Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 24 of 24  Not logged in ELOG logo
Entry   All SASE's - SEPS Interlock Test - Results, Status & Upcoming Schedule, posted by Raśl Villanueva-Guerrero on 25 Jan 2023, 08:40 
Dear all,

please find here a summary of the status on this critical topic provided yesterday evening (around 19:15) by Zunaira Ansari (extract from her
e-mail).
Entry   Status, posted by Jan Gruenert on 23 Jan 2023, 10:43 JG_2023-01-23_um_10.04.56.png
Status of machine SASE tuning (just before switching off for monday maintenance):




11.5 GeV operation
SASE1
SASE2
SASE3


Photon
energy
7 keV
7 keV
700 eV


Max. obtained average pulse energy
3.25 mJ
1.35
Entry   Issue, posted by Jan Gruenert on 22 Jan 2023, 18:40 JG_2023-01-22_um_17.43.36.pngJG_2023-01-22_um_18.17.31.pngJG_2023-01-22_um_18.23.20.pngJG_2023-01-22_um_18_1.37.21.png
SASE1 blocked to 1 bunch/train by EPS interlock (sic, not 2 but 1) --- PARTIALLY RESOLVED

Several issues:

1) MODEM device is broken, in state UNKNOWN, see ATT#1 and ATT#2. Fixed with deinstatiating and then using BECKHOFF_ASSISTANT to re-instantiate.
Entry   Analyze and quantify the mispositioning of the new 4mm-aperture behind the undulator, posted by Jan Gruenert on 21 Jan 2023, 16:38 JG_2023-01-21_16-06-48.pngJG_IMGFEL_2023-01-21_16-21-01.pngIMGFEL_no_cross_2023-01-21_16-27-22.pngIMGFEL_with_cross_2023-01-21_16-30-16.png
Goal: Analyze and quantify the mispositioning of the new 4mm-aperture behind the undulator

Positions in tunnel:


ABSP4.2422.SA2 = ABSP4.CELL37.SA2 L_z position 2422.558m
Last closed undulator for this test is cell16 at 2294m (at end of
Entry   Issue, posted by Jan Gruenert on 17 Jan 2023, 10:25 JG_SASE3_no_beam_permission_2023-01-17_09-13-31.png
SASE3 peration issue - SOLVED

 

Controls issue, the machine cannot make beam in SASE3.

From
BKR / DOOCS the problem description is: Big Brother is blocking SASE3 beam due to an EPS power limit of 0 Watt.


Looking into the SASE3 karabo topic, many devices are not instantiated, ATT #1.

The state of the PREABS  preabsorber is not known
Entry   Issue, posted by Jan Gruenert on 16 Jan 2023, 19:50 JG_2023-01-16_um_16.30.12.pngJG_2023-01-16_um_16.30.50.png
Problem: Beam operation in SASE2 is prohibited by SEPS / MPS
Origin of problem: HED-CRL3
(this was already an issue during the past weekend)
Entry   CRL3: recalibration of y axis, test of x range and move to SEPS interlock trigger position, posted by karen appel on 16 Jan 2023, 16:01 
CRL3 arm 2, 5 and 9 were mecanically religned to the V groove and retracted to some y position.

The y motor position was recalibrated by moving the motor to the lower limit switch, moving it up by 0.5 mm and then recalibrating the motor
and encoder position to the former software limit position.
Entry   Status, posted by Theophilos Maltezopoulos on 16 Jan 2023, 11:33 
I started the upstream XGMs in XTD2, XTD1, and XTD10.
ELOG V3.1.4-7c3fd00