| ID | Date | Author | Group | Subject |  | 470 | 30 Jul 2024, 10:38 | Antje Trapp |  | Solid attenuator arm 5 limit switch |  | On 27th of July, it was reported that arm 5 of the solid attenuator did not stay in 'out' position when retracted, but moved in immediately again. Reason was, that the limit switch for the 'out'-position did not trigger, and thus the actuator was in error state. Default for error state is 'in'. In order to keep the arm removed, the default was changed on PLC level for the time being. Today, 30th of July, we did ZZ to investigate the issue. It was found that the bar that accommodates the upper and lower limit switches had become loose and the limit switches were pressed out of the way by the motion, rather than being triggered. The reason for the bar becoming loose, probably is a not ideal alignment of pneumatic actuator, guiding rod and limit switch bar, which resulted in a small relative motion between the three. This was fixed and limit switches were again aligned and trigger in both 'in' and 'out' position. We believe, this will remain stable until WMP, but should be investigated more thoroughly, as we could not reach very well all connections in situ. |  | 469 | 18 Apr 2024, 23:19 | Jan Gruenert | PRC | Issue |  | 22h55:HED informs that they have issues with the HED pulse picker in XTD6. It affects the ongoing experiment, but not to an extent that they cannot continue the beamtime.
 It will be more an issue for the next beamtime starting this weekend, therefore they are looking into solutions, working together with DOC and EEE.
 They might need a ZZ access to XTD6 to check the pulse picker mechanics outside vacuum.
 |  | 467 | 26 Jan 2024, 15:24 | Antje Trapp | XRO | end of shift summary |  | Vertical motors of M3 now calibrated in first iteration and gemetrical neutral calibrated to 0 in motor settings!!! New HED positions saved in XRO setpoints 'C' euler calibration not completed for M3 |  | 466 | 25 Jan 2024, 14:57 | Antje Trapp | XRO | end of shift summary |  | It was possible to align to HED in parasitic mode to seeding tests mirror horizontal position (coating stripes) was optimized as far as possible under parasitic conditions vertical motors calibration and EulerMDL calibration still to be done - collimated beam needed for that. |  | 465 | 24 Jan 2024, 14:00 | Antje Trapp | XRO | scanning for HED beam |  | We found reflection of M3 on M2 popin, but could not locate the beam on HED PBLM nor HED_XTD6_SDLBM-1 scanning both horizontally and vertically around previously saved positions on M3 popin. managed to get beam through to sdlbm-1. No beam found downstream of that. Saved motor positions in last picture   ATTENTION: M3 MOTORS STILL NOT CALIBRATED AFTER MECHANICAL INTERVENTION DURING WMP. EULER MDL NOT WORKING RELIABLY FOR M3 |  | 464 | 28 Nov 2023, 19:36 | Jan Gruenert | XPD | Status |  | Ramp down activities completed by XPD. References: 
	SASE1
	
		https://in.xfel.eu/elog/SASE1+technical+commissioning/2204https://in.xfel.eu/elog/SASE1+technical+commissioning/2205https://in.xfel.eu/elog/SASE1+technical+commissioning/2206SASE2
	
		https://in.xfel.eu/elog/SASE2+technical+commissioning/1206...until...https://in.xfel.eu/elog/SASE2+technical+commissioning/1209SASE3
	
		https://in.xfel.eu/elog/SASE3+technical+commissioning/2220https://in.xfel.eu/elog/SASE3+technical+commissioning/2221 The XFEL photon beam was switched off as planned at 19h00 sharp. Machine is preparing for opening the photon tunnels tomorrow morning and to start the winter maintenance period. |  | 463 | 26 Nov 2023, 23:26 | Adam Round | SPB | Shift summary |  | X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection800 uJBeam pointing and corrected with M2 Ry piezo stepping optimizing scatering intensity seen on JF4M Optical laser delivery Achievements/Observations 
	Crystal diffraction data from user samples Issues 
	pointing stability was again an issue but adjusting with M2 Ry piezo stepping optimizing scattering intensity seen on JF4M enabled online correction |  | 462 | 25 Nov 2023, 23:45 | Chan Kim | SPB | Shift summary |  | X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection800 uJBeam pointing and stability issues towards end of shift (again) Optical laser delivery Achievements/Observations 
