ID Date Author Group Subjectdown Text Attachments
  77   11 Mar 2023, 12:46 Frederik Wolff-FabrisPRCSA2 statusThe SA2 XTD1 XGM is current offline since
Saturday morning.

Yesterday, Friday, it already started
  
  182   05 May 2023, 16:51 Jan GruenertPRCSA2 statusMID reports an observation that
is particular to the operation at the currently
high photon energy of 23 keV
  
  443   10 Nov 2023, 17:39 Jan GruenertXPDSA2 statusEnd of 30 keV study

The machine finished their attemps
for 30 keV tuning while using NEPAL injector
 JG_2023-11-10_um_17.55.00.png 
  170   04 May 2023, 00:07 Jan GruenertPRCSA1 statusSASE1 status:

First shift switchover this week
at 23h from FXE (19.5 keV) to SPB/SFX (12.4
  
  Draft   22 Aug 2023, 15:52 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  316   22 Aug 2023, 15:56 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  347   19 Sep 2023, 18:58 Jan GruenertPRCSA1 statusConcerning SASE1:

Please note that for this week
the "remote power limit" was set
  
  350   21 Sep 2023, 09:24 Jan GruenertPRCSA1 statusInfo by R.Kammering (mail 20.9.23 18h25),
related to the SA1 intensity drops
during large wavelength scans:
  
  351   22 Sep 2023, 00:56 Jan GruenertPRCSA1 statusAs agreed beforehand, PRC and SPB/SFX re-assessed
the SA1 EPS power limit based on actual performance,
required number of pulses and rep rate, at
  
  180   05 May 2023, 07:23 Giuseppe MercurioSCSRe: Shift summaryActually, it looks like the sync was lost
shortly before 23h last night as the jitter
went to 0fs and recovered at 1am when a new
 optical_sync_2023-05-05_07-21-35.png 
  221   03 Jun 2023, 13:42 Thomas PrestonHEDPulse energy has dropped to ~50% from this morning03 Jun 2023, 13:46

We called the BKR to ask what they
can do about our pulse energy being 50% (~160uJ
  
  313   19 Aug 2023, 07:16 Sergii, ManuelSCSNoght shift sammary 18.08.2023
Night
shift summary on 18.03.2023


Finished XAS series at
  
  408   23 Oct 2023, 06:46 Laurent MercadierSCSNight shift summary, 23.10.2023 

  
  310   17 Aug 2023, 11:09 Sergii Parchenko, Manuel HarderSCSNight shift summary on 16.08.23Achievements


Acquired tr-RIXS data with
4.0 mJ/cm² laser power for 21 delays
  
  284   31 Jul 2023, 01:42 Sergii, MartinSCSNight shift summary 30.07.2023Achivements:

-We measured vertical spot size
for several VFM settings
  
  399   21 Oct 2023, 06:30 Laurent, PhuongSCSNight shift summary 21.10.2023Night shift summary
21.10.2023

Achievements


Found T0 on SiN, but the
  
  149   21 Apr 2023, 04:13 Robert CarleySCSNight shift summary 20-21.04.2023Activities:


Investigated SAXS scattering
instability and found it to come from the
  
  76   06 Mar 2023, 06:20 Teguh, LuigiSCSNight shift summary 05.01.2023Achievements:

1. Continued measuring time-resolved
and static RIXS on water (run table in elog
  
  121   03 Apr 2023, 06:38 Loic, Yi-PingSCSNight shift summary 02.04.2023Achievements:

Collected more scans on cyanocobalamin,
both delays scans and dynamic XAS
  
  63   02 Mar 2023, 05:41 Teguh, LuigiSCSNight shift summary 02.03.2023Achievements:

1. Performed knife-edge scan. The
beam size is currently at 5 um x 120 um.
  