37
|
15 Mar 2025, 19:49 |
Harald Sinn | PRC | Status | MID called and reported issue with Dachs terminals at the user labs (probably no power). TS was informed. Because the lab are currently accessible (doors are locked open), TS will take care about it on Monday. |
36
|
12 Mar 2025, 23:14 |
Raphael de Wijn | SPB | Shift summary |
SPB/SFX shift summary user experiment 6933 (setup day)
X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses
Optical laser delivery
-ns laser for illumination
Achievements/Observations
- Beamline aligned
- Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
- Aligned and could see scattering from silver cubes
|
35
|
04 Mar 2025, 07:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 188/352 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples |
34
|
03 Mar 2025, 07:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 188 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples |
33
|
02 Mar 2025, 06:56 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 175 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
Issues
We could use 188 pulses, but last 13 pulses intensity was too weak, not used for measurement
|
32
|
01 Mar 2025, 11:53 |
Martin Dommach | PRC | Issue | Due to issues SCS has with pulses from SASE1 lasing in SASE3 and destroying, or at least modifying, their sample, it was decided to change the order in the RF configuration to have SASE3 pulses before SASE1. The change will be done at 12 pm, agreed with FXE.
The impact for SPB will be the loss a few pulses (5%), I contacted Richard to get confirmation that this is ok for SPB.
Best regards,
Martin (PRC week 9) |
31
|
01 Mar 2025, 06:56 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
|
30
|
28 Feb 2025, 06:57 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Data collection for some samples
Issues
No major issue today
|
29
|
27 Feb 2025, 07:02 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned
Fixed target measurement was finished |
28
|
25 Feb 2025, 02:41 |
Jayanath Koliyadu | SPB | Shift summary | X-ray delivery
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
Optical laser delivery
- 810 nm laser for illumination
-PP laser for excitation, 590 nm, 51 pulses, 141 kHz
Achievements/Observations
- Collected high resolution time resolved data
- Collected Tve_CPC500f and Tve_CPC1n data and completed Tve_CPC20p
|
27
|
21 Feb 2025, 23:21 |
Mohammad Vakili | SPB | Shift summary | SPB/SFX shift summary user experiment 8039
**X-ray delivery**
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
**Optical laser delivery**
-810 nm laser for illumination
**Achievements/Observations**
- Collected sample data for ca. 2h 15min using a DFFN
- XTD2 CRLs optimized and realigned
- Offset mirror M1/M2 optimized for 15 keV
- Repositioned the illumination fiber inside IRU chamber
- Germanium blades were installed for the IRU_Slit_4 (top and bottom)
**Issues**
- PP laser alignment could not be pursued as hexapod had to be repositioned first (interaction region was too close to exit cone)
|
26
|
20 Feb 2025, 23:29 |
Chan Kim | SPB | Shift summary | X-ray delivery
- 12.4 keV, 1.1mJ/pulse, 202 pulses/train at 0.56MHz
- Focused NKB beam was used
Optical laser delivery
- ns laser for jet visualization
Achievements/Observations
- Successfully finished all PCS beamtimes
- Stable jet with PEO sheath
Issues
- No beam in the morning
- Unstable jet with ethanol sheath
|
25
|
19 Feb 2025, 21:25 |
Chan Kim | SPB | Shift summary | X-ray delivery
-12.4 keV, 202 pulses, 0.5 MHz, 1mJ/pulse
Optical laser delivery
- ns laser (660 nm wavelength) for jet illumination
Achievements/Observations
- NKB focus optimized
- One PCS user program successfully finished
- Second PCS user program was just started
Issues
- Right before we could start with beam defocusing, the beam was gone around 8:45 pm. BKR called to let us know that there will be no beam today (cryo issues) |
24
|
17 Feb 2025, 06:57 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
runs for -1 ps - 1.5 ps
Very stable jet
PAM was installed |
23
|
16 Feb 2025, 06:46 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
runs for -1 ps - 1.5 ps
Very stable jet
Issues
No major issue
|
22
|
15 Feb 2025, 06:52 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 202 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
runs for -1 ps - 1.5 ps
Very stable jet
Issues
No major issue |
21
|
13 Feb 2025, 07:24 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
up to 352 pulses per train (~1.9 mJ pulse energy)@9.3 keV, 0.5 MHz ans 1.1 MHz. Beamdown for 40 min.
Optical laser delivery
800 nm, less than 20 fs at sample position, no issue
Achievements/Observations
X-ray beam de-focused to a few um for data taking
PP laser aligned and timed
1 hours data collection
Issues
AGIPD gain map was strange, some gain changes was observed without X-ray
Data was not migrated -> DRC was called and informed |
20
|
11 Feb 2025, 01:41 |
Tomas Popelar | SPB | Shift summary | SPB/SFX 7955 Day 4
X-ray delivery
Optical laser delivery
-
420nm used for sample excitation. timed to 1ps with water jet interaction
-
PAM set up for time points <1 ps
-
From 19:15 to 21:15 (100 uJ/cm2 data point) the feedback loops were off resulting in higher intensity fluctuations, resolved at 21:52
Achievements/Observations
-
x-ray beam de-focused to a few um for data taking
-
PP laser aligned and timed
-
PAM calibrated and used with YAG sample surviving 13% transmission
-
power titration at 100ns and fluences 13 mJ/cm2, 25 mJ/cm2, 100 mJ/cm2 and 191 mJ/cm2
-
delays 100 fs and 500 fs
-
good peak distribution at 13% transmission (None / None / None / 3200 CVD)
-
hit rate around 6%
Issues
|
Draft
|
10 Feb 2025, 00:56 |
Raphael de Wijn | SPB | Shift summary | SPB/SFX 7955 Day 3
X-ray delivery
-
up to 202 pulses per train (~1.4 mJ pulse energy), 0.5 MHz.
-
One longer down toward the end of the shift
Optical laser delivery
- 420nm used for sample excitation. timed to 1ps with water jet interaction
Achievements/Observations
-
x-ray beam de-focused to a few um for data taking
-
PP laser aligned and timed
-
runs for 1ps, 100ps and 100ns pumped data sets
-
hit rate much better (even > 10%) than previous day with small crystals
Issues
|
18
|
09 Feb 2025, 06:35 |
Peter Zalden | FXE | Shift summary | Preparation for user expt #7944
X-ray delivery
- Single pulses (10 Hz) at 9.3 keV, 2.3 mJ
- Again similar low pointing noise
Achievements/Observations
- Tested different substrates for deposition of ice
- Optimized ice deposition conditions
- Recorded example data to prepare analysis scripts
Handover
- Beam transport to SPB and 11 keV requested from BKR at 6:30h
|
|