OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn
Not logged in
List
|
Message ID:
53
Entry time:
17 Apr 2025, 01:39
Author:
Chan Kim
Group:
SPB
Subject:
Shift summary
X-ray delivery
18.8 keV, 260 uJ pulse energy
Optical laser delivery
No optical laser
Achievements/Observations
Experimental setup optimized, both instrumental side and PIXIE side
X-ray beam focused to the PIXIE and transmission measurement was done with several different PIXIE operation conditions.
Issues
No beam for ~4.5 hours due to ZZ.
X-ray beam not found with IRDa InlineMic after focusing X-ray beam to IRDa sample plane.
InlineMic Y motor is in error states. It has to be fixed during the day.
upstream kapton window for the downstream vacuum pipe broken. The glue has become loose. No damage by X-ray was visible.