  17   09 Dec 2016, 15:31 Frederike WittmaackGeneralInformationMeeting Minutes 09 Dec 2016
http://tinyurl.com/gqykf7z
  16   07 Dec 2016, 17:09 Frederike WittmaackGeneralInformationMeeting Minutes 02 Dec 2016
http://tinyurl.com/hzq7ats
  15   02 Dec 2016, 11:47 Frederike WittmaackGeneralInformationRemote access to control network form
http://tinyurl.com/jskzj2h
  14   02 Dec 2016, 11:46 Frederike WittmaackGeneralInformationMeeting Minutes 25 Nov 2016
http://tinyurl.com/jydty26
  13   02 Dec 2016, 11:43 Sabine CunisXTD2Informationnew components list

please find the new (extended) components list under the old link given in the minutes http://tinyurl.com/zn7otsa ,

and check whether all components are included and charakterized by the correct data.

 

  12   24 Nov 2016, 11:38 Frederike WittmaackGeneralInformationMeeting Minutes 17 Nov 2016
http://tinyurl.com/hxaxdm9
  11   14 Nov 2016, 14:10 Frederike WittmaackGeneralInformationMeeting Minutes 11 Nov 2016
http://tinyurl.com/juhjcbf
  10   11 Nov 2016, 15:43 Tobias HaasGeneralInformationMandate for the Extension of the Vacuum Controls Commissioning Task Force

The Vacuum Controls Commissioning Task Force initially helped to get the vacuum components extending from the gate valve at 2678 m to the gate valve at 2730 m in XTD2. This comprised the valves and pumps and the associated vacuum interlock logic. The necessary components were all installed and locally tested. As the next step the PLC firmware for the control of these devices was generated including the interlock logic. Finally the system was connected to version 1.47 of Karabo, which was able to monitor and control all components. A live demonstration is currently still outstanding.

 

As the next step the vacuum section considered should be extended upstream to include all components up to the gate valve at 2630m. In addition to vacuum components this should include the installed photon beam line components. The goal is to include all these systems into one continuous vacuum, commission all systems locally, generate the PLC firmware, implement the required vacuum interlocks, monitor the state of the system remotely via the PLC command line interface and eventually connect to Karabo and monitor and control the system via Karabo remotely using the consolidated version 2.0. While this commissioning effort is going on, development should occur on three days during the week (Mo-Wed) while the system should be operated continuously during the remaining time, thus also testing long-term stability. This should be achieved by the end of 2016.

  9   09 Nov 2016, 15:36 Tobias HaasGeneralInformationUpdate of Component list

I have included the status columns provided by Alessandro and Sandor in the component list. Please find it in the usual location here: http://tinyurl.com/zn7otsa

Attachment 1: elog.tiff
  8   07 Nov 2016, 19:15 Alessandro SilenziXTD2InformationKarabo Installation back to normal

 Karabo to PLC communication has been tested successfully in the SA1 Vacuum installation.

in attachment:

OK.png -> Initial Status, all OK

interlocked.png -> pump P10300I is turned off -> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false

afteron.png ->  pump P10300I is turned on again but-> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false

backToNormal.png -> Like initial status but valves stay closed

 
Attachment 1: OK.png
OK.png
Attachment 2: interlocked.png
interlocked.png
Attachment 3: backToNormal.png
backToNormal.png
Attachment 4: afteron.png
afteron.png
  7   04 Nov 2016, 18:08 Alessandro SilenziGeneralInformationBeckhoffDevices back to responsive

 I reproduced the behaviour of the PLC on beckhoffSim. This reproduces the same behaviour seen in the tunnel devices (devices hang).

Implemented the fix and verified the correct behaviour with beckhoffSim.

Fixes will be verified next Monday with the tunnel system.

Have a nice weekend

Alessandro

 

ps: For future reference:

beckhoffSim  tags/1.1.0-1.4  (implements the recent plc behaviour (framework tag N/A Could not find tobias))

beckhoffDevices tags/2.0.1-1.4 hangs

beckhoffDevices tags/2.0.2-1.4 does not

 
  6   04 Nov 2016, 14:22 Frederike WittmaackGeneralInformationMinutes - Meeting November 4, 2016
http://tinyurl.com/jbog6tz
  5   04 Nov 2016, 08:03 Frederike WittmaackGeneralInformationMinutes of last weeks meeting (Oct 28, 2016)
http://tinyurl.com/jy5rsbx
  4   03 Nov 2016, 17:00 Sabine CunisXTD2Informationoverview of required racks

just for reference ... here are pictures and schematics of the racks which are involved in the current commissioning.

Attachment 1: VCCT_Rack_1p06_b.jpg
VCCT_Rack_1p06_b.jpg
Attachment 2: VCCT_Rack_1p07_b.jpg
VCCT_Rack_1p07_b.jpg
  3   03 Nov 2016, 12:58 Alessandro SilenziXTD2InformationCurrent PLC-Karabo Conflict

Tobias Freyermuth and me worked on the system and as of last night, we found two new issues between Karabo and the PLC interlock:
 - one is a Karabo issue from the Interlock PLC interaction, the Karabo device waits for a PLC response that does not come when the PLC is interlocked (i.e. Karabo wants to open a valve but the PLC correctly refuses and ignores the command)


 - one is a PLC issue, the interlock is not triggered in all cases after testing (e.g. a ion pump out of set point does not closes a gate valve closure as specified).

The first one was reproduced with the BeckhoffSim simulation. It can therefore be fixed by CAS without dependencies from AE (except for the next integration test).

  2   26 Oct 2016, 14:26 Tobias HaasGeneralInformationMinutes of last week's meeting

 http://tinyurl.com/gvvv392

  1   26 Oct 2016, 13:55 Tobias HaasGeneralInformationStart of Logbook

Dear Colleagues,

in the future we would like to use this mechanism to record and exchange information that concerns the work done within the context of this task force. Please use this generously. We shall also put a link to the minutes after each weekly meeting.

 

regards,

 

Tobias 