  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 45     Entry time: 09 Apr 2025, 10:22
Author: Jan Gruenert 
Group: PRC 
Subject: SA3 status 

SASE3 Apple-X undulator cell 26 issue - SOLVED

During the night, an issue appeared with the SASE3 undulator cell 26 (2nd last Apple-X undulator).
This cell could not be operated and was in status open.
BKR therefore couldn't tune for linear vertical polarization as required by the SASE3 users at SXP.
A ZZ access was discussed and prepared with the experts from the undulator group.

However, they now found a way to repair the issue from remote without access (info from Mikhail Yakopov / undulator group at 10h20).
The issue is solved.

PRC will contact PES spectrometer experts at XPD to tune polarization monitoring with BKR.