Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 1 of 11  Not logged in ELOG logo
ID Date Authordown Group Subject Text Attachments
  12   04 Feb 2024, 23:36 Wonhyuk JoMIDShift summaryGoal Achieved.
- Finished flat field measurement
for AGIPD at different scenarios for upcoming
  
  144   11 Aug 2024, 02:15 Wonhyuk JoMIDShift summaryFound the spatial overlap on the Suna microscope
with Zyla.
Found the SDL motor position giving
  
  147   12 Aug 2024, 02:07 Wonhyuk JoMIDShift summaryFound spatial overlap at Suna microscope
with Zyla cam.
The splitting ratio was obtained about
  
  149   13 Aug 2024, 02:04 Wonhyuk JoMIDShift summaryFound the interference fringe at Suna microscope
with Zyla cam from MID split-and-delay line. 
The fringe patterns were recorded
  
  164   13 Sep 2024, 02:16 Wonhyuk JoMIDShift summary- DAQ was crashed after taking darks of
AGIPD. It was solved by DOC and OCD.

- Laser could not switched from
  
  167   14 Sep 2024, 02:23 Wonhyuk JoMIDShift summary- The seeding optimization result: Total
450 uJ (Seeding of 150 uJ  + SASE of
300 uJ).  BKR will be able to start
  
  169   15 Sep 2024, 02:16 Wonhyuk JoMIDShift summary- The seeding optimization is ongoing,
which was not successful. Now we have a total
of 170 uJ including SASE and seeding. 
  
  171   16 Sep 2024, 02:21 Wonhyuk JoMIDShift summary- Pump-probe experiments are being conducted
using PuMa and PP laser. 
- The user program is ongoing over
  
  103   13 May 2024, 08:48 Ulrike BoesenbergMIDShift summaryWeekend summary:

Overall stable beam delivery with
300bunches @18keV and 750uJ
  
  196   31 Oct 2024, 02:43 Ulrike BoesenbergMIDShift summary12.389keV, HXRSS, 1-400+ bunches, 450uJ


Seeding alignment
Beamline
alignment (Mirror + foccussing)
Measured
  
  27   17 Feb 2024, 08:15 Tommaso MazzaSQSIssueThe cross on the FEL imager, which we use
as a reference for BKR crew, is not centred
on the GATT aperture. when was this changed,
 Screenshot_from_2024-02-17_08-12-43.pngScreenshot_from_2024-02-17_08-17-03.pngScreenshot_from_2024-02-03_16-06-39.png 
  53   15 Mar 2024, 18:02 Tommaso MazzaSQSStability Issueit is not clear why, but the beam position
on BIU2 has changed over time, even more
since we checked last. it is off in both
 Screenshot_from_2024-03-15_18-04-59.pngScreenshot_from_2024-03-15_18-04-39.png 
  98   09 May 2024, 10:45 Tommaso MazzaSQSotherwe needed SASE1 to be set to 0 pulses briefly
to check alignment in our experiment.

The FXE control hutch was empty.
  
  16   08 Feb 2024, 23:14 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  18   10 Feb 2024, 00:12 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1700
uJ. Stable delivery


Optical
  
  19   10 Feb 2024, 23:32 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1750
uJ. Stable delivery


Optical
  
  21   11 Feb 2024, 23:04 Tokushi SatoSPBShift summaryX-ray delivery
1-350 at 12.45 keV, 1700 uJ. Stable
delivery
  
  22   13 Feb 2024, 01:02 Tokushi SatoSPBShift summaryX-ray delivery


1-350 at 12.45 keV, 1600
uJ. Stable delivery


Optical
  
  28   21 Feb 2024, 23:00 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 250
pulses per train. 1.1 MHz with 400 uJ

Optical laser delivery: NA
  
  30   22 Feb 2024, 22:52 Tokushi SatoSPBShift summaryX-ray delivery: stable and flat over 190
pulses per train. 1.1 MHz with 200 uJ short
intervention needed to improve intensity
  
ELOG V3.1.4-7c3fd00