Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 45     Entry time: 09 Apr 2025, 10:22
Author: Jan Gruenert 
Group: PRC 
Subject: SA3 status 

SASE3 Apple-X undulator cell 26 issue - SOLVED

During the night, an issue appeared with the SASE3 undulator cell 26 (2nd last Apple-X undulator).
This cell could not be operated and was in status open.
BKR therefore couldn't tune for linear vertical polarization as required by the SASE3 users at SXP.
A ZZ access was discussed and prepared with the experts from the undulator group.

However, they now found a way to repair the issue from remote without access (info from Mikhail Yakopov / undulator group at 10h20).
The issue is solved.

PRC will contact PES spectrometer experts at XPD to tune polarization monitoring with BKR.

ELOG V3.1.4-7c3fd00