	Crystal diffraction data from several samples collected with detector close up two sample to detector position Issues 
	The counts in the pupil has been dropping over the day and less than yesterday (one issue was a YAG screen in SPB_XTD9_IMGPI)pointing stability of beam in the end of the day (similar to yesterday) |  | 461 | 25 Nov 2023, 19:56 | Chan Kim | SPB | other |  | Beam drift in the horizontal direction (XTD9_XGM). From ~16:00, X-ray beam started to drift in the horizontal direction. In total, ~0.3 mm drift observed within 2-3 hours.   Attachment 1: Beam X position in XTD2_XGM and XTD9_XGM |  | 460 | 24 Nov 2023, 23:11 | Chan Kim | SPB | Shift summary |  | X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection900 uJBeam pointing and stability issues towards end of shift Optical laser delivery Achievements/Observations 
	Crystal diffraction data from 4 different samples collected with detector close up two sample to detector position Issues 
	Jungrfau gain visualisation caused some concern - was confirmed with the hlp of DOC to be a known issue that the Medium and low gains are masked in that region leding to dark areas in corrected mapsample collision with cone and OSA required realignment of the setuppointing stability of beam in the end of the day (BKR confirmed that the electron orbit is okay. So, we may need to contact PRC) |  | 459 | 24 Nov 2023, 20:48 | Chan Kim | SPB | other |  | Beam drift in the horizontal direction (XTD9_XGM x position) started at around 10am and continuously drifted until 16:00. After then, beam has been drifted back to original position within 4 hours. |  | 458 | 24 Nov 2023, 05:07 | Bjoern Senfftleben |  | Sample Camera got stuck (likely at 11pm) and was only noticed at 5am |  | After going in and reconnecting the camera, we observe att. 1.   According to logs the camera device server was restarted around 11pm, however the camera instance was never reinstantiated after the restart. The Karabo GUI did not indicate that properly, instead showed a frozen image that looked as if the camera works properly. (see history of camera state in att. 2) Device Server log shows that after camera connection was lost, the device server restarted?! Was this restart done on purpose? 
2023-11-23T23:02:22.499 ERROR  karabo.AravisBasler2Camera  : SQS_AQS_UPP/CAM/A2A1920_2: Could not synchronize timestamp: GigEVision write_memory timeout
2023-11-23T23:02:27.504 ERROR  karabo.AravisCamera  : SQS_AQS_UPP/CAM/A2A1920_2: arv_device_get_float_feature_value failed: GigEVision read_memory timeout
2023-11-23T23:02:30.007 WARN  karabo.AravisCamera  : SQS_AQS_UPP/CAM/A2A1920_2: Control of the camera exflqr50765 is lost
INFO  Successfully loaded plugin: "libslsDetectors.so"
INFO  Successfully loaded plugin: "libaravisCameras.so"
2023-11-23T23:02:33.773 INFO  openMq  : Opened TCP connection to broker %s:%d.
2023-11-23T23:02:33.775 INFO  openMq  : Connection ping enabled (ping interval = %d second).
2023-11-23T23:02:33.778 INFO  openMq  : Connection connected to broker
2023-11-23T23:02:33.778 INFO  karabo.net.JmsConnection  : Opened TCP connection to broker tcp://sa3-br-sys-broker-2:7777
2023-11-23T23:02:33.779 INFO  karabo.core.DeviceServer  : Logfiles are written to: "/scratch/xctrl/karabo/var/log/cppServer/sqs_nqs_vmi_cam/device-server.log"
2023-11-23T23:02:34.785 INFO  karabo.xms.SignalSlotable  : Instance starts up in topic 'SQS' as 'cppServer/sqs_nqs_vmi_cam' - Karabo 2.16.6
2023-11-23T23:02:34.786 INFO  cppServer/sqs_nqs_vmi_cam  : DeviceServer starts up with id: cppServer/sqs_nqs_vmi_cam
2023-11-23T23:02:34.786 INFO  cppServer/sqs_nqs_vmi_cam  : Updated list of devices available: AlarmService,AravisBasler2Camera,AravisBaslerCamera,AravisCamera,AravisPhotonicScienceCamera,CameraImageSource,DataLoggerManager,FileDataLogger,FileLogReader,Gotthard2Control,Gotthard2Receiver,GotthardControl,GotthardReceiver,GuiServerDevice,ImageSource,InfluxDataLogger,InfluxLogReader,JungfrauControl,JungfrauReceiver,PropertyTest
2023-11-23T23:02:34.934 INFO  karabo.core.DeviceServer  : Sending instance update as new device plugins are available: AravisBasler2Camera,AravisBaslerCamera
