origin of problem: HED-CRL3 |
 |
4
|
17 Jan 2023, 10:25 |
Jan Gruenert | PRC | Issue | SASE3 peration issue - SOLVED
Controls
issue, the machine cannot make beam in SASE3.
From
BKR / DOOCS the problem description is: Big |
|
6
|
22 Jan 2023, 18:40 |
Jan Gruenert | PRC | Issue | SASE1 blocked to 1 bunch/train
by EPS interlock (sic, not 2 but 1)
--- PARTIALLY RESOLVED |
   |
13
|
02 Feb 2023, 06:37 |
Chan Kim | SPB | Issue | SPB_IRU_DPA/MOTOR issue
X stage looks okay, but Y, AX,
and AY values have been changed by 2-3mm. |
    |
17
|
05 Feb 2023, 15:18 |
Harald Sinn | PRC | Issue | 15:15 SCS called and reported an
issue with one of the motors of the SCS exit
slit. DOC already looked at the problem and |
|
30
|
13 Feb 2023, 19:02 |
Frederik Wolff-Fabris | PRC | Issue | SA3 SCS exit slit: the upper blade was
detached from the motor and fall into closed
position. Maurizio V. and F. Wolff-Fabris tried |
|
58
|
28 Feb 2023, 07:17 |
Romain Letrun | SPB | Issue | In the public status display, it looks
like FXE is taking the beam even though their
shutter is closed. |
|
78
|
14 Mar 2023, 10:56 |
Harald Sinn | PRC | Issue | The longitudinal feedback on SA1/3 was
swicthed off by mistake over night. When
it will be switched on, the beam may wiggle |
|
79
|
14 Mar 2023, 14:40 |
Harald Sinn | PRC | Issue | In order to optimise the performance of
SASE2 self seeding, a stronger compression
setting is required. |
|
80
|
14 Mar 2023, 20:26 |
Harald Sinn | PRC | Issue | SCS could only use two pulses, because
the SXP imager was still in the beam and
SXP shutter open. |
|
99
|
23 Mar 2023, 11:38 |
Romain Letrun | SPB | Issue | When using 1.13 MHz X-ray repetition rate,
SASE1 HIREX is capturing two pulses in a
single frame giving the impression that there |
  |
111
|
28 Mar 2023, 15:26 |
Angel Rodriguez Fernandez | MID | Issue | The door from MID side entrance was smashed
and we lost the radiation permit.
The acciedent happened between |
|
123
|
04 Apr 2023, 08:37 |
Frederik Wolff-Fabris | PRC | Issue | TUE 08:30AM:
The SA3 Cell 17 & 18 Phase
shifters do not move and encoders are damaged. A |
|
127
|
07 Apr 2023, 23:57 |
Yifeng Jiang | FXE | Issue | After receiving beam from SPB, we noticed
that there is a werid shape of beam in the
FEL imager which was not observed yesterday. |
|
128
|
08 Apr 2023, 10:29 |
Andreas Galler | PRC | Issue | Changed EPS Interlock condition
for SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT
SPB/SFX called DOC this morning |
|
130
|
08 Apr 2023, 23:44 |
Yifeng Jiang | FXE | Issue | We notice that 0.5 mm Silicon ATT in SASE1
causes holo beam profile in FEL imager. Maybe
this silicon att has been damaged. |
 |