Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 50 of 64  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Location Severity Subject Text Attachments
  576   01 Mar 2024, 14:05 Orkidia BilaniXHEXPInformationGeneral-> Stromkabel @SQS:

The yellow and the orange ones
was/is on the way in the experiment hall,
 IMG_20240301_102411_MP.jpgIMG_20240301_103222_MP.jpgIMG_20240301_135236_MP.jpg 
  582   05 Mar 2024, 14:42 Orkidia BilaniXHEXPInformationDamaged concrete floor in SASE3 and SASE2The damages of the concrete floor in SCS
area and SASE3 in general, as well as the
damages in SASE2 under the truck bay were
  
  590   08 Mar 2024, 15:37 Orkidia BilaniXHEXPInformationSXP Support SXP wanted to buy and place a cabinet under
the stairs in front of their experiment hutch
and asked for advice. Unfortunately it wouldn't
 IMG_20240308_133712_MP.jpgIMG_20240308_132948_MP.jpgIMG_20240308_132930_MP.jpgIMG_20240308_133016_MP.jpgIMG_20240308_133000_MP.jpg 
  591   11 Mar 2024, 10:26 Orkidia BilaniXHEXPInformationNot needed consumables A palett with unneeded consumables was
sent to the warehouse and O. Smith will take
care of that.
 IMG_20240311_095758_MP.jpg 
  597   13 Mar 2024, 15:42 Orkidia BilaniXHEXPInformationSXP: Consumables StorageV. Vardanyan (SXP) gave a box full of consumables
for the consumables storage.
 IMG_20240313_170301_MP.jpg 
  598   13 Mar 2024, 21:09 Orkidia BilaniXHEXPInformationConsumables StorageSorted out a box with screws, nuts, u.Ä.,
which was donated from SXP.
  
  603   15 Mar 2024, 10:57 Orkidia BilaniXHEXPInformationSCS: Consumables StorageSCS gave a box full
of consumables for the consumables storage.
 IMG_20240315_095619_MP.jpg 
  607   18 Mar 2024, 08:03 Orkidia BilaniXHEXPInformationWaste in the Experiment Hall Disposed waste from the Experiment Hall.  IMG_20240318_075824_MP.jpg 
  610   19 Mar 2024, 14:32 Orkidia BilaniXHEXPInformationSCS TransportDiscussed with J.T. Delitz about the transport
of their components. He will label the parts
and where to be transported. We'll find
  
  611   20 Mar 2024, 10:55 Orkidia BilaniXHEXPInformationSCS Support: Transport to Warehouse SCS: Brought a chiller and a pallet with
boxes with equipment at the warehouse.
 IMG_20240320_102226_MP.jpgIMG_20240320_102653_MP.jpg 
  614   22 Mar 2024, 13:47 Orkidia BilaniXHEXPInformationSQS: Emergency craning Craned for SQS the chain of the manual
crane. 

This because the REMI needed to
 IMG_20240322_111619_MP.jpg 
  621   25 Mar 2024, 14:22 Orkidia BilaniXHEXPProblemTerminal at XHEXP1: TH1 near SQSThe transponder system on the turnstile
near SQS (TH1)  doesn't work. Informed
SRP and they are working on it.
  
  623   27 Mar 2024, 14:06 Orkidia BilaniXHEXPInformationWork on the Consumables' Storage26.03.2024: Planned and worked on the consumables's
storage.

 
  
  629   03 Apr 2024, 08:27 Orkidia BilaniXHEXPInformationHiBEF WasteDisposed the left over waste from the pulser
(Baureste) out of the Experiment Hall.

Co-workers: B.Näser, O.Bilani
 IMG_20240403_081513_MP.jpgIMG_20240403_081937_MP.jpg 
  635   10 Apr 2024, 08:16 Orkidia BilaniXHEXPInformationWaste Disposed waste (Brandlast) out of the Experiment
Hall.
 IMG_20240410_080713_MP.jpg 
  664   26 Apr 2024, 16:19 Orkidia BilaniXHEXPInformationConsumables' storage The four pallets with consumables, which
O.Smith gave, have been all placed ordered
in the cabinets of XHCrew consumables'
 IMG_20240426_140309_MP.jpgIMG_20240426_140319_MP.jpg 
  679   09 May 2024, 14:25 Orkidia BilaniXHEXPInformationSASE3: Dräger, SCS Empore T. Mazza (SQS) called to inform about an
alarm at the Dräger gas cabinet.

Went to quit/mute the alarm (yellow
 IMG_20240509_105827_MP.jpgIMG_20240509_105859_MP.jpg 
  680   11 May 2024, 11:39 Orkidia BilaniXHEXPInformationSASE3: Dräger, SCS Empore The battery for the "Notstromausfall"
needs to be exchanged. C.Holz ordered already
new ones and will exchange them as soon
 IMG_20240511_091631_MP.jpg 
  681   11 May 2024, 12:24 Orkidia BilaniXHEXPInformationMID: He 5.0Moin Sascha,

wie telefonisch besprochen, am
Montag früh braucht MID He 5.0. Es sind
  
  682   11 May 2024, 13:36 Orkidia BilaniXHEXPInformationSCS: PumpedisplayNear the SCS Clean Tent, where the big
chamber is, below, on the pump there is a
control monitor/display. It peeps and perhpas
 IMG_20240511_125033.jpgIMG_20240511_125056_MP.jpg 
ELOG V3.1.4-7c3fd00