Shift summary, posted by Tokushi Sato on 11 Apr 2025, 23:14
|
X-ray delivery:
20 keV, ~ 400 uJ, 246 pulses, stable delivery
Optical Laser: |
Shift summary, posted by Tokushi Sato on 12 Apr 2025, 23:15
|
X-ray delivery:
20 keV, ~ 500 uJ, 246 pulses, stable delivery
Optical Laser: |
Shift summary, posted by Tokushi Sato on 13 Apr 2025, 22:55
|
Staff: PV, TS, JK, FK, + users
X-ray delivery:
20 keV, ~ 300-400 uJ, 250 pulses, stable delivery |
Shift summary, posted by Tokushi Sato on 14 Apr 2025, 23:08
|
X-ray delivery:
20 keV, 250-400 uJ, 250 pulses, stable delivery
Optical Laser: |
Shift summary, posted by Tokushi Sato on 25 Apr 2025, 06:48
|
X-ray delivery:
10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour
Optical Laser: |
Shift summary, posted by Tokushi Sato on 26 Apr 2025, 06:55
|
Staff: PV, TS, JK + external collaborators
X-ray delivery:
10 keV, ~ 800 uJ, 128 pulses, tuning was needed for 10 min. |
Shift summary, posted by Tokushi Sato on 01 May 2025, 23:35
|
X-ray delivery
8.3 / 9.3 keV, 1400 uJ pulse energy, 1 hour down time
Optical laser delivery
NS illumination
355 nm pump laser
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 03 May 2025, 06:47
|
**X-ray delivery**
- 8.3 , 1600 uJ pulse energy
**Optical laser delivery** |
Shift summary, posted by Tokushi Sato on 03 May 2025, 23:13
|
X-ray delivery
8.0 keV, 1600 uJ pulse energy
Optical laser delivery
NS illumination
355 nm pump laser
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 04 May 2025, 23:14
|
X-ray delivery
8.0 keV, 1300 uJ pulse energy by the end, it lowered during the day
Optical laser
delivery |
Shift summary, posted by Tokushi Sato on 05 May 2025, 22:41
|
X-ray delivery
8.0 keV, 1300-1600 uJ pulse energy by the end
Optical laser delivery
NS illumination
355 nm pump laser
Achievements/Observations |
Issue, posted by Romain Letrun on 17 Mar 2025, 06:51
|
The status of the FXE shutter in the Public status display DOOCS panel is incorrect. Here appears as opened, when it is actually closed. |
Shift summary, posted by Romain Letrun on 30 Apr 2025, 22:46
|
X-ray delivery
9.3 keV, 1800 uJ pulse energy
1 - 202 pulses at 564 kHz
Poor beam stability overall. Lots of intensity fluctuations and rather long time to recover after change of number of pulses in |
Issue, posted by Romain Letrun on 01 May 2025, 07:25
|
SPB pop-in monitor was not dricing to the switch when we retracted it to the "out " position with the MDL this morning. This prevented us to
use more than two pulses. We have moved the motor one step of 300 um up, which activated the switch and relased the interlock. This should however be fixed
so that the "out" position in the MDL works as expected and the motor operates reliably. |
Shift summary, posted by Raphael de Wijn on 05 Feb 2025, 23:42
|
X-ray delivery
up to 202 pulses per train (~1 mJ pulse energy), 0.5 MHz.
Optical laser delivery
PP laser aligned to the interaction point
Achievements/Observations |
Shift summary, posted by Raphael de Wijn on 06 Feb 2025, 23:13
|
X-ray delivery
up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
Optical laser delivery
OPO issue in the late shift
PP laser aligned and timed both at the interaction point and in PAM
Achievements/Observations |
Issue, posted by Raphael de Wijn on 06 Feb 2025, 23:24
|
Damage on FEL imager was also seen by our morning shift around 7:50am. |
Shift summary, posted by Raphael de Wijn on 08 Feb 2025, 23:44
|
SPB/SFX 7955 Day 2
**X-ray delivery**
* up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz. |
Shift summary, posted by Raphael de Wijn on 10 Feb 2025, 00:56
|
SPB/SFX 7955 Day 3
X-ray delivery
up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz. |
Shift summary, posted by Raphael de Wijn on 12 Mar 2025, 23:14
|
SPB/SFX shift summary user experiment 6933 (setup day)
X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses |