  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 10 of 24  Not logged in ELOG logo
Entry   Status, posted by Naresh Kujala on 22 Aug 2023, 18:15 
Photon beam delivery status:

- Machine informed that beam will be handover to instruments SA1 (SPB/SFX) and SA3 (SXP) at 18.30hr

- Machine needs more time for SA2 and the next update will be at 20hr.
Entry   Status, posted by Naresh Kujala on 26 Aug 2023, 08:23 
- Machine updates;

Saturday 1:30 hr Cold compressor failed. The initial estimation of downtime was 20 hr, later in today morning crew gave a new estimation of time
of 30 hr. So the machine will be switched on and beam delivery to instruments will be tomorrow morning. Today at 3 pm, I will get more information and
Entry   Status, posted by Naresh Kujala on 26 Aug 2023, 18:02 
Dear All,

Two important machine updates.

1) Still, the forecasted time for the start-up of the machine will be tomorrow morning.
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 07:54 
Info from MRC (Lars)

-----------------------------------------------------------------------------

The cryo crew reports that the cold compressor that failed is, alas!,
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 11:36 
- Due to the failure of the cryo cold compressor. The machine is down.

- Next update 9 pm today

Please do watch public display for status info.
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 15:03 
Info from Machine RC (Lars):

----------------------------------------------------------------------------------------------------------------------------------------

Author: Froehlich
Entry   moning shift summary, posted by Nahid, Ben on 19 Mar 2023, 15:03 
Achievements:


measured the new sample, Silane, with different time delays


Problems


Tuning of SASE2 led to a 50% decrease in the SCS XGM intensity without affecting the SASE3 intensity. It also caused a jump in the BAM
Entry   Shift summary - night shift 2023-02-17, posted by Motoaki Nakatsutsumim, Carsten Baehtz, Olly Humphries on 18 Feb 2023, 00:32 Aligned_A2_E5_2023-02-18_00-35-18.pngWire_OPeter_2023-02-18_00-52-19.pngScreenshot_from_2023-02-18_00-54-25.pngScreenshot_from_2023-02-18_00-59-37.pngScreenshot_from_2023-02-18_01-02-21.png
Ealier shift members managed to get a good quality image on Optique Peter by imaging the sample plane to the Optique Peter with downstream nanofocus
(CRL4b). The quality is far superiour compared to the one with upstream nanofocus, which does just a projection of sample (backlight). The decision is
to stay with the downstream CRL. They had a few full power shots. The problem of reading Zyla data when rotation = 0 is solved by Olly. He put the script
Entry   Shift summary 2023-02-19, posted by Motoaki Nakatsutsumi, Oliver Humphries, Carsten Baehtz on 19 Feb 2023, 23:25 P_20230220_045813b.jpgP_20230220_054233b.jpg
8.2 keV, 750 uJ. 

Short summary

- Optimize the downstream nanofocus CRL to image the sample to our detector (optique Peter) - successful)
Entry   Shift summary - night shift 2023-02-18, posted by Motoaki Nakatsutsumi, Carsten Baehtz, Olver Humphries on 19 Feb 2023, 05:29 Foc_scan_2000l_mm.PNG
18 Feb 2023, 23:37 Together with the last shift members, we continued shooting laser on Cu 25 um thick wire for another 2 hours. We got excellent quality
x-ray imaging with a series of time delay up to several ns (eLog ID 39).  X-ray imaging is now commissioned. The magnification was x7.5.

19 Feb 2023, 01:30 We tried to go to x20, but we couldn't find the x-ray beam. We even put the burn paper in front of the Optique Peter to
Entry   Shift summary HED 2022-0, posted by Motoaki Nakatsutsumi on 09 Apr 2023, 00:03 
9.752 keV, self-seeding, 700-800 uJ.  Intensity is very stable, ponting is also much stable than usual. very good beam.

Beamtime #3326 - Axion search.

Successfully aligned two Ge crystals to Laue conditions (Rocking curve width ~0.002 deg) . Found Laue reflections after 2 crystals on Jungfrau
Entry   Shift summary, posted by Motoaki Nakatsutsumi on 23 Sep 2023, 23:31 
During the morning shift (7am - 3pm), we couldn't take any meaningful data due to the issue of power glitch which caused the beam permission error
(AIBS) and down of SASE2 Karabo / Online-GPFS due to the lack of cooling in the rack room.

During the late shift (3 pm - 11 pm), after these issues were solved thanks to PRC/DOC/ITDM/EEE at 5 pm..., we could get back in operation relatively
Entry   Shift summary: 19. July, posted by Mikako Makita on 19 Jul 2023, 20:09 8x
Summary of today's activity:


Beam handover ~ 3pm.
SA2 mirror set tp B4C.
SA2 Rough alignment to MID & HED @ ~ 2-2.5 mrad ==> img 1, 4,
5 & 6
SA2 HED-Preabsorber position check with x-ray (working) ==> img 2 &3
SA3 M6 mirror Switch check (seems to be working)
SA1
Entry   Attention, posted by Michaela Petrich on 11 May 2023, 09:21 
Dear all,

I just got the information for BKR that due to a failed klystron we had a downtime around 8:40am this morning for about 30 mins.

Operation could be restarted successfully afterwards but with a different energy distribution than before. SASE2 has now reduced pulse energy
Entry   Issue, posted by Michaela Petrich on 16 Jun 2023, 06:28 
staus of JUN16, 11:30

SA1 and SA3 have been adjusted to acceptable conditions to be compatible with simultaneus operation at SA2

tuning on SA2 is ongoing
Entry   SASE3 Summary of Maintenance Period and Ramp up activities, posted by Maurizio Vannoni on 30 Jan 2023, 15:21 
SASE3 Summary of Maintenance Period and Ramp up activities


Maintenance
Entry   SASE1 Summary of Maintenance Period and Ramp up activities, posted by Maurizio Vannoni on 30 Jan 2023, 16:31 
SASE1 Summary of Maintenance Period and Ramp up activities

Maintenance

- MC2 library update was deployed by EEE and most of the motors were tested afterwards
Entry   SASE2 Summary of Maintenance Period and Ramp up activities, posted by Maurizio Vannoni on 30 Jan 2023, 19:06 Screenshot_2023-01-30_at_19.27.42.png
SASE2 Summary of Maintenance Period and Ramp up activities

Maintenance

- Many vibration tests were done.
Entry   Shift summary, posted by Maurizio Vannoni on 16 Apr 2023, 07:00 
Update of the damage tests at SQS.

Yesterday (15.04) SQS staff created a focused beam on our sample using a small YAG fragment we have placed on the holder.

Due to the unusual position, the beam is full of aberrations but it looked small enough for our purpose. Estimattion of the size is difficult
Entry   14.8 keV SPB 2mrad Alignment, posted by Maurizio Vannoni on 13 May 2023, 22:18 6x
Mirror positions and beam position on the imagers for 14.8 keV SPB, 2mrad

ATTENTION: the alignment was difficult due to the strong background from SA3 with 500 pulses. For the future, maybe SA3 could reduce to single
pulse during alignment of SA1. This would make the process easier.