272
|
21 Jul 2023, 20:31 |
Silja Schmidtchen | XRO | Shift Summary SA2 | Alignment to HED: https://in.xfel.eu/elog/XRO+Beam+Commissioning/205
SA2 - divergence with various M2
bender positions HED - https://in.xfel.eu/elog/XRO+Beam+Commissioning/200 |
|
57
|
27 Feb 2023, 02:10 |
Felix Brausse | MID | Shift Summary Feb 26th | Moved out MONO, aligned SDL without MONO
Looked at both beams on DES
Struggled to get the same beam |
|
56
|
26 Feb 2023, 01:37 |
Felix Brausse | MID | Shift Summary Feb 25th |
Aligned both branches of the split-and-delay
line.
Brought the beam into the
experimental hutch to image it on the x-ray |
|
275
|
28 Jul 2023, 06:38 |
Sergii, Manuel | SCS | Shift Summary 27_07_23 night | Achievements:
1. Beam in sample chamber, almost
overlapping with ALAS |
|
114
|
30 Mar 2023, 04:16 |
Benjamin, Robert, Yi-Ping, Ru-Pan | SCS | Shift Summary | Achievements
Found coarse timing between
XFEL and optical laser
Problems |
|
333
|
06 Sep 2023, 23:33 |
Ben, Andreas | SCS | Shift Summary | Achievements
Determined temporal overlap
between the X-ray and laser
measured |
|
400
|
21 Oct 2023, 15:34 |
Benjamin van Kuiken | SCS | Shift Summary | # Morning Shift Summary 21.10.23
Ben, Eugenio
Achievements |
|
412
|
25 Oct 2023, 06:02 |
Diogo Filipe Monrroy Vilan e Melo | | Shift Summary | Staff: DM, CK, KK
X-ray delivery
7.8keV, 2.4mj, stable delivery, |
|
458
|
24 Nov 2023, 05:07 |
Bjoern Senfftleben | | Sample Camera got stuck (likely at 11pm) and was only noticed at 5am | After going in and reconnecting the camera,
we observe att. 1.
|
  |
133
|
10 Apr 2023, 02:16 |
Jan Gruenert | XPD | SPB_XTD9_IMGPII45 lost steps - REPAIRED | REPAIRED / FIXED
Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost |
|
269
|
20 Jul 2023, 18:17 |
Kelin Tasca | XRO | SPB beam alignment 1 keV 2 mrad | |
 |
370
|
27 Sep 2023, 07:51 |
Benjamin van Kuiken | SCS | SCS Night Shift Summary | Achievements
Characterized optical laser
spot at sample
Problems |
|
12
|
30 Jan 2023, 15:21 |
Maurizio Vannoni | XRO | SASE3 Summary of Maintenance Period and Ramp up activities | SASE3
Summary of Maintenance Period and Ramp up
activities |
|
11
|
30 Jan 2023, 19:06 |
Maurizio Vannoni | XRO | SASE2 Summary of Maintenance Period and Ramp up activities | SASE2 Summary of Maintenance
Period and Ramp up activities
Maintenance |
|
50
|
21 Feb 2023, 23:31 |
Thomas Baumann | | SASE1 changing photon energy changes the 2-color setup in SASE3 | We were set-up for 5.7 keV photon energy
in SASE1. We made a test with BKR to change
this energy to 9.3 keV. This had an effect |
 |
10
|
30 Jan 2023, 16:31 |
Maurizio Vannoni | XRO | SASE1 Summary of Maintenance Period and Ramp up activities | SASE1
Summary of Maintenance Period and Ramp up
activities |
|
413
|
25 Oct 2023, 02:43 |
Diogo Filipe Monrroy Vilan e Melo | | SASE 3 background heavily impacts our focus | Attch 1: We were having trouble focusing
at IRU chamber. After multiple attempts the
best we could achieve was 2.9-3.1 um beam. |
   |
20
|
08 Feb 2023, 11:14 |
Andreas Koch | XPD | SA3 status | Bunch number control - SA3 FEL
imager
As announced today in the XO meeting |
|
202
|
12 May 2023, 16:12 |
Frederik Wolff-Fabris | XO | SA3 status | The SA3 EPS power limit at the Big brother
was disabled to allow photon energy scans
in SQS (due to Kr resonance at XGM, invalid |
|
35
|
16 Feb 2023, 14:04 |
Frederik Wolff-Fabris | XO | SA2 status | Data for the Horizontal jitter at the HED
Pop-In was observed during beam delivery
on cw05 (03-05.Feb) and cw07 (14-16.Feb) |
 |