Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 11 of 24  Not logged in ELOG logo
Entry   Shift summary of SASE1 alignment, posted by Kelin Tasca on 20 Jul 2023, 20:21 
Beam aligned to SPB Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/185

Beam aligned to FXE Pop-In https://in.xfel.eu/elog/XRO+Beam+Commissioning/187

Vibration tests: https://in.xfel.eu/elog/XRO+Beam+Commissioning/188
Entry   FXE beam alignment 9 keV 2 mrad, posted by Kelin Tasca on 20 Jul 2023, 18:23 2023-07-20_17-34-11_SA1_FXE_alignment.png2023-07-20_17-10-45_SRA.png
 
Entry   Shift summary of SASE2 alignment, posted by Antje Trapp on 20 Jul 2023, 18:20 
Mirror pitch motors Ry were tested after scaling was changed to um.

Tx and Ry motor positions were calibrated to their measured physical positions.

ALL PREVIOUSLY SAVED SETTINGS FOR SASE2 MIRRORS ARE OBSOLETE!
Entry   SPB beam alignment 1 keV 2 mrad, posted by Kelin Tasca on 20 Jul 2023, 18:17 2023-07-20_16-46-47_beam_on_SPB_after_pointing.pngFEL__2023-07-20_16-42-57.png
 
Entry   Shift summary: 19. July, posted by Mikako Makita on 19 Jul 2023, 20:09 8x
Summary of today's activity:


Beam handover ~ 3pm.
SA2 mirror set tp B4C.
SA2 Rough alignment to MID & HED @ ~ 2-2.5 mrad ==> img 1, 4,
5 & 6
SA2 HED-Preabsorber position check with x-ray (working) ==> img 2 &3
SA3 M6 mirror Switch check (seems to be working)
SA1
Entry   ALL RY MOTORS ARE IN MICROMETER SCALING, posted by Antje Trapp on 19 Jul 2023, 12:34 
This has several implications:

- ALL PREVIOUSLY SAVED RY POSITIONS ARE OBSOLETE!

- Ry values seem to have changed by a factor of 1000
Entry   New screens installed in FEL imager SA3, posted by Andreas Koch on 21 Jun 2023, 15:12 
YAG screen
The damaged screen "YAG2" with Al coating had marks and had been exchanged.
The Imager Watchdog now protects the screen - operational for some months i.e. the number of bunches is shut down to zero if the intensity at the
Entry   Shift start, posted by Jan Gruenert on 19 Jun 2023, 09:37 
Rampdown day activities

The main focus is as usual on checking all tunnel components and to identify any potential
issues that could be fixed during the maintenance period which will be starting this wednesday.
Entry   Shift summary, posted by Konopkova Zuzana on 19 Jun 2023, 05:34 

concluded user experiment on dynamically compressed water
long train operation worked relatively stable with no major interuptions
in beam delivery
Entry   Shift end, posted by Adam Round on 18 Jun 2023, 07:31 
posting for 17th June

Staff: AR, AS, FK, HH, JB, KK, DZ, MK

X-ray delivery
Entry   Strange pulse behavior upstream XGM, posted by Faisal Hammad Mekky Koua on 17 Jun 2023, 07:41 Screenshot_from_2023-06-17_07-40-49.png
- Pulse intensity decreases drastically at XTD2 across the train

- the visualisation of our beam therfore needs to be compensated adjusting transmission

- beam shape and uniformity is different than previous days and it is unclear how much of this is related to real changes in the beam or an effect
Entry   Shift summary, posted by Konopkova Zuzana on 17 Jun 2023, 07:27 
Beam 18 keV, 0.5 MHz, long trains up to ~280 pulses


change setup to dynamic DAC
prep for user beamtime: alignment of X-rays, focusing (~40 um), train-on-demand for long trains,
transmission runs
darks, XRD calibrations for AGIPD


Issues:
Entry   Status, posted by Abhisakh Sarma on 16 Jun 2023, 11:42 Screenshot_from_2023-06-16_11-41-39.png
Beam is back at around 11:30 pm

We lost 1 hr 30 min of beam time.(it was promised to get back at around 10:00 am)

If we want to change the pulse number then we need to call BKR.
Entry   Issue, posted by Michaela Petrich on 16 Jun 2023, 06:28 
staus of JUN16, 11:30

SA1 and SA3 have been adjusted to acceptable conditions to be compatible with simultaneus operation at SA2

tuning on SA2 is ongoing
Entry   Shift summary, posted by Johan Bielecki on 15 Jun 2023, 23:08 
X-ray delivery


12.42 keV, stable delivery in single pulse mode with 1.9 mJ/pulse


Optical laser delivery


532 nm ns-laser for sample pumping


Achievements/Observations
Entry   Shift summary, posted by Konopkova Zuzana on 15 Jun 2023, 06:41 
18 keV, 150 uJ per pulse, 2.2 MHz


continuing user program proposal 3285
X-ray heating and laser heating samples in DACs
using only the first 200
pulses of the train as the intensity after decreases fast, conversion of the samples is difficult due to low pulse energies
Entry   Shift summary, posted by Konopkova Zuzana on 13 Jun 2023, 23:08 
beam: 18 keV, 352 pulses, ~200 uJ per pulse

achievements:


AGIPD timing scans, AGIPD darks.
beam alignment, CRL3 focusing, prep for the user beamtime


beam conditions:
Entry   Vacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Closing report , posted by Raśl Villanueva-Guerrero on 13 Jun 2023, 11:23 
Dear all,

the closing report on this issue can be found in the following Alfresco link:

https://docs.xfel.eu/share/s/GzxORQOGToe_tiug7LIHhQ 
Entry   Taking the beam , posted by Abhisakh Sarma on 13 Jun 2023, 06:49 Screenshot_from_2023-06-13_06-57-01.png
BKR changed the beam energy from 15 keV to 12.4 keV

Energy 12.4 keV

Repeatation rate 1.1 MHz
Entry   Shift summary, posted by Chan Kim on 12 Jun 2023, 07:16 
X-ray delivery


12.42 keV, stable delivery with slightly less than 1.0 mJ/pulse (~0.95 mJ/pulse)


Optical laser delivery


none


Achievements/Observations
ELOG V3.1.4-7c3fd00