366
|
24 Sep 2023, 07:49 |
Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, Teguh | SCS | summary of 23.09 | Around 6:55 there was a power glitch. Power
in the experimental hutch and rack room went
down in SASE3, error message in Xray interlock |
|
141
|
18 Apr 2023, 23:01 |
Laurent Mercadier, Martin Teichmann | SCS | summary late shift day 1 | Achievements
knife edge scans of FEL
beam, 30 um x 30 um beam size
aligned |
|
144
|
19 Apr 2023, 23:20 |
Laurent Mercadier, Martin Teichmann | SCS | shift summary day 2 UP3463 | Achievements
found larger beamstop
found
center of pinhole and bender settings for |
|
116
|
31 Mar 2023, 01:51 |
Jörg Hallmann | MID | shift summary March 30th | - seeding at ~800 uJ
- repaired the laser interlock
of A.08 |
|
113
|
30 Mar 2023, 02:37 |
Jörg Hallmann | MID | shift summary March 29th | achievments: alignment of the SDL (both
branches)
measuring of samples & calibrants |
|
139
|
16 Apr 2023, 23:06 |
Antje Trapp | MID | shift summary EulerMDL calibration | First four pictures: beam line status at
beginning of shift - Beam aligned to MID
Idea is to check M2 parasitic motions |
11x |
49
|
21 Feb 2023, 23:07 |
Jan-Etienne Pudell | | shift summary | - Tunnel + experimental hutch alignment
(Mirrors, CRL1 and CRL2)
- Aligned main devices: Optics |
|
52
|
23 Feb 2023, 01:51 |
Jan-Etienne Pudell | | shift summary | After realignement of M1 and M2 we could
solve the problem of the elogated beamprofile.
Different lens setting were prealignd for |
|
53
|
24 Feb 2023, 00:55 |
Jan-Etienne Pudell | | shift summary | We tested pulse on demand scans with
scantool and confirmed that there is only
one shot per scan point. This was used to |
|
81
|
15 Mar 2023, 01:50 |
Johannes Moeller | | shift summary |
HXRSS delivery, 600 - 700 uJ, 1
bunch, 8.991 keV. Pedestal visibly in HIREX,
not checked with MID spectrometer yet.
beamline |
|
87
|
18 Mar 2023, 01:45 |
Johannes Moeller | | shift summary |
stable HXRSS delivery at 8.99 keV,
1 bunch. XGM intensity during the day decreased
from 750 uJ to 600 uJ.
Vacuum |
|
88
|
19 Mar 2023, 02:01 |
Johannes Moeller | | shift summary |
upper and lower branch of SDL aligned
beamsizes
and angular mismatch characterized
vacuum
leak of flight path fixed
side |
|
154
|
24 Apr 2023, 02:45 |
Ulrike Boesenberg | | shift summary |
Beam came back quickly
after cryo-incident with ok seeding performance |
|
191
|
07 May 2023, 06:52 |
Giuseppe Mercurio | SCS | shift summary | achievements:
measured delay scans on
16 nm samples at different magnetic fields |
|
285
|
02 Aug 2023, 06:44 |
Giuseppe Mercurio, Teguh Asmara | SCS | shift summary | achievements:
beam transport with the
second half of undulators closed
measured |
|
445
|
13 Nov 2023, 07:16 |
Loic Le Guyader | SCS | shift summary | # Shift Summary
Achievements
- Measured elastic line with |
|
465
|
24 Jan 2024, 14:00 |
Antje Trapp | XRO | scanning for HED beam | We found reflection of M3 on M2 popin,
but could not locate the beam on HED PBLM
nor HED_XTD6_SDLBM-1 |
|
218
|
02 Jun 2023, 06:17 |
Tommaso Mazza | | pointing stability | we lost spatial overlap on several instances.
It seems that this happens when
SASE2 changes number of pulses. |
|
411
|
25 Oct 2023, 06:02 |
Chan Kim | SPB | other | Issue solved (elog:410)
after changing NKB mirror coating to B4C.
|
|
459
|
24 Nov 2023, 20:48 |
Chan Kim | SPB | other | Beam drift in the horizontal direction
(XTD9_XGM x position) started at around 10am
and continuously drifted until 16:00. |
|