51
|
22 Feb 2023, 14:53 |
Peter Zalden | FXE | Stability Issue | Instability observed today at 14:05, reported
to PRC and BKR, including RC: We saw RMS
jitter amplitude of up to 4 mm at FXE imager. |
|
349
|
20 Sep 2023, 19:42 |
Peter Zalden | FXE | Issue | Connerning the phase shifter adjustment
after undulator gap scan via karabo:
At 19:30 FXE tested the scan change |
|
358
|
23 Sep 2023, 08:14 |
Peter Zalden | FXE | Issue | FXE interlock in fault state. See photo
attached with original error message from
6:53h. It cannot be reset by acknowledging. |
|
367
|
24 Sep 2023, 09:16 |
Peter Zalden | FXE | Shift summary | Summary for sept., 23rd
6:55 SPB just handed the beam over
to FXE when the power glitch killed the interlocks |
|
368
|
24 Sep 2023, 09:24 |
Peter Zalden | FXE | Shift summary | 7:00 Power glitch during SPB operation
- they were supposed to hand the beam back
at 7:30h |
|
331
|
05 Sep 2023, 22:33 |
Oliver Humphries | HED | Shift summary |
Received the beam from day shift,
aligned to beam stop (low signal due to 4m
air scatter, only 700uJ upstream)
ZYLA5 |
|
357
|
23 Sep 2023, 07:59 |
Oliver Humphries | HED | Shift summary | Shift summary from Monday 18th 7am until
Saturday 7am
MONDAY
Aligned |
|
18
|
05 Feb 2023, 12:32 |
Natalia, Zhong | SCS | morning shift summary | achievements:
- Viking spectrometer set up in 8th
order around 1280eV and calibrated |
|
366
|
24 Sep 2023, 07:49 |
Natalia, Justina, Giacomo, Sergey, Ben, Eugenio, Teguh | SCS | summary of 23.09 | Around 6:55 there was a power glitch. Power
in the experimental hutch and rack room went
down in SASE3, error message in Xray interlock |
|
100
|
23 Mar 2023, 13:07 |
Naresh Kujala | XPD | Status | Update for elog 99:
Now Gotthard timing is changed
to new setting for 0.5 MHz. |
 |
104
|
24 Mar 2023, 19:42 |
Naresh Kujala | PRC | Status | Reply to elog103:
Spoke with Machine RC Thomas Wamsat
and SQS. |
|
109
|
26 Mar 2023, 13:26 |
Naresh Kujala | PRC | Status | Machine RC Raimond informed PRC that
there is an issue with the A4 module that
needs to fix to have a continuous operation. |
|
162
|
28 Apr 2023, 11:21 |
Naresh Kujala | PRC | Issue | Issue with SA1_XTD9_PBLM and it is stuck.
Hi All,
After discussion with SPB, they |
|
163
|
28 Apr 2023, 13:00 |
Naresh Kujala | PRC | Issue | - Received a call from machine RC (Sergey
Tomin)
- There is an issue with DOOCS |
|
164
|
28 Apr 2023, 16:08 |
Naresh Kujala | PRC | Attention | FXE (Fred) confirmed that they don't
use beam for night shifts from Friday to Sunday.
|
|
214
|
31 May 2023, 17:35 |
Naresh Kujala | PRC | Issue |
HED reported that they are unable
to go 352 pulses and while changing/dailing |
|
226
|
05 Jun 2023, 08:28 |
Naresh Kujala | PRC | Status | - SA2 photon beamline
Today morning found the CRL1: 5
and 6 arm and Pop-in 45-I are still IN. I |
|
227
|
06 Jun 2023, 08:28 |
Naresh Kujala | XPD | Status | SA2 photon beamline
- SRA position were 7 mm x
7 mm, MID reported they see the hallow of |
 |
Draft
|
22 Aug 2023, 15:52 |
Naresh Kujala | PRC | SA1 status | SA1 photon beam line status
- CRL1 lenses are in the beam.
- The shutter between XTD2 and |
|
316
|
22 Aug 2023, 15:56 |
Naresh Kujala | PRC | SA1 status | SA1 photon beam line status
- CRL1 lenses are in the beam.
- The shutter between XTD2 and |
|
|