Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 14 of 24  Not logged in ELOG logo
ID Date Authordown Group Subject
  84   16 Mar 2023, 01:35 Johannes Moeller End of shift

Stable HXRSS delivery with >800 uJ, 1 bunch, 8.99 keV.

Re- Alignment of X-ray beam performed.

-Beam position defined for sample interaction in SAM CAM1. Do not touch SAM CAM1

-X-ray beam (unfocused and focused) is now going through LIC & 45 deg mirror. Updated M2 feedback setpoint.

-CRL2 has been aligned to the new position.

-Lower branch SDL aligned. Not on Sample interaction point.

-LIC mirty moved out -63 mm (in at 6 mm)

 

Status now:

We moved lower branch out. CRL2 left in.

We have left the direct beam (no branch) on the X-ray eye and inline microscope.

We have left some diamond in the OPt Hutch Att for running  feedback and HIREX

 

To do:

- Bring both branches to the sample interaction point in SAM CAM1.

- Aligment upper branch

- Spatial overlap laser and X-ray

- temporal overlap with diode (from laser and lower branch?)

- Beamsize analysis of both branches

 

  85   17 Mar 2023, 01:48 Johannes MoellerMIDShift summary

The intensity of the Seeding decreesed from 850 uJ to 550 uJ during the time between 20:00 and 02:00.

The Spectral purity also got worst, the beam in HIREX looks to have more SASE shoulders.

Between 18 and 20 we show a prossible transiant signal, PPL, of the lower branch. But a problem with the monochromator in the MID opt Hutch trigger the valve to close. After we where not able to see the signal possible effect of laser or X-ray inestabilities.

Problems with the liquidjet, the nozzel got clogged.

Started the aligment of the upper branch of SDL

  87   18 Mar 2023, 01:45 Johannes Moeller shift summary
  • stable HXRSS delivery at 8.99 keV, 1 bunch. XGM intensity during the day decreased from 750 uJ to 600 uJ.
  • Vacuum in sample chamber stabilized with cold trap and full beam path opened to AGIPD and endstation
  • Again problems with smaract stages in DES, but imager in a good position to continue.
  • First scattering data recored from water jet. Unknown, bimodal intensity distribution
  • Focus characterization of SDL lower branch with knife edge, X-ray eye and SAXS speckle data. Larger (>10 um) as compared to direct beam with same focussing setup.
  • Clear influence of splitter insertion on beamsize observed. Beam is smaller without splitter crystal.
  • Current status: Alignment of upper branch unfinished, X-ray eye inserted, sample chamber vented

For the next shift:

  • Finsish alignment of upper branch
  • Characterize both beams in size with Xray eye. Try if slightly different lense combinations or M2 bender settings improve the situation.
  • Overlap both beam on the sample
  • Possibly insert upstream pinhole just in front of jet to clean up and ensure overlap
  • Take data, enjoy
  88   19 Mar 2023, 02:01 Johannes Moeller shift summary
  • upper and lower branch of SDL aligned
    • beamsizes and angular mismatch characterized
  • vacuum leak of flight path fixed
  • side view microscope re-aligned
  • problems with replaced MPC diamond detector. issue with in-vacuum cabeling suspected
  • misconfigured timing of AGIPD fixed
  • splitting ratio of SDL detuned while HXRSS intensity decreased significantly. Possibly correlated.

With the current HXRSS intensity and focussing, we have insufficient conditions to take data for the experiment. We decide to vent the sample chamber and try to fix the malfunctioning diamond detector instead of taking data over night. HXRSS should be improved tomorrow morning and the SDL possibly realigned afterwards.

  232   08 Jun 2023, 11:02 Johannes MoellerMIDIssue

Addition to previous issue:

Last incident (of overall 4), we had 0 bunches, moved in XTD1 ATT 0.6 and 1.2 mm CVD diamond in and 2.4mm CVD out. However, vacuum started to become bad already two days ago.

Update from vacuum OCD: Seems to be related to one leaky below of 2.4 mm CVD arm. Operational consequences are discussed right now.

