Message ID: 53     Entry time: 17 Apr 2025, 01:39
Author: Chan Kim 
Group: SPB 
Subject: Shift summary 

X-ray delivery

  • 18.8 keV, 260 uJ pulse energy

Optical laser delivery

  • No optical laser

Achievements/Observations

  • Experimental setup optimized, both instrumental side and PIXIE side
  • X-ray beam focused to the PIXIE and transmission measurement was done with several different PIXIE operation conditions.

Issues

  • No beam for ~4.5 hours due to ZZ.
  • X-ray beam not found with IRDa InlineMic after focusing X-ray beam to IRDa sample plane.
  • InlineMic Y motor is in error states. It has to be fixed during the day.
  • upstream kapton window for the downstream vacuum pipe broken. The glue has become loose. No damage by X-ray was visible.