Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 15 of 24  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  189   06 May 2023, 23:15 Sergii, PhuongSCSLate shift summary 06.05.2023Achivments:

-Measure delay scans at two PPL
fluencies on smaller grain size.
  
  187   06 May 2023, 14:42 Giuseppe MercurioSCSmorning shift summaryachievements


finished recording dataset
at 20degree
changed for sample
  
  185   06 May 2023, 06:55 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~1.2 mJ / pulse


Optical
  
  188   06 May 2023, 06:53 Giuseppe MercurioSCSnight shift summaryachievements:

- measured delay scans at sample
tilted by 20 degree
  
  186   06 May 2023, 06:53 Giuseppe MercurioSCSnight shift summaryachievements:

- measured delay scans at sample
tilted by 20 degree
  
  184   06 May 2023, 02:19 Jan-Etienne PudellMIDShift summary- We get stable x-ray delivery with 130µJ.

 

- We could move the detector succesfully
  
  183   05 May 2023, 23:00 Sergii, PhuongSCSLate shift summary 05.05.2023Achivments:

-Measure time scans with magnetic
field in opposite directions
  
  182   05 May 2023, 16:51 Jan GruenertPRCSA2 statusMID reports an observation that
is particular to the operation at the currently
high photon energy of 23 keV
  
  181   05 May 2023, 14:56 Giuseppe MercurioSCSmorning shift summaryachievements


with help from LAS OCD,
we got the PPL synchronized again with optical
  
  180   05 May 2023, 07:23 Giuseppe MercurioSCSRe: Shift summaryActually, it looks like the sync was lost
shortly before 23h last night as the jitter
went to 0fs and recovered at 1am when a new
 optical_sync_2023-05-05_07-21-35.png 
  178   05 May 2023, 06:44 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~0.8 mJ / pulse


Optical
  
  179   05 May 2023, 06:33 Giuseppe Mercurio, Diego, Martin, AminaSCSShift summaryachievements:


inserted the magnet and
measured delay scan at the maximum magnetic
  
  177   05 May 2023, 02:16 Jan-Etienne PudellMIDShift summaryX-ray delivery:

- stable at 120µJ, mostly
63 pulses
  
  176   05 May 2023, 00:50 Tokushi SatoSPBIssueLaser synchronization is gone, unlocked
from 04.05.2023, 22.47. E-mail was sent to
lbsync-expert@desy.de and c.c. to las-op@xfel.eu.
 Screenshot_from_2023-05-05_00-31-48_1.png 
  175   04 May 2023, 22:58 Sergii, PhuongSCSLate shift summary 04.05.2023Achivements:

-Cooling down the sample. Sample
is at 14K
  
  174   04 May 2023, 14:34 Loic Le GuyaderSCSmorning shift summaryachievements


we change the DSSC timing
to record the first pulse
sample
  
  173   04 May 2023, 06:41 Tokushi SatoSPBShift summaryX-ray delivery


12.4 keV 200 pulses / train,
relatively stable intensity ~0.8 mJ / pulse
took
  
  172   04 May 2023, 01:22 Jan-Etienne PudellMIDShift summaryShift summary:

- get the beam with 23keV and 120µJ 

- falignment of mirrors m1 and
  
  171   04 May 2023, 00:52 Sergii ParchenkoSCSLate shift sumamry 03.05.2023Achivments:

- X-ray and Laset spot size calibration

- Course timing check
  
  170   04 May 2023, 00:07 Jan GruenertPRCSA1 statusSASE1 status:

First shift switchover this week
at 23h from FXE (19.5 keV) to SPB/SFX (12.4
  
ELOG V3.1.4-7c3fd00