  321   25 Aug 2023, 06:20 Johannes MoellerMIDShift summary

Shift summary the 24th of Aug

  • MID takes the seeded beam about 200 uJ including SASE background.
  • Monochrometer is aligned.
  • Mono + CRL2 was tested.
  • Found rough timing with a fast diode at the sample position
  • Finding the temporal overlap with Forsted YAG hasn't been done yet. The motor (PPODL) doesn't change the laser delay, but LA2_LAS_PPL/CTRL/TRGDLY does. The values is not able to implemented into the Scantool since it doesn't have target position.
  • Photon energy spectrum was measured w and w/o mono with Gotthard at DES.
  • Nano focusing lens is aligned. The beam size is about 20 um X 20 um. Very stable pointing at the sample position.
  372   29 Sep 2023, 00:35 Johannes MoellerMIDShift summary

1, 60 and 350 pulses at 8.7keV, HXRSS

*focus characterization CRL2 lens 3,5,6
*Si 20nm XPCS with 20 and 50 pulses to evaluate the contrast
*damage and dynamic studies on HGW with 1 and 350pulses and different attenuation and different temperatures

HXRSS tuning is ongoing during the night, we leave the beam on the MID spectrometer and the zoom session open for tuning.
 

  378   01 Oct 2023, 02:00 Johannes MoellerMIDShift summary

HXRSS at 8.8 keV, 1, 60 or 350 pulses. Quite stable seeding performance

  • loaded new sample (HGW) in the morning
  • measured full temperature series on HGW during the day
  • problem with vacuum in the cryostat-chamber, which triggered the interlocked during the data taking and blocked AGIPD for some temperatures
  • focussing optimized in the evening and relaxing the bender, with 2-3 times better contrast determined. Please don’t touch CRL2 from now.
  • loaded new sample in the evening, but insufficient vacuum in the user chamber prevents opening the valve to the AGIPD first
  428   01 Nov 2023, 02:22 Johannes MoellerMIDShift summary
  • stable delivery of 1mJ at 18keV SASE
  • succesful beamline alignment for MID (CRLs + M1 and M2) with mono.
  • alignment of NAFO stack to DES and zyla camera with SASE and monochromatic beam
  • setup of DES spectrometer for 18keV on 440 reflection with SASE
  • timing of PP laser with perpendicular excitation condition with diode and YAG

Problems:
Mirror M2 needs 30min to move from SASE to Mono position

  430   02 Nov 2023, 02:28 Johannes MoellerMIDShift summary
  • stable delivery of 1mJ SASE at 18keV
  • NAFO lens characterization with caustic scan
  • successful detector calibration of AGIPD with LaB6 and alignment of Jungfrau to diffraction signal with LaB6
  • test of ptychography with 18keV (not successful)
  • successful setup of online holography analysis with test measurements
  433   03 Nov 2023, 02:08 Johannes MoellerHEDShift summary
  • stable 18 keV SASE delivery
  • measurement of siemens star in the morning
  • alignment of phase plate for the nano focussing lenses
  • testing and debugging of the pulse on demand macro
  • holography test measurements and optimization of online analysis
  • alignment of user samples

Problems:

  • FSSS ScannerX had to be shutdown and initiated quite often
  • We lost the output of the pp laser at 22:30. Laser OCD could solve the problem and the laser was back at 23:45.
  434   04 Nov 2023, 02:29 Johannes MoellerMIDShift summary
  • Stable delivery of SASE at 18 keV. The intensity dropped slightly from 1mJ to 0.88mJ during the evening, but everything good.
  • fixed the laser pulse-on-demand + FSSS scanning macro
  • We take some images series of the laser drilling process for different laser fluences
  • We started to take first time resolved data
  453   22 Nov 2023, 10:19 Johannes MoellerMIDIssue

The Si 0.5mm absorber of XTD1 attenuator seems to be damaged. First screenshot is with that one inserted. In the second screenshot, it is replaced with a Si 0.5mm from MID_XTD6_ATT.

 

  454   22 Nov 2023, 22:48 Johannes MoellerMIDShift summary

*Tests for online XPCS pipeline ongoing
*beam optimization with power slits, current beam size 8x13um (v x h), we assign the larger value in the horizontal direction to jitter
*Movement of the AGIPD quadrants to increase q range to lower values
*analysis and update of Sample to detector distance and geometry
*ScannerX of the FSSS is crashing very! frequently.

  124   04 Apr 2023, 11:18 Johan Bielecki XTD2 Si500 attenuator broken

Attachment 1: Beam in SPB hutch with Si500

Attachment 2: Beam without Si500

  126   07 Apr 2023, 23:03 Johan BieleckiSPBShift summary

Beam delivery for proposal 3378

Achievements/Observations

  • Collected data on liquid H20 and D20
  • Found conditions where only ice were seen. approx. 4h of ice data taken. Starting to look at correlation maps
  • Background at 0.88mm nozzle distance measured

To do for next shift:

Continue taking data

 

 

  129   08 Apr 2023, 22:52 Johan BieleckiSPBShift summary

Beam delivery for proposal 3378

Achievements/Observations

  • Collected large amounts of data for the user program on water crystallisation and angular correlations

To do for next shift:

