184
|
06 May 2023, 02:19 |
Jan-Etienne Pudell | MID | Shift summary | - We get stable x-ray delivery with 130µJ.
- We could move the detector succesfully |
|
190
|
07 May 2023, 02:23 |
Jan-Etienne Pudell | MID | Shift summary | We had stable x-ray delivery with 120µJ
and up to 300 pulses.
Successful user data acquisition |
|
194
|
08 May 2023, 02:38 |
Jan-Etienne Pudell | MID | Shift summary | Stable beam delivery with 23keV and 140µJ
at 2.2, 1.1 and 0.55MHz
|
|
3
|
16 Jan 2023, 19:50 |
Jan Gruenert | PRC | Issue | Problem: Beam operation in SASE2
is prohibited by SEPS / MPS
Origin of problem: HED-CRL3 |
 |
4
|
17 Jan 2023, 10:25 |
Jan Gruenert | PRC | Issue | SASE3 peration issue - SOLVED
Controls
issue, the machine cannot make beam in SASE3.
From
BKR / DOOCS the problem description is: Big |
|
5
|
21 Jan 2023, 16:38 |
Jan Gruenert | XPD | Analyze and quantify the mispositioning of the new 4mm-aperture behind the undulator | Goal: Analyze and quantify the
mispositioning of the new 4mm-aperture behind
the undulator |
   |
6
|
22 Jan 2023, 18:40 |
Jan Gruenert | PRC | Issue | SASE1 blocked to 1 bunch/train
by EPS interlock (sic, not 2 but 1)
--- PARTIALLY RESOLVED |
   |
7
|
23 Jan 2023, 10:43 |
Jan Gruenert | PRC | Status | Status of machine SASE tuning
(just before switching off for monday maintenance):
|
|
133
|
10 Apr 2023, 02:16 |
Jan Gruenert | XPD | SPB_XTD9_IMGPII45 lost steps - REPAIRED | REPAIRED / FIXED
Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost |
|
132
|
10 Apr 2023, 02:25 |
Jan Gruenert | XPD | Issue | REPAIRED / FIXED
Problem: The imager
SPB_XTD9_IMGPII45 insertion motor lost |
|
136
|
13 Apr 2023, 15:57 |
Jan Gruenert | XPD | Shift end | End of Diamond Sensor Study
We leave the SASE2 beamline in
the following safe state: |
|
169
|
03 May 2023, 13:01 |
Jan Gruenert | PRC | Status | The machine tuning over the night had not
yet accomplished fully satisfactory beam
conditions mainly at the high photon energies |
|
170
|
04 May 2023, 00:07 |
Jan Gruenert | PRC | SA1 status | SASE1 status:
First shift switchover this week
at 23h from FXE (19.5 keV) to SPB/SFX (12.4 |
|
182
|
05 May 2023, 16:51 |
Jan Gruenert | PRC | SA2 status | MID reports an observation that
is particular to the operation at the currently
high photon energy of 23 keV |
|
195
|
08 May 2023, 09:04 |
Jan Gruenert | PRC | Attention | Info from XRO (Maurizio Vannoni) to PRC
concerning tunnel access
request #152936 (Inspection and repair of |
|
231
|
08 Jun 2023, 10:37 |
Jan Gruenert | PRC | Issue | SASE2 vacuum incident
7h10
: MID informs PRC about a vacuum incident
in the SASE2 tunnel which tripped the beam. |
|
233
|
08 Jun 2023, 17:05 |
Jan Gruenert | PRC | Issue | SA2_XTD1_ATT solid attenuator
vacuum issue
Info
from VAC (Raul Villanueva) 12h30: |
|
236
|
09 Jun 2023, 12:37 |
Jan Gruenert | PRC | Issue | Repair of SA2_XTD1_ATT
Status 12h30:
The current MID users took beam until |
|
241
|
10 Jun 2023, 18:46 |
Jan Gruenert | PRC | Issue | 18h05 : RC informs:
Machine is down, because Cryo-OK
was lost. |
|
242
|
10 Jun 2023, 21:52 |
Jan Gruenert | PRC | Status | The Cryo team solved the problems, beam
is back.
Downtime from 17h59 until 21h03. |
|