Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 17 of 30  Not logged in ELOG logo
Entry   CAS OCD, posted by Jan Grünert on 18 Feb 2018, 17:20 
Entry   XTD1 open, posted by Jan Gruenert on 27 Mar 2018, 14:18 
Entry   exflgateway migration, posted by ITDM Admin on 31 Jan 2018, 10:06 
    Reply   Re: exflgateway migration, posted by ITDM Admin on 31 Jan 2018, 22:34 
Entry   CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid, posted by Hugo Silva Santos on 28 Apr 2017, 14:43 
Entry   ERRATA: CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid , posted by Hugo Silva Santos on 29 Apr 2017, 10:04 
Entry   CAS On-Call Duty Planning (Until 11/06), posted by Hugo Silva Santos on 16 May 2017, 14:55 
Entry   Karabo down in tunnel, posted by Hugo Silva Santos on 22 Aug 2017, 09:48 
    Reply   Karabo down in tunnel, posted by Hugo Silva Santos on 22 Aug 2017, 10:24 
Entry   Karabo 2.1.15 in Test , posted by Hugo Silva Santos on 22 Aug 2017, 10:53 
    Reply   Re: Status and plans after Readiness meeting, posted by Hugo Silva Santos on 10 Jan 2018, 14:53 
    Reply   Re: Status report after dispatch meeting 09.30, posted by Hugo Silva Santos on 29 Mar 2018, 09:48 
    Reply   Re: Status report after dispatch meeting 09.30, posted by Hugo Silva Santos on 13 Jun 2018, 11:07 
Entry   Karabo 2.2.4 released (mainly for ITDM, AE and DET) + Deployment dates, posted by Hugo Silva Santos on 25 Jun 2018, 09:45 
    Reply   Re: Karabo 2.2.4 released (mainly for ITDM, AE and DET) + Deployment dates, posted by Hugo Silva Santos on 10 Jul 2018, 11:23 
Entry   Status of Vacuum System , posted by Harald Sinn on 02 May 2017, 10:56 
Entry   XTD10 not open on Monday, posted by Harald Sinn on 11 May 2017, 18:26 
Entry   Restart vacuum loop now, posted by Harald Sinn on 12 May 2017, 08:21 
Entry   V0 open!, posted by Harald Sinn on 12 May 2017, 13:59 IMG_4609.jpg
Entry   Status of beam commissioning, posted by Harald Sinn on 27 May 2017, 16:31 
ELOG V3.1.4-7c3fd00