Continue taking data

  255   15 Jun 2023, 23:08 Johan BieleckiSPBShift summary

X-ray delivery

  • 12.42 keV, stable delivery in single pulse mode with 1.9 mJ/pulse

Optical laser delivery

  • 532 nm ns-laser for sample pumping

Achievements/Observations

  • Collected protein crystal diffraction for three different samples with varying laser delay and fluence. LCP viscous jet sample delivery.
  • Stable CRL focus using tunnel collimation with 3 XTD2 lenses followed by 17 focusing lenses in SPB hutch. 2 um FWHM focus with <1um standard deviation in 'X' position.
    • 3 XTD2 lenses gives a round X-ray beam approx 1 mm in size, such that we are almost overfilling the CRL apertues in SPB.

Issues

  • Some initial jetting issues, which have now been solved.
  19   29 Oct 2022, 11:03 Jaydeep Patel Jet alignment test- obeserver

Nozzle type

Nozzle Aperture(µm)

Sample

Jet Speed(m/s)

He flow rate

Liquid flow rate

Repetition rate

 

      Beam Attenuation

(%)

 

Run No.

GDVN

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

75

Water

 

25

10

80

0.5

122

30

13

60

0.5

9

123

40

20

30

0.5

23

124

45

25

30

0.5

23

125

50

32

30

0.5

23

126

Buffer 1

 

25

10

80

0.5

31

141

30

14

60

0.5

31

140

40

20

30

0.5

31

139

45

26

30

0.5

31

138

50

32

30

0.5

9

137

Buffer 2

 

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Crystal size 1µm

25

10

80

0.5

16

131

30

13

60

0.5

16

130

40

20

30

0.5

16

129

45

25

30

0.5

16

128

50

32

30

0.5

16

127

Crystal size 2-4µm

25

10

80

0.5

12

132

30

13

60

0.5

9

133

40

20

30

0.5

9

134

45

25

30

0.5

9

135

50

32

30

0.5

9

136

Crystal size 5 µm

25

10

80

0.5

9

142

30

13

60

0.5

9

143

40

20

30

0.5

31

144

45

25

30

0.5

29

145

50

32

30

0.5

29

146

DFFN

JKMH8.11

 

8.11=75-70-70

 

 

 

 

 

 

 

 

 

 

75

water

25

13

80

0.5

 

 

30

13

40

0.5

 

 

40

20

20

0.5

 

 

45

25

15

0.5

 

 

50

32

15

0.5

 

 

Buffer1

 

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Buffer2

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Crystal size 1 µm

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Crystal size 2-4 µm

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Crystal size 5 µm

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

GDVN

C/C4

 

C=100-90-100

C4=100-75-100

 

 

 

 

 

 

 

100

Water

26

15

80

0.5

58%

172

30

 20

 60

0.5

58%

171

40

35

25

0.5

58%

170

45

37

 25

0.5

58%

174

50

 40

18

0.5

58%

175

Buffer 1

26

 

 

 

 

180

30

 

 

 

 

179

40

 

 

 

 

178

45

 

 

 

 

177

50

 

 

 

 

176

Buffer 2

25

 

 

 

 

 

30

 

 

 

 

 

40

 

 

 

 

 

45

 

 

 

 

 

50

 

 

 

 

 

Crystal size 1 µm

25

 

 

 

31%

181

30

 

 

 

31%

182

40

 

 

 

31%

183

45

 

 

 

31%

184

50

 

 

 

31%

 

185

Crystal size 2-4 µm

25

 

 

 

31%

187

30

 

 

 

31%

188

40

 

 

 

31%

189

45

X

X

X

X

X

50

X

X

X

X

X

Crystal size 5 µm

25

20

80

0.5

16/ 31%

147/190c4

30

30

60

0.5

31%

192

40

40

25

0.5

31%

193

45

40

15

0.5

 

 

50

40

10

0.5

 

 

  22   09 Feb 2023, 07:14 Jayanath KoliyaduSPBShift end

X-ray delivery

  • 9.3 keV, 1-85 pulses, 1.3 mJ, stable delivery

Optical laser delivery

  • 800 nm, 1-226 pulses, stable delivery except for shift change issues

Achievements/Observations

  • PP laser alignment and optimization at IRU and PAM
  • Aligned beam until IBS
  • Checked MKB focus
  • Timing at PAM
  • First signals on GOTTHARD II

Issues

  • Issues with shift change for PP laser. Intensity flucutation observed after shift change was done. This issue was similar to what was observed last year. We will inform LAS about this issue. No LAS OCD available to call before we leave after the shift (7:30 AM).
ELOG V3.1.4-7c3fd00