Shift summary, posted by Tokushi Sato on 11 Apr 2025, 23:14
|
X-ray delivery:
20 keV, ~ 400 uJ, 246 pulses, stable delivery
Optical Laser:
1030 nm, 850 fs, stable delivery
Achievements / Observations:
Spatial and temporal alignment of optical laser setup
Data collection |
Shift summary, posted by Tokushi Sato on 12 Apr 2025, 23:15
|
X-ray delivery:
20 keV, ~ 500 uJ, 246 pulses, stable delivery
Optical Laser:
1030 nm, 850 fs, stable delivery
Achievements / Observations:
Lots of data collection
Issues:
Shimadzu camera for Schlieren imaging had issue with shutter, mechanically broken. |
Shift summary, posted by Tokushi Sato on 13 Apr 2025, 22:55
|
Staff: PV, TS, JK, FK, + users
X-ray delivery:
20 keV, ~ 300-400 uJ, 250 pulses, stable delivery
Optical Laser:
1030 nm, 850 fs, stable delivery
Achievements / Observations:
Lots of data collection
Issues:
No major issue today |
Shift summary, posted by Tokushi Sato on 14 Apr 2025, 23:08
|
X-ray delivery:
20 keV, 250-400 uJ, 250 pulses, stable delivery
Optical Laser:
1030 nm, 850 fs, stable delivery
Achievements / Observations:
Lots of data collection
Issues:
No major issue today |
Shift summary, posted by Tokushi Sato on 25 Apr 2025, 06:48
|
X-ray delivery:
10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour
Optical Laser:
No PP-laser for this week
Achievements / Observations:
Finalized alignment of crystals
Issues:
No major issue today. |
Shift summary, posted by Tokushi Sato on 26 Apr 2025, 06:55
|
Staff: PV, TS, JK + external collaborators
X-ray delivery:
10 keV, ~ 800 uJ, 128 pulses, tuning was needed for 10 min.
Optical Laser:
No PP-laser for this week
Achievements / Observations:
Finalized alignment of X-ray setup
Issues:
No major issue today. |
Shift summary, posted by Tokushi Sato on 01 May 2025, 23:35
|
X-ray delivery
- 8.3 / 9.3 keV, 1400 uJ pulse energy, 1 hour down time
Optical laser delivery
- NS illumination
- 355 nm pump laser
Achievements/Observations
- PCS finished
- Preparation for the next experiment; mainly 355 nm.
|
Shift summary, posted by Tokushi Sato on 03 May 2025, 06:47
|
**X-ray delivery**
- 8.3 , 1600 uJ pulse energy
**Optical laser delivery**
- NS illumination
- 355 nm pump laser
**Achievements/Observations**
- Measured/tested various samples and different pump laser delays and illumination delays
**Issues**
- There was some sample that caused clogging in the morning |
Shift summary, posted by Tokushi Sato on 03 May 2025, 23:13
|
X-ray delivery
- 8.0 keV, 1600 uJ pulse energy
Optical laser delivery
- NS illumination
- 355 nm pump laser
Achievements/Observations
- Once again measured a lot of runs worth of data today
Issues
|
Shift summary, posted by Tokushi Sato on 04 May 2025, 23:14
|
X-ray delivery
- 8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day
Optical laser delivery
- NS illumination
- 355 nm pump laser
Achievements/Observations
- Once again measured a lot of runs worth of data today
Issues
|
Shift summary, posted by Tokushi Sato on 05 May 2025, 22:41
|
X-ray delivery
- 8.0 keV, 1300-1600 uJ pulse energy by the end
Optical laser delivery
- NS illumination
- 355 nm pump laser
Achievements/Observations
- Once again measured a lot of runs worth of data today
Issues
|
Issue, posted by Romain Letrun on 17 Mar 2025, 06:51
|
The status of the FXE shutter in the Public status display DOOCS panel is incorrect. Here appears as opened, when it is actually closed. |
Shift summary, posted by Romain Letrun on 30 Apr 2025, 22:46
|
X-ray delivery
Optical laser delivery
-
800 nm, 113 pulses, 564 kHz stable delivery
-
Illumination laser aligned
Achievements/Observations
Issues
-
PCS sample clogged (at filter not nozzle) after a few crystal shots
-
A few clogs with nozzle with lyzo, when X-ray were on, even far from the nozzle somehow the splash from the explosion grew on the tip
|
Issue, posted by Romain Letrun on 01 May 2025, 07:25
|
SPB pop-in monitor was not dricing to the switch when we retracted it to the "out " position with the MDL this morning. This prevented us to use more than two pulses. We have moved the motor one step of 300 um up, which activated the switch and relased the interlock. This should however be fixed so that the "out" position in the MDL works as expected and the motor operates reliably. |
Shift summary, posted by Raphael de Wijn on 05 Feb 2025, 23:42
|
X-ray delivery
- up to 202 pulses per train (~1 mJ pulse energy), 0.5 MHz.
Optical laser delivery
- PP laser aligned to the interaction point
Achievements/Observations
Preparation for user beamtime
- x-ray beam aligned and focused
- gotthard II ready
- PP laser aligned and ready
- ns laser aligned and ready
- inline mic aligned
|
Shift summary, posted by Raphael de Wijn on 06 Feb 2025, 23:13
|
X-ray delivery
- up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
Optical laser delivery
- OPO issue in the late shift
- PP laser aligned and timed both at the interaction point and in PAM
Achievements/Observations
- gotthard II used and working
- PP laser aligned and timed
- PAM aligned and timed
Issues
- issue with the OPO when we wanted to collect data
To do for next shift
- collect lysozyme for geometry and start user program
|
Issue, posted by Raphael de Wijn on 06 Feb 2025, 23:24
|
Damage on FEL imager was also seen by our morning shift around 7:50am. |
Shift summary, posted by Raphael de Wijn on 08 Feb 2025, 23:44
|
SPB/SFX 7955 Day 2
**X-ray delivery**
* up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
* A few beam downs toward the end of the shift
**Optical laser delivery**
* 420nm used for sample excitation. timed to 1ps with water jet interaction
**Achievements/Observations**
* x-ray beam de-focused to a few um for data taking
* PP laser aligned and timed
* runs for 1ps pumped data set
* good peak distribution at 11% transmission (100 CVD/ 200 CVD / None / 3200 CVD)
* hit rate better than previous day
**Issues**
* a lot of nozzle exchange
* sample most likely accumulating on the catcher entrance window
* DAMNIT issue with too many queued jobs, fixed by Oleksii (OCD)
**To do for next shift**
* finish power titration and continue with other time points |
Shift summary, posted by Raphael de Wijn on 10 Feb 2025, 00:56
|
SPB/SFX 7955 Day 3
X-ray delivery
-
up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
-
One longer down toward the end of the shift
Optical laser delivery
- 420nm used for sample excitation. timed to 1ps with water jet interaction
Achievements/Observations
-
x-ray beam de-focused to a few um for data taking
-
PP laser aligned and timed
-
runs for 1ps, 100ps and 100ns pumped data sets
-
hit rate much better (even > 10%) than previous day with small crystals
Issues
|
Shift summary, posted by Raphael de Wijn on 12 Mar 2025, 23:14
|
SPB/SFX shift summary user experiment 6933 (setup day)
X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses
Optical laser delivery
-ns laser for illumination
Achievements/Observations
- Beamline aligned
- Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
- Aligned and could see scattering from silver cubes
|