2023-11-23T23:02:34.934 INFO  cppServer/sqs_nqs_vmi_cam  : Keep watching directory: "/scratch/xctrl/karabo/plugins" for Device plugins
2023-11-23T23:02:34.934 INFO  cppServer/sqs_nqs_vmi_cam  : Starting Karabo DeviceServer (pid: 235604) on host: sqs-rr-sys-con-cams-1, serverId: cppServer/sqs_nqs_vmi_cam, Broker: tcp://sa3-br-sys-broker-2:7777
2023-11-23T23:02:35.073 INFO  karabo.core.DeviceServer  : Successfully connected to time server 'SQS_RR_UTC/TSYS/TIMESERVER'   ==> Status of Taylor Cone unknown for runs 334 - 401   We had to physically unplug and replug the ethernet cable to the camera to get it to work again. |  | 457 | 23 Nov 2023, 23:12 | Adam Round | SPB | Shift end |  | Staff: AR, MS, DM, KK, RL, RdW X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection900 uJBeam down around 1h Optical laser delivery Achievements/Observations 
	XTD2 lenses were realignedCrystal diffraction data from lysozyme and MOF collected with detector close up Issues 
	Beam down around 1hOnce again we lost connection to JF4M module 01 requiering reset of receivers. |  | 456 | 23 Nov 2023, 22:15 | Jörg Hallmann | MID | Shift summary |  | 
progress with the Damnit - XPCS analysis test with various samples (SiO2, Ludox etc.) tested some external samples P3HT, SOD1 but it looks like conventional XPCS is not working (signal too low - increasing transmission leads to radiation damage in both cases) checked the diamond attenuators in the tunnel & optics hutch - all thicknesses indicated in the scenes seem to be correct   issue: AGIPD HV switched off by itself - ramping up again was possible |  | 455 | 22 Nov 2023, 23:18 | Raphael de Wijn | SPB | Shift summary |  | X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection700-800 uJstable delivery Optical laser delivery Achievements/Observations 
	More data collection with Jungfrau at the back of the CSSCrystal diffraction data from salicylic acid, ibuprofen and MOF collected with detector close up Issues 
	Clear aberations from our CRLs, so we operate with as few as possibleTwice during data collection we lost connection to JF4M module 01 requiering reset of receivers. |  | 454 | 22 Nov 2023, 22:48 | Johannes Moeller | MID | Shift summary |  | 
*Tests for online XPCS pipeline ongoing*beam optimization with power slits, current beam size 8x13um (v x h), we assign the larger value in the horizontal direction to jitter
 *Movement of the AGIPD quadrants to increase q range to lower values
 *analysis and update of Sample to detector distance and geometry
 *ScannerX of the FSSS is crashing very! frequently.
 |  | 453 | 22 Nov 2023, 10:19 | Johannes Moeller | MID | Issue |  | The Si 0.5mm absorber of XTD1 attenuator seems to be damaged. First screenshot is with that one inserted. In the second screenshot, it is replaced with a Si 0.5mm from MID_XTD6_ATT.   |  | 452 | 21 Nov 2023, 23:29 | Adam Round | SPB | Shift end |  | Staff: AR, MS, DM, RL, RdW X-ray delivery 
	16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collectionstable delivery Optical laser delivery Achievements/Observations 
	Beam aligned down to zyla cam 3CRLs were inserted but created too much speckles on Jungfrau and we couldn't reach the expected 80 um beam size for the users lenses (arms 6 and 7 unusable, arm 4 hole feature in beam)user lenses alignedUser beamstop installed to block 1st order line in horizontal directionCollected several speckle tracking data scans without our CRLs - to give initial estimates for focusJungfrau timing confirmed - signal observed Issues 
	Could not see signal with the thin sample and the CRLs insertedclear aberations from our CRLsCRL arm 4 motors were not moving. To recover it, we connected the motor and encoder cables from the pinhole arm. |  | 451 | 20 Nov 2023, 07:12 | Jayanath Koliyadu | SPB | Shift end |  | X-ray delivery 
	1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery Optical laser delivery Achievements/Observations 
	Installation of imaging optics and alignment Issues |  | 450 | 19 Nov 2023, 06:54 | Tokushi Sato | SPB | Shift summary |  | X-ray delivery 
	1.3-1.7 mJ, 10.7 keV, 1-100 pulses, stable delivery Optical laser delivery Achievements/Observations 
	Aligned beam trajectory for 10.7 keV direct beamInstallation of imaging optics Issues |  |